Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction113p · 5 filings · 20 docs
Floor 3Under Construction123p · 5 filings · 20 docs
Floor 2Under Construction126p · 6 filings · 20 docs
Floor 1Under Construction123p · 5 filings · 20 docs
CellarUnder Construction152p · 6 filings · 20 docs
Site & exterior35p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EKDOTHEEN8809/20/2026
J G CONSTRUCTION SRVCS507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/09/2021$7.5M—— → —$1,826/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RJD ENGINEERING LLC209/03/2026
BAXT INGUI ARCHITECTS1508/28/2026
GAMILL ENGINEERING, P.C502/25/2026
PETER GARLAND302/25/2026
STRUCTURAL ENGINEERING INTEGRATED106/12/2024
ASHRAF CORP103/27/2024
TECTONIC ENGINEERING305/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC4803/21/2026
BIG ORANGE EXPEDITING203/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DYNAMIC RECONSTRUCTION COGeneral Contractor2507/08/2026
ORBIT PLBG & HTG INCPlumbing607/08/2026
ORBIT SPRINKLER CORPFire Protection307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor307/08/2026
POWER FULL ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MACIA INSPECTION & TESTIN4021609/03/2026
JSPECS,INC9429708/28/2026
STRUCT. ENGINEERING INTEG4174106/12/2024
TECTONIC ENGINEERING CONS106305/05/2023
Building Lifecycle
All (175)Filed (30)Permit Issued (33)Signed Off (7)Violation (9)Inspection (12)Objection (54)Special Inspection (30)
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/22/2026
Objection resolved — Resolved
09/14/2026
Objection raised — Scope
09/14/2026
Objection raised — Other
09/14/2026
Objection raised — Zoning
09/14/2026
Objection raised — Other
09/03/2026
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH ALTERATION #B00588008. INSTALLATION OF CENTRAL AIR SOURCE HEAT PUMP UNITS FOR HEATING AND COOLING AND ENERGY RECOVERY VENTILATOR FOR VENTILATION AIR.
B00658510-P1
08/28/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION B00588008. NEW PLUMBING FIXTURES AND PIPING THROUGHOUT 3-STORY, ONE FAMILY DWELLING.
B00658225-P8
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
08/28/2026
Special inspection requirement — Mechanical Systems
Jeffrey Stones
08/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
08/28/2026
Special inspection requirement — Shutoff dampers
Jeffrey Stones
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
08/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
08/28/2026
Special inspection requirement — Final
Jeffrey Stones
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
08/28/2026
Special inspection requirement — Maintenance information
Jeffrey Stones
08/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
08/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
07/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
07/06/2026
Signed off — Alteration
PROVIDE AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THREE STORY, ONE FAMILY DWELLING IN CONJUNCTION WITH ALTERATION/CO #B00588008.
B00663167-I1
07/01/2026
Signed off — Alteration
SOUTH SIDE TIMBER SHORING FOR NEW WALL CONSTRUCTION AND UNDERPINNING OF EXISTING CONCRETE WALL, NORTH SIDE UNDERPINNING OF EXISTING CONCRETE WALL, EAST SIDE UNDERPINNING OF EXISTING CONCRETE WALL.
B00783002-I1
06/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
06/29/2026
Special inspection requirement — Fenestration areas
Jeffrey Stones
06/29/2026
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
06/29/2026
Special inspection requirement — Insulation placement and R values
Jeffrey Stones
06/29/2026
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
06/29/2026
Special inspection requirement — Fenestration air leakage
Jeffrey Stones
06/29/2026
Special inspection requirement — Masonry
Jeffrey Stones
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
06/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Stones
06/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Stones
06/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
06/15/2026
Objection resolved — Addressed
06/11/2026
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION B00588008.
B00716748-I1
05/22/2026
Signed off — Alteration
B00646864-I1
05/21/2026
Objection raised — Scope
05/07/2026
Filed — Alteration CO
RENOVATION THROUGHOUT EXISTING 3-STORY, 1-FAMILY DWELLING. ENLARGEMENT AT REAR OF THIRD FLOOR AND NEW BULKHEAD.
B00588008-A1
05/06/2026
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
05/06/2026
Special inspection requirement — Insulation placement and R values
Jeffrey Stones
05/06/2026
Special inspection requirement — Air barrier - visual inspection
Jeffrey Stones
05/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Stones
05/06/2026
Special inspection requirement — Fenestration areas
Jeffrey Stones
05/06/2026
Special inspection requirement — Fenestration air leakage
Jeffrey Stones
05/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Permit issued — Mechanical Systems
B00658510-I1-MS
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/24/2026
Filed — Alteration CO
RENOVATION THROUGHOUT EXISTING 3-STORY, 1-FAMILY DWELLING. ENLARGEMENT AT REAR OF THIRD FLOOR AND NEW BULKHEAD.
B00588008-P9
03/24/2026
Objection raised — Other
03/24/2026
Objection resolved — Addressed
03/16/2026
Permit issued — General Construction
B00588008-I1-GC
03/10/2026
Permit issued — Construction Fence
B00716748-I1-FN
02/25/2026
Filed — Alteration
B00646864-P4
02/25/2026
Filed — Alteration
PROVIDE AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THREE STORY, ONE FAMILY DWELLING IN CONJUNCTION WITH ALTERATION/CO #B00588008.
B00663167-P2
02/18/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION B00588008. NEW PLUMBING FIXTURES AND PIPING THROUGHOUT 3-STORY, ONE FAMILY DWELLING.
B00658225-P7
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedDYNAMIC RECONSTRUCTION CO04/21/2026
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC RECONSTRUCTION CO03/16/2026
DOB NOWConstruction FenceSigned-offDYNAMIC RECONSTRUCTION CO03/10/2026
DOB NOWPlumbingSigned-offORBIT SPRINKLER CORP01/14/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC01/14/2026
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/14/2026
DOB NOWSupport of ExcavationSigned-offDYNAMIC RECONSTRUCTION CO08/28/2025
DOB NOWGeneral ConstructionSigned-offDYNAMIC RECONSTRUCTION CO08/28/2025
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC RECONSTRUCTION CO03/20/2025
DOB NOWConstruction FenceSigned-offDYNAMIC RECONSTRUCTION CO03/12/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/27/2025
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC01/27/2025
DOB NOWPlumbingSigned-offORBIT SPRINKLER CORP01/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offJ & G CONSTRUCTION SVCS11/12/2024
DOB NOWSupport of ExcavationSigned-offDYNAMIC RECONSTRUCTION CO09/24/2024
DOB NOWFoundationSigned-offDYNAMIC RECONSTRUCTION CO09/24/2024
DOB NOWConstruction FenceSigned-offDYNAMIC RECONSTRUCTION CO05/02/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/28/2024
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC RECONSTRUCTION CO03/25/2024
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC02/05/2024
DOB NOWSupport of ExcavationSigned-offDYNAMIC RECONSTRUCTION CO09/22/2023
DOB NOWFoundationSigned-offDYNAMIC RECONSTRUCTION CO09/22/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/23/2023
DOB NOWPlumbingSigned-offORBIT SPRINKLER CORP06/23/2023
DOB NOWConstruction FenceSigned-offDYNAMIC RECONSTRUCTION CO04/21/2023
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC RECONSTRUCTION CO04/12/2023
DOB NOWSupport of ExcavationSigned-offDYNAMIC RECONSTRUCTION CO10/13/2022
DOB NOWStructuralSigned-offDYNAMIC RECONSTRUCTION CO09/30/2022
DOB NOWSupport of ExcavationSigned-offDYNAMIC RECONSTRUCTION CO09/24/2022
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC07/21/2022
DOB NOWConstruction FenceSigned-offDYNAMIC RECONSTRUCTION CO04/18/2022
DOB NOWGeneral ConstructionPermit IssuedDYNAMIC RECONSTRUCTION CO04/15/2022
DOB NOWGeneral ConstructionSigned-offDYNAMIC RECONSTRUCTION CO11/15/2021
BISOTISSUEDORIENTAL CONSTRUCTION LLC05/17/2007
BISOTISSUEDORIENTAL CONSTRUCTION LLC11/17/2006
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD CO I11/23/2005
BISPLISSUEDS & L PLUMBING INC10/05/2005
1 project · most recent 09/03/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/03/2026Permit IssuedDYNAMIC RECONSTRUCTION COAir Conditioning Systems, Ventilation Systems
Cooling
Lg ARNU123NJA4 12,000 BTU · Vrf Indoor ×6
ARNU073L1G4 7,500 BTU · Vrf Indoor ×4
ARNU073M1A4 7,500 BTU · Vrf Indoor ×4
ARNU073CEU4 7,500 BTU · Vrf Indoor ×2
ARNU093CEU4 9,600 BTU · Vrf Indoor ×1
ARNU093TUD4 9,600 BTU · Vrf Indoor ×2
ARNU303NJA4 3,000 BTU · Vrf Indoor ×1
ARUB060GSS4 60,000 BTU · Vrf Outdoor ×2
ARUM048GSS5 48,000 BTU · Vrf Outdoor ×1
ARNU123CEU4 12,300 BTU · Vrf Indoor ×1
ARNU363NJA4 36,000 BTU · Vrf Indoor ×1
Ventilation
Zehnder Q600 271 CFM · Erv ×4
Greenheck CUE-121VG 800 CFM · Kitchen Exhaust ×2
1 project · most recent 08/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/28/2026Permit IssuedORBIT PLBG & HTG INCGas, Storm, Water/Sanitary
3 projects · most recent 05/26/2026
General Wiring
FiledStatusContractorScope
05/26/2026CompletePOWER FULL ELECTRIC, INCGeneral Wiring
03/28/2024CompleteRICHARD NEU—
05/27/2022CompletePOWER FULL ELECTRIC, INC—
1 project · most recent 05/31/2022
Fence
FiledStatusContractorScope
05/31/2022Signed-offDYNAMIC RECONSTRUCTION COFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/12/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/28/2026Shutoff dampersJeffrey Stonesenergy_progress
08/28/2026Maintenance informationJeffrey Stonesenergy_progress
08/28/2026HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
08/28/2026HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
08/28/2026FinalJeffrey Stonesprogress
08/28/2026Energy Code Compliance InspectionsJeffrey Stonesprogress
08/28/2026HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
08/28/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/28/2026Mechanical SystemsJeffrey Stonesspecial
08/28/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
08/28/2026HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
07/28/2026HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
06/29/2026Lighting in dwelling unitsJeffrey Stonesenergy_progress
06/29/2026Insulation placement and R valuesJeffrey Stonesenergy_progress
06/29/2026Air barrier - visual inspectionJeffrey Stonesenergy_progress
06/29/2026Fenestration areasJeffrey Stonesenergy_progress
06/29/2026Fenestration air leakageJeffrey Stonesenergy_progress
06/29/2026Fire-Resistance Rated ConstructionJeffrey Stonesprogress
06/29/2026Energy Code Compliance InspectionsJeffrey Stonesprogress
06/29/2026Structural Stability – Alterations of existing buildingsJeffrey Stonesspecial
06/29/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
06/29/2026MasonryJeffrey Stonesspecial
06/29/2026Fenestration and door U-factor and product ratingsJeffrey Stonesenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsJeffrey Stonesenergy_progress
Latest 25 of 150.
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
09/01/2026B00606757-I1Request digital key ↗
08/31/2026B00658225-P8Request digital key ↗
08/31/2026B00658510-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits26
▸DOB NOWLPC Approval/Permit25
08/31/2026B00658225-P8Open ↗
08/31/2026B00658510-I1Open ↗
08/31/2026B00658510-P1Open ↗
Showing 3 of 25 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
04/06/2021302041948Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWZD1: DOB Zoning Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Seals & Professional Certifications196
▸DOB NOWProgress Inspector Seal & Signature82
09/23/2026B00658510-P1Open ↗
09/23/2026B00658510-P1Open ↗
09/23/2026B00658225-P8Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature81
09/23/2026B00658225-P8Open ↗
09/23/2026B00658510-P1Open ↗
09/23/2026B00658510-P1Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
09/21/2026B00658510-P1Open ↗
09/01/2026B00606757-I1Open ↗
08/31/2026B00658225-P8Open ↗
Showing 3 of 33 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/18/2026B00658225-I1Open ↗
Showing 1 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY2
04/05/2021302041948Open ↗
03/18/2021302041948Open ↗
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/05/2021302041948Open ↗
▸Other Documents30
▸DOB NOWSite Survey: Initial7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWPlot Diagram7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type