💬 Discuss this project
1938Year Built
4Stories
C7Building Class
R6Zoning
132,412 sfGross Floor Area
189Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Williamsburg Pact · 89,600 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofWilliamsburg Houses41p · 2 filings · 20 docs
BulkheadWilliamsburg Pact LLC1p · 1 filing · 11 docs
Floor 4Williamsburg Pact LLC41p · 3 filings · 20 docs
Floor 3Williamsburg Pact LLC41p · 3 filings · 20 docs
Floor 2Williamsburg Pact LLC41p · 3 filings · 20 docs
Floor 1Williamsburg Pact LLC40p · 3 filings · 20 docs
CellarWilliamsburg Pact LLC30p · 4 filings · 20 docs
BasementWilliamsburg Pact LLC1p · 1 filing · 11 docs
Sub-BasementWilliamsburg Pact LLC19p · 1 filing · 11 docs
Site & exteriorWilliamsburg Pact LLC25p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Williamsburgh Pact4307/08/2026
New York City Housing Authority1403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering101/30/2026
Dibari Engineering701/04/2024
Newman Design Architects308/21/2023
Joel Phagoo P.E109/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Charis Consulting1203/21/2026
William Vitacco Associates803/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold407/08/2026
MDG Design & ConstructionGeneral Contractor407/08/2026
Delco ElectricalElectrical303/22/2026
Tradeline PlumbingPlumbing207/08/2026
KTB ElectricElectrical203/22/2026
Zone Plumbing & HeatingPlumbing107/08/2026
Lina ElectricElectrical103/21/2026
SNS OrgnizationGeneral Contractor107/08/2026
Woodside ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bazini Engineering1808101/30/2026
Lorjan Agalliu Architect6104401/04/2024
Building Lifecycle
All (134)Filed (12)Permit Issued (13)Signed Off (9)Violation (60)Inspection (6)Objection (18)Special Inspection (16)
03/18/2026
Violation issued (FDNY_NOV, closed)
03/10/2026
Signed off — Alteration
B01311753-I1
03/05/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/03/2026
Permit issued — Boiler Equipment
B01311753-I1-BE
01/30/2026
Filed — Alteration
B01311753-I1
10/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
05/16/2025
Violation issued (HPD, closed)
C
02/07/2025
Violation issued (HPD, closed)
I
01/30/2025
Violation issued (HPD, closed)
B
01/30/2025
Violation issued (HPD, closed)
C
01/30/2025
Violation issued (HPD, closed)
B
10/21/2024
Signed off — Alteration
Building 7 trash enclosure - To erect trash enclosure as shown on plans filed herewith. No change in use, egress or occupancy.
B00890183-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2024
Signed off — Alteration
Various landscaping/site work filed for block 2 building cluster. All work to take place within the property line. No change in use, egress or occupancy.
B00890210-I1
06/26/2024
Violation issued (HPD, closed)
B
06/26/2024
Violation issued (HPD, closed)
B
06/26/2024
Violation issued (HPD, closed)
A
05/14/2024
Signed off — Alteration
Additions / modifications to existing HVAC system and related piping. No change in use, egress or occupancy. Related applications filed under GC# B00491912 & PL#B00492416.
B00492429-I1
04/08/2024
Violation issued (HPD, closed)
C
04/08/2024
Violation issued (HPD, closed)
C
04/02/2024
Signed off — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No work to exterior or facade filed under this application. No change in use, egress or occupancy.
B00479222-I1
04/01/2024
Violation issued (HPD, closed)
C
03/18/2024
Violation issued (HPD, closed)
A
03/18/2024
Violation issued (HPD, closed)
B
02/15/2024
Signed off — Alteration
B08000346-I1
01/23/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/18/2024
Special inspection requirement — Heating Systems
lorjan agalliu
01/08/2024
Objection raised — Scope
01/08/2024
Objection resolved — Addressed
01/04/2024
Filed — Alteration
Replacement of boilers & associated ducts/piping as shown on drawings. No work to exterior or facade filed under this application. No change in use, egress or occupancy.
B00479222-P1
12/26/2023
Special inspection requirement — Heating Systems
lorjan agalliu
11/13/2023
Permit issued — Boiler Equipment
B00479222-I1-BE
10/11/2023
Permit issued — General Construction
B00890210-I1-GC-CX
09/25/2023
Signed off — Alteration
Additions & modifications to existing plumbing system and related piping. Filed in conjunction with GC # B00491912-I1 & MS #B00492429-I2. No change in use, egress or occupancy.
B00492416-I1
09/22/2023
Signed off — Alteration
All plumbing work in tank room of boiler room associated plumbing piping (Domestic Hot & Cold Valves) install (3) new Turbo Max, (2) HWCP (Hot Water Circulating Pumps), Mixing Valves ( TMV1 & TMV2) & Water submeter. No change in use, egress / occupancy.
B00700199-I1
09/20/2023
Signed off — Alteration
Interior renovation of partitions, ceilings and doors ; stair repair; repair to facade and window replacement. Filed in conjunction with MS #B00492429-I1 & PL #B00492416-I1. No change in use, egress or occupancy.
B00491912-I1
09/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2023
Filed — Alteration
Various landscaping/site work filed for block 2 building cluster. All work to take place within the property line. No change in use, egress or occupancy.
B00890210-I1
08/21/2023
Filed — Alteration
Additions & modifications to existing plumbing system and related piping. Filed in conjunction with GC # B00491912-I1 & MS #B00492429-I2. No change in use, egress or occupancy.
B00492416-P2
07/31/2023
Permit issued — General Construction
B00890183-I1-GC
07/21/2023
Filed — Alteration
Building 7 trash enclosure - To erect trash enclosure as shown on plans filed herewith. No change in use, egress or occupancy.
B00890183-I1
06/14/2023
Special inspection requirement — Final
Brian Newman
05/25/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2023
Permit issued — Plumbing
B00700199-I1-PL
05/01/2023
Permit issued — Mechanical Systems
B00492429-I1-MS
04/28/2023
Violation issued (HPD, closed)
A
Latest 60 of 134 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz02/03/2026
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz11/13/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction10/11/2023
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction07/31/2023
DOB NOWPlumbingSigned-offTradeline Plumbing05/10/2023
DOB NOWMechanical SystemsSigned-offSNS Orgnization05/01/2023
DOB NOWPlumbingSigned-offZone Plumbing & Heating04/27/2023
DOB NOWSidewalk ShedSigned-offYarks NYC02/15/2023
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz12/13/2022
DOB NOWSidewalk ShedSigned-offYarks NYC09/17/2022
DOB NOWGeneral ConstructionSigned-offMDG Design & Construction09/16/2022
DOB NOWPlumbingSigned-offTradeline Plumbing05/19/2022
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz04/28/2022
BISPLISSUEDRaytone Plumbing Spec03/02/2006
BISFBISSUEDDouglas Simmons10/21/2005
BISBLISSUEDDouglas Simmons02/15/2005
BISPLISSUEDNY Plumbing & Sprinkler02/15/2005
BISSPISSUEDV. C. Vitanza Sons04/16/2003
BISSPISSUEDV. C. Vitanza Sons04/16/2003
BISPLISSUEDDynamic Contracting10/31/2002
BISFBISSUEDMaric Plumbing & Heating05/03/2002
BISBLISSUEDDouglas Simmons05/04/1999
BISPLISSUEDNY Plumbing & Sprinkler04/20/1999
BISFBISSUEDB.G. National Plumbing & Heating02/22/1995
BISPLISSUEDB.G. National Plumbing & Heating02/22/1995
BISFSISSUEDAlps Mechanical09/12/1994
6 projects · most recent 07/18/2025
General Wiring
FiledStatusContractorScope
07/18/2025CompleteKTB ElectricGeneral Wiring
07/16/2025CompleteDelco ElectricalGeneral Wiring
07/16/2025CompleteDelco ElectricalGeneral Wiring
07/16/2025CompleteDelco ElectricalGeneral Wiring
05/01/2023CompleteDelco ElectricalGeneral Wiring
10/09/2020CompleteJemco Electric Contractors—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/05/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/25/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
10/31/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
01/18/2024Heating Systemslorjan agalliuspecial
12/26/2023Heating Systemslorjan agalliuspecial
06/14/2023FinalBrian Newmanprogress
11/01/2021Lighting in dwelling unitslorjan agalliuenergy_progress
11/01/2021Exterior lighting powerlorjan agalliuenergy_progress
11/01/2021Fenestration and door U-factor and product ratingslorjan agalliuenergy_progress
11/01/2021Interior lighting powerlorjan agalliuenergy_progress
11/01/2021Energy Code Compliance Inspectionslorjan agalliuprogress
11/01/2021Lighting controlslorjan agalliuenergy_progress
10/14/2021Masonrylorjan agalliuspecial
10/06/2021Fire-Resistant Penetrations and Jointslorjan agalliuspecial
10/06/2021Heating Systemslorjan agalliuspecial
03/24/2021Finallorjan agalliuprogress
03/24/2021Finallorjan agalliuprogress
03/24/2021Mechanical Systemslorjan agalliuspecial
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/31/2026B00492416-P1Request digital key ↗
08/31/2026B00492416-I1Request digital key ↗
08/31/2026B00492416-P2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit9
08/31/2026B00492429-I1Open ↗
08/31/2026B00491912-I1Open ↗
08/29/2026B00700199-I1Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/31/2026B00492416-I1Open ↗
08/31/2026B00492416-P1Open ↗
08/31/2026B00492416-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026B00479222-I1Open ↗
08/28/2026B01311753-I1Open ↗
08/27/2026B00479222-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/26/2026B00890183-I1Open ↗
08/26/2026B00492429-I1Open ↗
08/22/2026B00491912-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00700199-I1Open ↗
08/15/2026B00479222-I1Open ↗
08/15/2026B00479222-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/31/2026B00492416-I1Open ↗
08/31/2026B00492429-I1Open ↗
08/31/2026B00491912-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00479222-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00491912-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/31/2026B00492416-I1Open ↗
08/31/2026B00492416-P1Open ↗
08/31/2026B00492416-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/31/2026B00492416-I1Open ↗
08/31/2026B00492429-I1Open ↗
08/31/2026B00491912-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/26/2020301494602Open ↗
10/23/2020301494611Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/29/2026B00700199-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/29/2026B00700199-I1Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
01/26/2021300346178Open ↗