← Back
Elevator apt, fireproof without stores
123 WAVERLY PLACE
MANHATTAN · BIN 1008951
💬 Discuss this project
1917Year Built
9Stories
D3Building Class
R6Zoning
37,939 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator apt, fireproof without stores · Owner of record: DARLINGTON ESTATES INC · 6,427 sf lot · 5.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
XINOS CONSTRUCTION507/08/2026
DARLINGTON ESTATE INC5007/08/2026
STONE REALTY MANAGEMENT103/22/2026
PHOENIX 132 SUTTON ST103/21/2026
C O STONE REALTY MANAGEMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.407/10/2025
NY RESTORATION TECHNOLOGY CORP108/02/2019
SCALAR ARCHITECTURE PC111/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP803/21/2026
AE DESIGN SOLUTION203/21/2026
XINOS CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor407/08/2026
XINOS CONSTRUCTION CORPGeneral Contractor207/08/2026
COYNE, JOHNElectrical103/21/2026
DE LA GUARDA, WILKINElectrical103/21/2026
EAST COAST MECHNACIAL LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947407/10/2025
Building Lifecycle
All (110)Filed (6)Permit Issued (7)Signed Off (4)Facade (FISP) (16)Violation (60)Inspection (2)Special Inspection (15)
08/20/2026
Signed off — Alteration
REPLACE BOILER AND BURNER WITH NEW DUAL FUEL BOILER/BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. NEW GAS LINE FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114098-I1
07/27/2026
Signed off — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. NEW DUAL FUEL BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114158-I1
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
A
03/12/2026
Violation issued (HPD, closed)
B
03/12/2026
Violation issued (HPD, closed)
A
02/17/2026
Signed off — Alteration
M00204019-I1
12/02/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/05/2025
Violation issued (HPD, open)
B
09/05/2025
Violation issued (HPD, open)
C
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
07/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/11/2025
Special inspection requirement — Heating Systems
Gregory Perotto
07/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
07/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
07/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
07/10/2025
Filed — Alteration
REPLACE BOILER AND BURNER WITH NEW DUAL FUEL BOILER/BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. NEW GAS LINE FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114098-P1
07/10/2025
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. NEW DUAL FUEL BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114158-P1
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
07/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/08/2025
Special inspection requirement — Heating Systems
Gregory Perotto
07/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Gregory Perotto
07/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Gregory Perotto
07/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Gregory Perotto
06/04/2025
Permit issued — Boiler Equipment
M01114098-I1-BE
06/03/2025
Permit issued — Plumbing
M01114158-I1-PL
09/25/2024
Filed — Alteration
REPLACE BOILER AND BURNER WITH NEW DUAL FUEL BOILER/BURNER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. NEW GAS LINE FILED UNDER SEPARATE PL APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114098-I1
09/24/2024
Filed — Alteration
INSTALL NEW GAS LINE AND METER AND CONNECT TO NEW DUAL FUEL BURNER. NEW DUAL FUEL BURNER FILED UNDER SEPARATE BE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01114158-I1
10/02/2023
Cycle 9 facade report signed — SAFE
08/17/2023
Cycle 9 facade report submitted
07/26/2023
Cycle 9 facade inspection completed
07/14/2021
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00098613-I1
03/30/2020
Permit issued — Sidewalk Shed
M00098613-I1-SH
03/02/2020
Cycle 8 facade report submitted
02/20/2020
Cycle 8 facade report signed — SAFE
02/14/2020
Permit issued — Sidewalk Shed
M00204019-I1-SH
01/29/2020
Cycle 8 facade inspection completed
11/06/2019
Permit issued — Sidewalk Shed
M00098613-I1-SH
08/02/2019
Filed — Alteration
M00204019-I1
08/02/2019
Permit issued — Sidewalk Shed
M00204019-I1-SH
08/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2018
Cycle 8 facade report submitted
12/14/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/21/2018
Violation issued (HPD, closed)
C
11/20/2018
Cycle 8 facade report signed — UNSAFE
11/16/2018
Violation issued (ECB, closed)
Construction
11/13/2018
Permit issued — Sidewalk Shed
M00098613-I1-SH
11/12/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00098613-I1
11/12/2018
Special inspection requirement — Final
JULIO SALCEDO-FERNANDEZ
10/30/2018
Violation issued (HPD, closed)
C
10/30/2018
Violation issued (HPD, closed)
C
10/24/2018
Cycle 8 facade inspection completed
10/05/2018
Violation issued (HPD, closed)
C
09/19/2018
Violation issued (HPD, closed)
C
07/05/2018
Violation issued (HPD, closed)
C
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offEAST COAST PETROLEUM INC06/04/2025
DOB NOWPlumbingSigned-offEAST COAST MECHNACIAL LLC06/03/2025
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC03/30/2020
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP02/14/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/06/2019
DOB NOWSidewalk ShedSigned-offXINOS CONSTRUCTION CORP08/02/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC11/13/2018
BISOTISSUEDXINOS CONSTRUCTION CORP03/20/2020
BISOTISSUEDXINOS CONSTRUCTION CORP07/26/2019
BISPLISSUEDJ.E.S. PLBG & HTG CORP07/24/2018
BISOTISSUEDJONICO CONSTRUCTION LLC07/24/2018
BISEQISSUEDPHEONIX 132 SUTTON STREET12/21/2009
BISEQISSUEDSTEEL INSUSTRIES, INC12/03/2009
BISOTISSUEDNEW LIFE MASON & WATER10/15/2009
BISEQISSUEDSTEEL INSUSTRIES, INC05/01/2009
BISEQISSUEDPHEONIX 132 SUTTON STREET12/23/2008
BISEQISSUEDNEW LIFE MASON & WATER12/10/2008
BISOTISSUEDNEW LIFE MASON & WATER11/24/2008
BISEQISSUEDPHOENIX 132 SUTTON ST INC05/21/2008
BISEQISSUEDPHONIEX 132 SUTTON STREET01/22/2007
BISEQISSUEDBRIDGEWORKS INC07/13/1994
1 project · most recent 07/10/2025
Gas
FiledStatusContractorScope
07/10/2025Signed-offEAST COAST MECHNACIAL LLCGas
4 projects · most recent 09/23/2024
Boiler Controls General Wiring
FiledStatusContractorScope
09/23/2024Permit IssuedJAY UNITED ELECL CONTNG CBoiler Controls
08/02/2019Permit IssuedTOWER ELECTRIC INC.—
05/29/2019Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
11/12/2018CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/02/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/11/2025Tenant Protection Plan ComplianceGregory Perottospecial
07/11/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
07/11/2025Heating SystemsGregory Perottospecial
07/11/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
07/11/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
07/11/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
07/08/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
07/08/2025Tenant Protection Plan Compliance—special
07/08/2025Tenant Protection Plan Compliance—special
07/08/2025Fire-Resistant Penetrations and JointsGregory Perottospecial
07/08/2025Heating SystemsGregory Perottospecial
07/08/2025HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
07/08/2025HVAC-R and service water heating equipmentGregory Perottoenergy_progress
07/08/2025HVAC-R and service water heating system controlsGregory Perottoenergy_progress
11/12/2018FinalJULIO SALCEDO-FERNANDEZprogress
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/06/2026M00098613-I1Request digital key ↗
08/22/2026M01114098-I1Request digital key ↗
08/22/2026M01114098-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00204019-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION18
12/20/2022123804598Open ↗
12/10/2022123804598Open ↗
11/16/2022123804598Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION11
07/26/2019123804598Open ↗
07/24/2018123215886Open ↗
07/24/2018123215886Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications35
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
07/26/2019123804598Open ↗
03/11/2019123215886Open ↗
05/24/2018123215886Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026M01114098-I1Open ↗
09/23/2026M01114098-I1Open ↗
09/23/2026M01114098-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00098613-I1Open ↗
09/05/2026M00204019-I1Open ↗
08/22/2026M01114098-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M01114098-I1Open ↗
09/23/2026M01114098-I1Open ↗
09/23/2026M01114098-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/24/2018123215886Open ↗
05/02/2009120026783Open ↗
12/10/2008110409807Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
05/02/2009120026783Open ↗
12/10/2008110409807Open ↗
05/21/2008110171572Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/24/2018123215886Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/05/2018123215886Open ↗
10/01/2018123215886Open ↗
09/25/2018123215886Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
05/23/2019123804598Open ↗
05/24/2018123215886Open ↗
▸BISSTREET TREE CHECKLIST1
05/24/2018123215886Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026M01114098-I1Open ↗
08/13/2026M01114158-P1Open ↗
08/13/2026M01114098-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
05/02/2009120026783Open ↗
12/10/2008110409807Open ↗
05/21/2008110171572Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/23/2019123804598Open ↗
05/24/2018123215886Open ↗
▸BISASBESTOS INSPECTION REPORT1
10/17/2008110359736Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/11/2019123215886Open ↗
05/24/2018123215886Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2019123215886Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/22/2026M01114098-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/16/2020123804598Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/24/2023123804598Open ↗
▸Approvals, Objections & Sign-offs15
▸BISLANDMARKS APPROVAL4
08/28/2019123804598Open ↗
03/11/2019123215886Open ↗
05/24/2018123215886Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/02/2009120026783Open ↗
12/10/2008110409807Open ↗
10/17/2008110359736Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/24/2023123804598Open ↗
05/23/2019123804598Open ↗
09/25/2018123215886Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/27/2023123804598Open ↗
03/11/2019123215886Open ↗
▸BISFINAL1
01/24/2023123804598Open ↗
▸BISLANDMARKS SIGNOFF1
01/25/2023123804598Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
05/23/2019123804598Open ↗
05/23/2019123804598Open ↗
03/11/2019123215886Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/24/2023123804598Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET6
05/23/2019123804598Open ↗
05/24/2018123215886Open ↗
05/02/2009120026783Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
08/23/2021123804598Open ↗
10/01/2018123215886Open ↗
09/25/2018123215886Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
08/21/2019123804598Open ↗
03/11/2019123215886Open ↗
10/05/2018123215886Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026M00204019-I1Open ↗