← Back
Extended stay / suite - apartment-like amenities
Hotel Gerard
123 WEST 44 STREET · Midtown-Times Square · BIN 1022629
💬 Discuss this project
1894Year Built
13Stories
HSBuilding Class
C6-5.5Zoning
115,355 sfGross Floor Area
115Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFE
Extended stay / suite - apartment-like amenities · Owner of record: METROPOLITIAN TIMES SQUARE ASSOCIATES LL C · 10,000 sf lot · 11.54 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 1 filing · 11 docs
Floor 17p · 2 filings · 5 docs
Cellar21p · 1 filing · 20 docs
Site & exterior2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FD HFZ WEST 44TH STREET10403/21/2026
SHK MANAGEMENT1003/22/2026
THURCON PROPERTIES903/21/2026
PANNA403/21/2026
R H MANAGEMENT203/21/2026
PRIME REALTY203/21/2026
CERTIFIED203/21/2026
ARSENAL BUILDING CONSULTANTS103/22/2026
CERTIFIED OF NEW YORK INC103/21/2026
125 W44 RESTAURANT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.108/19/2026
JACK GREEN ASSOCIATES705/14/2025
ZENITH HOME INSPECTIONS203/15/2024
SYED ENGINEERING, P.C.106/25/2019
360 ENGINEERING P.C.106/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDIENT CONSULTING1403/21/2026
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPIRE SCAFFOLDING & HOISTGeneral Contractor707/08/2026
DARIUSZ GRYGLEWSKIElectrical403/21/2026
ACTIVE SIGNSScaffold207/08/2026
CHAMPION COMBUSTION CORPGeneral Contractor203/21/2026
INTEGRATED HVAC SYS & SVCGeneral Contractor209/07/2026
AMERICAN POWER ELECT CONSElectrical103/22/2026
RICHARD NEUElectrical103/22/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
RELIABLE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808108/19/2026
JACK GREEN ASSOCIATES422502/10/2025
Building Lifecycle
All (146)Filed (12)Permit Issued (12)Signed Off (7)Facade (FISP) (15)Violation (60)Inspection (6)Objection (4)Special Inspection (30)
09/03/2026
Permit issued — General Construction
M01434357-I1-MS
09/03/2026
Permit issued — General Construction
M01434357-I1-GC
08/19/2026
Filed — Alteration
REMOVAL OF EXISTING ROOFTOP MECHANICAL EQUIPMENT AND FOOTING. INSTALLATION OF NEW STEEL DUNNAGE BETWEEN AIRSHAFT PARAPETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY/
M01434357-I1
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
07/21/2026
Special inspection requirement — Final
Joseph Bazini
07/21/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
02/10/2026
Signed off — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-I1
02/10/2026
Signed off — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-S1
02/10/2026
Signed off — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-S2
06/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, closed)
A
05/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
05/14/2025
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-P4
05/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/27/2025
Permit issued — Mechanical Systems
M01051290-S1-MS
03/26/2025
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-P3
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/24/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
02/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
02/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
02/14/2025
Special inspection requirement — Heating Systems
JACK GREEN
02/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
02/14/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JACK GREEN
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
02/10/2025
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-P2
12/18/2024
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-P1
12/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
12/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
12/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
12/12/2024
Special inspection requirement — Heating Systems
JACK GREEN
12/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
12/12/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
JACK GREEN
11/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/22/2024
Violation issued (HPD, closed)
I
11/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/18/2024
Permit issued — Plumbing
M01051290-S2-PL
07/17/2024
Permit issued — Boiler Equipment
M01051290-I1-BE
05/30/2024
Objection resolved — Addressed
05/30/2024
Objection resolved — Addressed
05/24/2024
Objection raised — Scope
05/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JACK GREEN
05/23/2024
Objection raised — Scope
05/20/2024
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-I1
05/20/2024
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-S1
05/20/2024
Filed — Alteration
INSTALLATION OF NEW DUAL FUEL BOILER IN CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01051290-S2
05/20/2024
Special inspection requirement — Shutoff dampers
JACK GREEN
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
05/20/2024
Special inspection requirement — Heating Systems
JACK GREEN
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
JACK GREEN
05/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
JACK GREEN
05/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
JACK GREEN
05/16/2024
Special inspection requirement — Final
JACK GREEN
05/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
JACK GREEN
04/30/2024
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - HUNT&FISH CLUB NYC. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01013424-I1
04/30/2024
Signed off — Alteration
M01013423-I1
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINTEGRATED HVAC SYS & SVC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedINTEGRATED HVAC SYS & SVC09/03/2026
DOB NOWMechanical SystemsSigned-offCHAMPION COMBUSTION CORP03/27/2025
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP11/18/2024
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP07/17/2024
DOB NOWSignSigned-offACTIVE SIGNS INC04/08/2024
DOB NOWSignSigned-offACTIVE SIGNS INC04/08/2024
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST05/12/2021
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST04/30/2020
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST04/30/2020
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST06/26/2019
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST06/25/2019
BISOTISSUEDAM&G WATERPROOFING LLC04/12/2021
BISEQISSUEDAM&G WATERPROOFING LLC08/21/2020
BISEQISSUEDAM&G WATERPROOFING LLC06/24/2020
BISOTISSUEDAM&G WATERPROOFING LLC04/09/2020
BISSPISSUEDCAPITOL FIRE SPRINKLER CO03/22/2017
BISSPISSUEDNYC PLUMBING & HEATING IN02/22/2017
BISPLISSUEDDONATO PLUMBING GROUP INC08/23/2016
BISSPISSUEDCAPITOL FIRE SPRINKLER CO03/17/2016
BISPLISSUEDDONATO PLUMBING GROUP INC03/10/2016
BISOTISSUEDCERTIFIED OF N.Y. INC02/04/2016
BISOTISSUEDCERTIFIED OF N.Y. INC02/04/2016
BISMHISSUEDCERTIFIED OF N.Y. INC02/04/2016
BISOTISSUEDCERTIFIED OF N.Y. INC01/25/2016
BISOTISSUEDCNY CONSTRUCTION MANAGEME11/19/2015
BISFPISSUEDNY FIRE LLC07/21/2014
BISEQISSUEDTRI BOROUGH SCAFFOLDING06/09/2014
BISSPISSUEDQMB PLUMBING & HTG INC06/06/2014
BISPLISSUEDQMB PLUMBING & HEATING INC05/02/2014
BISOTISSUEDIHOME IMPROVEMENT & WINDO04/22/2014
BISOTISSUEDT.J. SIGNS UNLIMITED INC02/10/2014
BIS—ISSUEDAMERICAN SIGN & ELECL CON11/26/2013
BISSPISSUEDNYC PLUMBING & HEATING IN10/04/2013
BISOTISSUEDCNY CONSTRUCTION MANAGEME10/04/2013
BISPLISSUEDNYC PLUMBING & HEATING IN10/04/2013
BISOTISSUEDCNY CONSTRUCTION MANAGEME08/02/2013
BISOTISSUEDCNY CONSTRUCTION MANAGEME08/02/2013
BISEQISSUEDCNY CONSTRUCTION MANAGEME03/14/2013
BIS—ISSUEDCNY CONSTRUCTION MANAGEME02/25/2013
+ 22 more permits on file
1 project · most recent 08/19/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedINTEGRATED HVAC SYS & SVCVentilation Systems
Ventilation
Captiveaire CAS-HVAC3-E.902-24-15T-DOAS 15 tons · Doas ×1
6 projects · most recent 11/25/2025
General Wiring Boiler Controls
FiledStatusContractorScope
11/25/2025CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
09/15/2025CompleteFSM ELECTRICAL CORPORATIOGeneral Wiring
03/07/2025CompleteRICHARD NEU—
08/27/2024CompleteSHELBY ELECTRICAL CORP—
08/25/2024CompleteECLIPSE ELECTRIC CORPBoiler Controls
03/27/2023CompleteAMERICAN POWER ELECT CONSGeneral Wiring
1 project · most recent 08/19/2026
Steel Masonry
FiledStatusContractorScope
08/19/2026Permit IssuedINTEGRATED HVAC SYS & SVCSteel, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/19/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
07/27/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
07/21/2026FinalJoseph Baziniprogress
07/21/2026Mechanical SystemsJoseph Bazinispecial
05/27/2025Tenant Protection Plan ComplianceJACK GREENspecial
05/09/2025Tenant Protection Plan Compliance—special
03/26/2025Tenant Protection Plan Compliance—special
02/14/2025Tenant Protection Plan ComplianceJACK GREENspecial
02/14/2025HVAC-R and service water heating equipmentJACK GREENenergy_progress
02/14/2025HVAC-R and service water heating system controlsJACK GREENenergy_progress
02/14/2025Heating SystemsJACK GREENspecial
02/14/2025HVAC-R and service water piping design and insulationJACK GREENenergy_progress
02/14/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsJACK GREENspecial
02/14/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
12/12/2024Tenant Protection Plan Compliance—special
12/12/2024HVAC-R and service water heating equipmentJACK GREENenergy_progress
12/12/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
12/12/2024HVAC-R and service water heating system controlsJACK GREENenergy_progress
12/12/2024Heating SystemsJACK GREENspecial
12/12/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
12/12/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsJACK GREENspecial
05/24/2024HVAC-R and service water piping design and insulationJACK GREENenergy_progress
05/20/2024Shutoff dampersJACK GREENenergy_progress
05/20/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
05/20/2024Heating SystemsJACK GREENspecial
Latest 25 of 34.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Hunt & FishRestaurant / Food Service—
Project M01013423 Alteration · LOC Issued · 03/15/2024
Project M01013424 Alteration · LOC Issued · 03/15/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 698 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch11
08/27/2026M01013423-I1Request digital key ↗
08/27/2026M01013424-I1Request digital key ↗
08/27/2026M01051290-P4Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00168060-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00168058-I1Request digital key ↗
▸Applications & Permits160
▸BISPLAN / WORK APPROVAL APPLICATION87
03/02/2026120932465Open ↗
07/03/2025121916935Open ↗
06/30/2025121916935Open ↗
Showing 3 of 87 on file for this type
▸BISWORK PERMIT APPLICATION55
06/24/2020140916668Open ↗
08/23/2019140863796Open ↗
08/22/2019140863796Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWLPC Approval/Permit12
09/25/2026M01434357-S1Open ↗
08/20/2026M01434357-I1Open ↗
08/20/2026M01434357-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLACE OF ASSEMBLY2
09/02/2016122029072Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications153
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION69
07/12/2019123527861Open ↗
01/11/2019123527861Open ↗
05/15/2017122615517Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026M01434357-I1Open ↗
09/23/2026M01434357-I1Open ↗
09/01/2026M01051290-S1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026M01434357-I1Open ↗
09/20/2026M01051290-S2Open ↗
09/01/2026M01051290-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/25/2026M01434357-S1Open ↗
09/05/2026M00168060-I1Open ↗
08/27/2026M01013423-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
Showing 2 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment33
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
04/04/2017121607350Open ↗
12/27/2016122615517Open ↗
12/15/2016122615517Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
10/24/2016122021837Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/13/2025121916935Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
10/14/2025121916935Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES3
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
01/11/2019123527861Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos41
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
01/11/2019123527861Open ↗
Showing 1 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/25/2026M01434357-S1Open ↗
08/27/2026M01013423-I1Open ↗
08/27/2026M01051290-P4Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/11/2019123527861Open ↗
04/03/2017121584972Open ↗
04/03/2017121584972Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/27/2021123527861Open ↗
04/03/2017121584972Open ↗
12/08/2016122611487Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/13/2025121916935Open ↗
10/13/2025121916935Open ↗
05/27/2021123527861Open ↗
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026M01051290-I1Open ↗
08/13/2026M01051290-S1Open ↗
08/13/2026M01051290-S2Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/13/2025121916935Open ↗
03/30/2022121817980Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
10/13/2025121916935Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/13/2025121916935Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/13/2025121916935Open ↗
▸BISLIGHTING CONTROLS1
10/13/2025121916935Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY15
10/13/2025121916935Open ↗
10/29/2024120932465Open ↗
12/20/2022121835201Open ↗
Showing 3 of 15 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
05/02/2022140863796Open ↗
▸BISMECHANICAL SYSTEMS1
10/13/2025121916935Open ↗
▸Approvals, Objections & Sign-offs112
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST53
10/14/2025121916935Open ↗
12/21/2022121835201Open ↗
05/05/2022140863796Open ↗
Showing 3 of 53 on file for this type
▸BISLANDMARKS APPROVAL21
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
03/20/2019123527861Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
03/02/2026120932465Open ↗
10/29/2024120932465Open ↗
03/09/2021120932465Open ↗
Showing 3 of 11 on file for this type
▸BISLANDMARKS SIGNOFF3
09/06/2022121835201Open ↗
04/01/2022121817980Open ↗
08/18/2021122026681Open ↗
▸BISFINAL3
05/02/2022140863796Open ↗
02/08/2022140208415Open ↗
01/24/2022140916668Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
12/20/2016121607350Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT37
05/27/2021123527861Open ↗
01/11/2019123527861Open ↗
04/03/2017121584972Open ↗
Showing 3 of 37 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
10/13/2025121916935Open ↗
08/26/2022121835201Open ↗
03/30/2022121817980Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms81
▸BISADDITIONAL INFORMATION35
09/11/2025121916935Open ↗
09/11/2025121916935Open ↗
07/25/2025121916935Open ↗
Showing 3 of 35 on file for this type
▸BISEFILING COVER SHEET29
01/11/2019123527861Open ↗
04/03/2017121584972Open ↗
Showing 2 of 29 on file for this type
▸BISBOROUGH INTAKE FORM14
04/20/2020120932465Open ↗
01/15/2020120932465Open ↗
10/23/2019120932465Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/23/2020140916668Open ↗
08/22/2019140863796Open ↗
Showing 2 of 3 on file for this type
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
10/14/2025121916935Open ↗
07/25/2025121916935Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type