← Back
Elevator cooperative
123 WEST 74 STREET
MANHATTAN · Upper West Side (Central) · BIN 1030062
💬 Discuss this project
1925Year Built
9Stories
D4Building Class
R8BZoning
54,105 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized14 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 123 APARTMENTS CORP · 8,176 sf lot · 6.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 2 filings · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROTO RESTORATION CONSTRUCTION1107/08/2026
SIREN MANAGEMENT CORP.703/22/2026
123 APARTMENT CORP1303/22/2026
123 WEST 74TH STREET103/22/2026
121 APARTMENTS CORP.,103/22/2026
123 W. 74 LLC203/22/2026
C O SIREN MANAGEMENT403/21/2026
C O 123 APARTMENTS603/21/2026
123 OWNERS203/21/2026
123 WEST 74103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
SYNERGY BUILDING CONSULTANTS403/21/2026
AE DESIGN SOLUTION803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROTO RESTORATION CONSTRUCTIONGeneral Contractor807/08/2026
L & Z RESTORATION CORPGeneral Contractor304/09/2026
THE METRO GROUP PLBG LLCPlumbing206/28/2026
THE METRO GROUP, INCGeneral Contractor104/09/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
LEONARD KRITZElectrical103/21/2026
JOSEPH ALOIAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC77461102/27/2026
CHEN ENGINEERING SERVICES1826108/22/2025
KZ ENGINEERING, P.C.4665208/04/2025
METRIC CONSULTING AND INS1803306/25/2024
CATALPA SPECIAL INSPECTIO2004206/04/2024
Building Lifecycle
All (150)Filed (23)Permit Issued (15)Signed Off (8)Facade (FISP) (15)Violation (49)Inspection (6)Objection (4)Special Inspection (30)
03/31/2026
Permit issued — Boiler Equipment
M01222163-S3-BE
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/02/2026
Special inspection requirement — Chimneys and vents
Stephen Shishko
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
03/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
03/02/2026
Special inspection requirement — Final
Stephen Shishko
03/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
03/02/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
02/27/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P4
02/27/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P5
02/27/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P6
02/27/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-S3
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
02/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
02/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
02/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
02/18/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
02/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
02/18/2026
Special inspection requirement — Chimneys and vents
Stephen Shishko
02/18/2026
Special inspection requirement — Final
Stephen Shishko
02/17/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
02/06/2026
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01265291-I1
02/05/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P3
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
01/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
01/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
01/26/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P2
01/25/2026
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-P1
01/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
01/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
09/25/2025
Permit issued — General Construction
M01271268-I1-GC
09/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/22/2025
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. WORK INCLUDES MASONRY RESTORATION, WATERPROOFING INSTALLATION AND RESEALING AT EXTERIOR ENVELOPE NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01271268-I1
08/08/2025
Permit issued — Suspended Scaffold
M01265291-I1-SC
08/04/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01265291-I1
08/01/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
08/01/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/11/2025
Permit issued — Boiler Equipment
M01222163-I1-BE
07/03/2025
Permit issued — Plumbing
M01222163-S2-PL
07/03/2025
Permit issued — Mechanical Systems
M01222163-S1-MS
06/30/2025
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-I1
06/30/2025
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-S1
06/30/2025
Filed — Alteration
CONNECT REPLACEMENT GAS/OIL BURNER AND NEW HOT WATER HEATER TO EXISTING GAS PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M01222163-S2
11/13/2024
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repairs.
M01130581-I1
11/01/2024
Permit issued — Suspended Scaffold
M01130581-I1-SC
10/22/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repairs.
M01130581-I1
10/02/2024
Signed off — Alteration
MASONRY RESTORATION AND FLASHING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01041156-I1
08/20/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01060190-I1
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offTHE METRO GROUP PLBG LLC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedMICHAEL DELLAVECCHIA&SONS09/25/2025
DOB NOWSuspended ScaffoldSigned-offL & Z RESTORATION CORP08/08/2025
DOB NOWBoiler EquipmentSigned-offRICHARD MORTMAN07/11/2025
DOB NOWPlumbingPermit IssuedTHE METRO GROUP PLBG LLC07/03/2025
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC07/03/2025
DOB NOWSuspended ScaffoldSigned-offL & Z RESTORATION CORP11/01/2024
DOB NOWSuspended ScaffoldPermit IssuedL & Z RESTORATION CORP07/11/2024
DOB NOWGeneral ConstructionSigned-offMICHAEL DELLAVECCHIA&SONS06/20/2024
DOB NOWSuspended ScaffoldSigned-offL & Z RESTORATION CORP06/10/2024
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/06/2024
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU03/07/2022
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU08/19/2021
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU10/06/2018
DOB NOWSidewalk ShedSigned-offPROTO RESTORATION CONSTRU07/28/2018
BISOTISSUEDPROTO RESTORATION CONSTRUCTION01/04/2022
BISOTISSUEDPROTO RESTORATION CONSTRUCTION03/16/2021
BISOTISSUEDPROTO RESTORATION CONSTRUCTION10/23/2020
BISOTISSUEDPROTO RESTORATION CONSTRUCTION03/20/2019
BISOTISSUEDPROTO RESTORATION CONSTRUCTION06/11/2018
BISOTISSUEDBANNER CONSTRUCTION CORP03/10/2016
BISPLISSUEDR.J.C. MECHANICAL CORP03/01/2016
BISOTISSUEDBANNER CONSTRUCTION CORP02/26/2016
BISPLISSUEDR.J.C. MECHANICAL CORP11/21/2012
BISPLISSUEDR.J.C. MECHANICAL CORP08/27/2012
BISOTISSUEDBANNER CONSTRUCTION CORP08/09/2012
BISPLISSUEDFRED SMITH P&H CO INC05/23/2011
BISPLISSUEDR.J.C. MECHANICAL CORP11/23/2010
BISOTISSUEDGONZALEZ & SANCHEZ CONSTR11/19/2010
BISOTISSUEDDOLMEN RESTORATION INC04/27/2007
BISOTISSUEDKAY WATERPROOFING CORP03/29/2007
BISPLISSUEDROEBLING PLBG AND HTG04/27/2000
BISOTISSUEDPHILIP EGGERS09/07/1999
BISPLISSUEDWALTER J.GRANDE P & H INC07/13/1994
1 project · most recent 02/27/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
02/27/2026Permit IssuedTHE METRO GROUP, INCOthers
Other
— NFPA APPROVED 10-GAUGE CHIMNEY LINER 1 BTU · Chimney ×2
1 project · most recent 02/27/2026
Gas
FiledStatusContractorScope
02/27/2026Signed-offTHE METRO GROUP PLBG LLCGas
6 projects · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026CompleteNORTHEAST ELECTRICAL CONTRACTINGGeneral Wiring
08/08/2024CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
06/06/2024CompleteRICHARD NEU—
04/22/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
08/31/2021CompleteTOP SHELF ELECTRIC CORP—
07/27/2018Permit IssuedLINTECH ELECTRIC, INC.—
1 project · most recent 08/22/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/22/2025Permit IssuedL & Z RESTORATION CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/17/2026Fail-Final Boiler Equipment InspectionFailView ↗
09/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
03/02/2026Chimneys and ventsStephen Shishkospecial
03/02/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
03/02/2026HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
03/02/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
03/02/2026Tenant Protection Plan ComplianceStephen Shishkospecial
03/02/2026FinalStephen Shishkoprogress
03/02/2026Tenant Protection Plan ComplianceStephen Shishkospecial
03/02/2026Mechanical SystemsStephen Shishkospecial
02/26/2026Tenant Protection Plan ComplianceStephen Shishkospecial
02/26/2026Tenant Protection Plan ComplianceStephen Shishkospecial
02/18/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
02/18/2026HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
02/18/2026Mechanical SystemsStephen Shishkospecial
02/18/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
02/18/2026Chimneys and ventsStephen Shishkospecial
02/18/2026FinalStephen Shishkoprogress
01/29/2026Tenant Protection Plan Compliance—special
01/27/2026HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
01/27/2026HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
01/27/2026HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
01/16/2026Tenant Protection Plan ComplianceStephen Shishkospecial
01/16/2026Tenant Protection Plan ComplianceStephen Shishkospecial
12/17/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/17/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/17/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
Latest 25 of 42.
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/06/2026M00062645-I1Request digital key ↗
09/03/2026M00576590-I1Request digital key ↗
09/02/2026M00691153-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits28
▸BISWORK PERMIT APPLICATION12
10/26/2020123876298Open ↗
03/21/2019123385443Open ↗
06/11/2018123385443Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
10/04/2022123876298Open ↗
04/07/2021123385443Open ↗
08/26/2020123876298Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLPC Approval/Permit4
08/27/2026M01041156-P1Open ↗
08/27/2026M01041156-I1Open ↗
08/13/2026M01271268-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/10/2020123876298Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature21
09/23/2026M01222163-S1Open ↗
09/01/2026M01222163-P2Open ↗
09/01/2026M01222163-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/06/2026M00062645-I1Open ↗
09/03/2026M00576590-I1Open ↗
09/02/2026M00691153-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M01222163-S1Open ↗
09/23/2026M01222163-S1Open ↗
09/23/2026M01222163-S1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
06/11/2018123385443Open ↗
03/15/2018123385443Open ↗
12/14/2016122635050Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
05/05/2011120680138Open ↗
09/13/2010120174104Open ↗
09/13/2010120174104Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/18/2016122635050Open ↗
05/06/2011120680138Open ↗
09/13/2010120174104Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/18/2016122635050Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE8
07/18/2013120174104Open ↗
06/27/2013120174104Open ↗
05/01/2013121173951Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
05/20/2013120174104Open ↗
08/09/2012121173951Open ↗
05/05/2011120680138Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/18/2016122635050Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
06/16/2020123876298Open ↗
05/25/2018123385443Open ↗
03/15/2018123385443Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/31/2020123876298Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026M01041156-P1Open ↗
08/27/2026M01041156-I1Open ↗
08/13/2026M01041156-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/23/2026M01222163-S1Open ↗
08/23/2026M01222163-I1Open ↗
08/23/2026M01222163-S3Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/15/2018123385443Open ↗
02/18/2016122635050Open ↗
09/08/2010120174104Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/05/2011120680138Open ↗
09/08/2010120174104Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU1576MN201
07/24/2023123876298Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/15/2018123385443Open ↗
12/14/2016122635050Open ↗
02/18/2016122635050Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
05/26/2011120680138Open ↗
05/26/2011120680138Open ↗
05/05/2011120680138Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/14/2016122635050Open ↗
12/06/2012120680138Open ↗
07/17/2013120174104Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/07/2021123385443Open ↗
06/10/2020123876298Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/21/2023123876298Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/21/2023123876298Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/21/2023123876298Open ↗
▸BISFENESTRATION AREAS1
07/21/2023123876298Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/21/2023123876298Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY4
10/04/2022123876298Open ↗
10/04/2022123876298Open ↗
04/07/2021123385443Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS3
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
07/21/2023123876298Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
▸BISMASONRY2
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
▸BISPOST-INSTALLED ANCHORS2
07/21/2023123876298Open ↗
07/21/2023123876298Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/21/2023123385443Open ↗
▸Approvals, Objections & Sign-offs20
▸BISLANDMARKS APPROVAL6
08/31/2020123876298Open ↗
05/31/2018123385443Open ↗
02/18/2016122635050Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/24/2023123385443Open ↗
07/24/2023123876298Open ↗
12/14/2016122635050Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
08/09/2012121173951Open ↗
05/05/2011120680138Open ↗
09/08/2010120174104Open ↗
▸BISFINAL2
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/14/2016122635050Open ↗
12/06/2012120680138Open ↗
▸BISLANDMARKS SIGNOFF1
07/24/2023123385443Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
10/04/2022123876298Open ↗
04/07/2021123385443Open ↗
06/10/2020123876298Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/21/2023123385443Open ↗
07/21/2023123876298Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION7
11/10/2022123876298Open ↗
09/19/2022123385443Open ↗
10/18/2020123876298Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET5
05/29/2020123876298Open ↗
03/15/2018123385443Open ↗
02/18/2016122635050Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
10/26/2020123876298Open ↗
10/21/2020123876298Open ↗
▸BISeFiling Job Application Cover Sheet1
09/13/2010120174104Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/13/2026M01060255-I1Open ↗
08/13/2026M01130581-I1Open ↗
08/13/2026M01060255-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01130581-I1Open ↗
08/13/2026M01265291-I1Open ↗
08/13/2026M01060255-P1Open ↗
Showing 3 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
08/09/2012121173951Open ↗
08/09/2012121173951Open ↗