1232 54TH STREET
BIN 3430421
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing for new four-story and cellar building66p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 4Installation of new boilers61p · 2 filings · 20 docs
Floor 3Installation of new boilers63p · 2 filings · 20 docs
Floor 2Installation of new boilers60p · 2 filings · 20 docs
Floor 1Installation of new boilers60p · 2 filings · 20 docs
CellarPlumbing for new four-story and cellar building71p · 3 filings · 20 docs
Site & exteriorLight duty pipe scaffold9p · 3 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asher Architect1104/29/2026
Eyal Levitt Architect305/08/2025
Ashraf211/27/2024
Mey Associates109/10/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue Dream BuildersGeneral Contractor607/08/2026
Kishan PlumbingPlumbing307/08/2026
J & G Construction ServicesScaffold104/09/2026
Prime Piping & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM Engineering15141304/29/2026
Building Lifecycle
All (84)Filed (17)Permit Issued (16)Signed Off (12)Inspection (9)Special Inspection (30)
06/04/2026
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-I1
05/27/2026
Signed off — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW FOUR-STORY AND CELLAR BUILDING, FILED IN CONJUNCTION WITH GC #B00681451-I1
B00683838-I1
05/11/2026
Special inspection requirement — Lighting controls
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Underpinning
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Metering
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Insulation placement and R values
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Air barrier - visual inspection
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Interior lighting power
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Fenestration areas
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Concrete - Cast-In-Place
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Exterior lighting power
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Protection of exposed foundation insulation
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Energy Code Compliance Inspections
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Lighting in dwelling units
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Fenestration air leakage
RAUL VELASQUEZ MARTINEZ
05/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
RAUL VELASQUEZ MARTINEZ
04/29/2026
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-P3
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/15/2026
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S9
12/31/2025
Signed off — Alteration
Boiler plans filed herewith.
B01218121-I1
12/29/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S2
12/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/22/2025
Permit issued — General Construction
B00681451-I1-GC
12/08/2025
Permit issued — Plumbing
B00683838-I1-PL
11/10/2025
Permit issued — Mechanical Systems
B00681451-S9-MS
10/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/30/2025
Permit issued — Sprinklers
B00681451-S2-EW-SP
09/02/2025
Permit issued — Boiler Equipment
B01218121-I1-BE
08/19/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S6
08/19/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S5
07/30/2025
Signed off — Alteration
INSTALLING 8'-0" HIGH CONSTRUCTION FENCE
B01109076-I1
06/11/2025
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-P2
05/08/2025
Filed — Alteration
Boiler plans filed herewith.
B01218121-I1
05/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
RAUL VELASQUEZ MARTINEZ
04/30/2025
Signed off — Alteration
B01146439-I1
04/30/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01044878-I1
04/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
RAUL VELASQUEZ MARTINEZ
04/29/2025
Special inspection requirement — Maintenance information
RAUL VELASQUEZ MARTINEZ
04/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
RAUL VELASQUEZ MARTINEZ
04/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RAUL VELASQUEZ MARTINEZ
04/29/2025
Special inspection requirement — Heating Systems
RAUL VELASQUEZ MARTINEZ
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/28/2025
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-P1
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/28/2025
Special inspection requirement — Concrete - Cast-In-Place
RAUL VELASQUEZ MARTINEZ
04/28/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
RAUL VELASQUEZ MARTINEZ
04/28/2025
Special inspection requirement — Subgrade Inspections
RAUL VELASQUEZ MARTINEZ
04/21/2025
Filed — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S9
04/07/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S3
04/07/2025
Signed off — New Building
INSTALL NEW FIRE SPRINKLER SYSTEM IN THE ENTIRE BUILDING I.A.W. NFPA 13 2007 EDIT, AS MODIFIED BY NYC BC 2014 APPENDIX Q AS PER PLAN, IN CONJUNCTION W/ NYC DOB NOW JOB #: B00681451-I1.
B00681451-S7
04/04/2025
Filed — Alteration
PLUMBING PLAN FOR PIPING AND PLUMBING FIXTURES TO NEW FOUR-STORY AND CELLAR BUILDING, FILED IN CONJUNCTION WITH GC #B00681451-I1
B00683838-P1
12/03/2024
Permit issued — General Construction
B00681451-I1-GC
11/29/2024
Permit issued — Supported Scaffold
B01146439-I1-SF
11/27/2024
Filed — Alteration
B01146439-I1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/22/2025
DOB NOWPlumbingSigned-offN and S Plumbing12/08/2025
DOB NOWMechanical SystemsSigned-offBlue Dream Builders11/10/2025
DOB NOWSprinklersSigned-offAmb Mechanical09/30/2025
DOB NOWBoiler EquipmentSigned-offN and S Plumbing09/02/2025
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/03/2024
DOB NOWSupported ScaffoldSigned-offJ & G Construction Services11/29/2024
DOB NOWConstruction FenceSigned-offBlue Dream Builders09/12/2024
DOB NOWPlumbingSigned-offN and S Plumbing07/22/2024
DOB NOWSidewalk ShedSigned-offJ & G Construction Services05/07/2024
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders12/08/2023
DOB NOWStructuralSigned-offBlue Dream Builders09/07/2023
DOB NOWFoundationSigned-offBlue Dream Builders09/07/2023
DOB NOWSupport of ExcavationSigned-offBlue Dream Builders08/31/2023
DOB NOWGeneral ConstructionPermit IssuedBlue Dream Builders08/30/2023
DOB NOWFoundationSigned-offBlue Dream Builders08/30/2023
1 project · most recent 04/29/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2026Permit IssuedBlue Dream BuildersHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Daikin RXTQ60TBVJUB 5 tons · Vrf Outdoor ×20
RXTQ48TBVJUB 4 tons · Vrf Outdoor ×4
Heating
Nti TFTN 340 340,000 BTU · Boiler ×12
TRX199 199,000 BTU · Boiler ×8
Ventilation
Daikin VAM300GVJU 300 CFM · Erv ×4
2 projects · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026CompleteB.P. ElectricGeneral Wiring
05/03/2024CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/29/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
05/11/2026Protection of exposed foundation insulationRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
05/11/2026Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
05/11/2026Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
05/11/2026Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
05/11/2026UnderpinningRAUL VELASQUEZ MARTINEZspecial
05/11/2026Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
05/11/2026Fire-Resistance Rated ConstructionRAUL VELASQUEZ MARTINEZprogress
05/11/2026Fenestration and door U-factor and product ratingsRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Exterior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Lighting controlsRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Fenestration air leakageRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Lighting in dwelling unitsRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Interior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Fenestration areasRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Insulation placement and R valuesRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026MeteringRAUL VELASQUEZ MARTINEZenergy_progress
05/11/2026Air barrier - visual inspectionRAUL VELASQUEZ MARTINEZenergy_progress
05/05/2025Duct leakage testing, insulation and designRAUL VELASQUEZ MARTINEZenergy_progress
04/29/2025Heating SystemsRAUL VELASQUEZ MARTINEZspecial
04/29/2025HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
04/29/2025HVAC-R and service water heating system controlsRAUL VELASQUEZ MARTINEZenergy_progress
04/29/2025Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
04/29/2025Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
Latest 25 of 96.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/25/2026B01044878-I1Request digital key ↗
08/24/2026B01109076-I1Request digital key ↗
08/23/2026B01146439-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026B00681451-P3Open ↗
08/13/2026B00681451-P2Open ↗
08/13/2026B00681451-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B00681451-P3Open ↗
08/13/2026B00681451-P2Open ↗
08/13/2026B00681451-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00681451-I1Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/23/2026B01146439-I1Open ↗
08/22/2026B00683838-I1Open ↗
08/17/2026B00681451-S5Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026B01218121-I1Open ↗
08/30/2026B00681451-S5Open ↗
08/27/2026B00681451-S7Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026B01218121-I1Open ↗
08/30/2026B00681451-S5Open ↗
08/30/2026B00681451-S5Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00681451-P1Open ↗
08/13/2026B00681451-I1Open ↗
08/13/2026B00681451-P2Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/17/2026B00681451-I1Open ↗
08/17/2026B00681451-P3Open ↗
08/17/2026B00681451-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00681451-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00681451-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00681451-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/17/2026B00681451-I1Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/23/2026B01146439-I1Open ↗
08/22/2026B00683838-I1Open ↗
08/17/2026B00681451-I1Open ↗
Showing 3 of 16 on file for this type
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026B00681451-P3Open ↗
08/13/2026B00681451-P1Open ↗
08/13/2026B00681451-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial1
08/17/2026B00681451-P3Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00681451-I1Open ↗
▸DOB NOWFinal Survey1
08/17/2026B00681451-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00681451-S3Open ↗