← Back
BuildNYC
Over six families without stores
1232 FRANKLIN AVENUE
BRONX · BIN 2128413
💬 Discuss this project
2017Year Built
4Stories
C1Building Class
R6Zoning
4,893 sfGross Floor Area
8Units
Rent Stabilized13 Active Violations ▸
Over six families without stores · Owner of record: 1230 Franklin · 2,000 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
StructuralMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Sprinkler system installation3p · 2 filings · 14 docs
Floor 3Sprinkler system installation3p · 2 filings · 14 docs
Floor 2Sprinkler system installation3p · 2 filings · 14 docs
Floor 1Sprinkler system installation3p · 2 filings · 14 docs
Site & exteriorSidewalk shed1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1230 Franklin2303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BFS Architect206/30/2020
Green Design112/19/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Angel DevelopmentGeneral Contractor503/21/2026
Phoenix Plumbing & Mechanicalspecialty_contractor407/08/2026
Pretee ConstructionGeneral Contractor203/21/2026
MPZ ConstructionGeneral Contractor203/21/2026
J.S.K. ConstructionScaffold107/08/2026
GW MechanicalPlumbing107/08/2026
Phoenix Plumbing & MechanicalPlumbing201/23/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS Architect7477206/30/2020
Building Lifecycle
01/09/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · open
06/07/2024
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · closed
06/07/2024
§ 27-2033 ADM code provide ready access to buildings heating system locked door at boiler room
HPD violation · open
10/15/2023
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOWS AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1A, 1st STORY, 1st…
HPD violation · open
09/30/2023
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL BY METHOD OF REGLAZING AT BATHTUB IN THE 2nd…
HPD violation · open
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offGW Mechanical07/09/2020
DOB NOWBoiler EquipmentPermit IssuedGW Mechanical06/03/2020
DOB NOWSidewalk ShedSigned-offJSK Construction12/20/2017
BISEQISSUEDMPZ Construction02/20/2020
BIS—ISSUEDMPZ Construction02/20/2020
BISPLISSUEDGW Mechanical01/23/2020
BIS—ISSUEDAngel Development03/29/2019
BISSPISSUEDPhoenix Plumbing & Mechanical03/29/2019
BIS—ISSUEDAngel Development01/25/2019
BISPLISSUEDGW Mechanical01/25/2019
BIS—ISSUEDAngel Development01/25/2019
BIS—ISSUEDAngel Development08/16/2018
BISEQISSUEDAngel Development08/16/2018
BIS—ISSUEDPretee Construction04/23/2018
BISEQISSUEDPretee Construction04/23/2018
BIS—ISSUEDAngel Development01/30/2018
BISEQISSUEDAngel Development01/25/2018
BISOTISSUEDAngel Development07/27/2017
2 projects · most recent 06/16/2020
General Wiring
FiledStatusContractorScope
06/16/2020CompleteTempest Electrical ContractingGeneral Wiring
12/19/2017Complete4000 Electric—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/24/2020Post-installed AnchorsBelal Salimspecial
06/24/2020Sprinkler SystemsBelal Salimspecial
06/24/2020Fire-Resistant Penetrations and JointsBelal Salimspecial
05/27/2020HVAC and service water heating equipment Belal Salimenergy_progress
05/27/2020Maintenance informationBelal Salimenergy_progress
05/27/2020HVAC and service water heating system controls Belal Salimenergy_progress
05/27/2020Shutoff dampersBelal Salimenergy_progress
05/27/2020Fire-Resistant Penetrations and JointsBelal Salimspecial
05/27/2020Heating SystemsBelal Salimspecial
12/18/2017FinalBRIAN T. O'CONNORprogress
154 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account