← Back
Over six families without stores
1233 WHITE PLAINS ROAD
BRONX · Castle Hill-Unionport · BIN 2024876
💬 Discuss this project
1928Year Built
5Stories
C1Building Class
R5Zoning
23,425 sfGross Floor Area
32Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: HELP CLUSTERS HOUSING DEVELOPMENT FUND C ORPORATION · 7,889 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof5p · 3 filings · 20 docs
Floor 51p · 1 filing · 17 docs
Floor 41p · 1 filing · 17 docs
Floor 31p · 1 filing · 17 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 1 filing · 17 docs
CellarUnder Construction6p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEIGHBORHOOD RENEWAL HDFC707/08/2026
PLATINUM SERVICES NY1407/08/2026
HELP DEVELOPMENT1207/08/2026
MSR CONSTRUCTION CORP503/22/2026
HELP CLUSTERS HOUSING DEVELOPMENT FUND C ORPORATION103/22/2026
NEIGHBORHOOD RESTORE HDFC103/21/2026
HELP USA203/21/2026
HELP CLUSTERS HDFC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2019$7.1M—— → —$305/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SKYLINE ENGINEERING, LLC1101/22/2025
URBAN INTEGRATIONS105/26/2023
ASHRAF CORP304/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PLATINUM SERVICES NY403/21/2026
WILLIAM VITACCO ASSOCIATES2203/21/2026
GREEN STUDIO203/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor807/08/2026
AJC PLUMBING & HTG CORPPlumbing407/08/2026
PANDELI GJINIElectrical203/21/2026
A.A.D. CONSTRUCTION CORPGeneral Contractor203/21/2026
MSR CONSTRUCTION CORPGeneral Contractor203/21/2026
EXPRESS PL SWR & WTR APlumbing203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803901/22/2025
Building Lifecycle
All (168)Filed (15)Permit Issued (10)Signed Off (7)Violation (60)Inspection (10)Objection (36)Special Inspection (30)
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
C
04/17/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/25/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00861498-I1
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/28/2025
Permit issued — Plumbing
X01163016-I1-PL
07/14/2025
Violation issued (HPD, closed)
B
07/14/2025
Violation issued (HPD, closed)
C
03/22/2025
Violation issued (HPD, closed)
C
03/22/2025
Violation issued (HPD, closed)
B
03/22/2025
Violation issued (HPD, closed)
C
01/22/2025
Filed — Alteration
X01163016-I1
09/30/2024
Signed off — Alteration
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00558535-I1
06/07/2024
Signed off — Alteration
Installation of boiler as shown on plans
X00387974-S1
06/06/2024
Signed off — Alteration
Installation of boiler as shown on plans
X00387974-I1
05/28/2024
Signed off — Alteration
Mechanical systems as shown on plans
X00387687-I1
04/19/2024
Violation issued (HPD, closed)
B
04/19/2024
Violation issued (HPD, closed)
B
04/16/2024
Signed off — Alteration
Plumbing work as shown on plans
X00387708-I1
04/09/2024
Permit issued — Mechanical Systems
X00387687-I1-MS
04/01/2024
Violation issued (HPD, closed)
B
03/05/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/19/2024
Signed off — Alteration
X00879724-I1
02/06/2024
Violation issued (HPD, closed)
A
01/31/2024
Violation issued (HPD, closed)
I
01/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
01/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/19/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
01/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
01/19/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
01/18/2024
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
01/18/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
01/18/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
01/18/2024
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
01/16/2024
Filed — Alteration
Installation of boiler as shown on plans
X00387974-P3
01/16/2024
Filed — Alteration
Installation of boiler as shown on plans
X00387974-P2
01/09/2024
Special inspection requirement — HVAC and service water heating system controls
SAMI HAJJAR P.E
01/09/2024
Special inspection requirement — HVAC and service water heating equipment
SAMI HAJJAR P.E
01/09/2024
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
01/09/2024
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
11/01/2023
Permit issued — Boiler Equipment
X00387974-S1-BE
10/26/2023
Permit issued — Boiler Equipment
X00387974-I1-BE
10/20/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
10/06/2023
Filed — Alteration
Plumbing work as shown on plans
X00387708-P2
10/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/11/2023
Permit issued — Plumbing
X00387708-I1-PL
07/18/2023
Permit issued — Sidewalk Shed
X00558535-I1-SH
07/17/2023
Filed — Alteration
Installation of boiler as shown on plans
X00387974-S1
07/17/2023
Filed — Alteration
Installation of boiler as shown on plans
X00387974-P1
07/10/2023
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Heating Systems
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Chimneys and vents
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
Latest 60 of 168 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAJC PLUMBING & HTG CORP10/28/2025
DOB NOWMechanical SystemsSigned-offA.A.D. CONSTRUCTION CORP04/09/2024
DOB NOWBoiler EquipmentSigned-offAJC PLUMBING & HTG CORP11/01/2023
DOB NOWBoiler EquipmentSigned-offAJC PLUMBING & HTG CORP10/26/2023
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP08/11/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offMSR CONSTRUCTION CORP05/30/2023
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/01/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/19/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC08/17/2021
BISOTISSUEDA.A.D. CONSTRUCTION CORP08/14/2023
BISOTISSUEDA.A.D. CONSTRUCTION CORP08/14/2023
BISOTISSUEDA.A.D. CONSTRUCTION CORP05/02/2023
BISOTISSUEDA.A.D. CONSTRUCTION CORP05/02/2023
BISBLISSUEDJAMES RHODES12/29/1999
BISFSISSUEDWASOFF PLBG. & UTL.CO INC08/17/1995
2 projects · most recent 02/16/2023
General Wiring
FiledStatusContractorScope
02/16/2023CompleteTECHNO-VOLT ELEC, INCGeneral Wiring
07/20/2021CompleteILLUMINOUS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/05/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
01/19/2024HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/19/2024HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
01/19/2024Heating SystemsSAMI HAJJAR P.Especial
01/19/2024Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
01/19/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/18/2024HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
01/18/2024Heating SystemsSAMI HAJJAR P.Especial
01/18/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/18/2024HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
01/09/2024HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
01/09/2024HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
01/09/2024Maintenance informationSAMI HAJJAR P.Eenergy_progress
01/09/2024Heating SystemsSAMI HAJJAR P.Especial
10/11/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/10/2023Maintenance informationSAMI HAJJAR P.Eenergy_progress
07/10/2023Post-installed AnchorsSAMI HAJJAR P.Especial
07/10/2023Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/10/2023Heating SystemsSAMI HAJJAR P.Especial
07/10/2023Chimneys and ventsSAMI HAJJAR P.Especial
07/10/2023FinalSAMI HAJJAR P.Eprogress
07/10/2023Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/10/2023HVAC and service water heating system controls SAMI HAJJAR P.Eenergy_progress
07/10/2023HVAC and service water heating equipment SAMI HAJJAR P.Eenergy_progress
07/10/2023HVAC insulation and sealing SAMI HAJJAR P.Eenergy_progress
07/10/2023Mechanical SystemsSAMI HAJJAR P.Especial
Latest 25 of 42.
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
08/25/2026X00558535-I1Request digital key ↗
08/25/2026X00558535-P1Request digital key ↗
08/23/2026X00861498-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026X00387708-P1Request digital key ↗
08/15/2026X00387708-I1Request digital key ↗
08/15/2026X00387708-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment3
08/23/2026X00387974-P2Request digital key ↗
08/23/2026X00387974-P1Request digital key ↗
08/23/2026X00387974-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/25/2026X00387687-P1Request digital key ↗
08/14/2026X00387687-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
02/26/2024240285936Open ↗
02/23/2024240285936Open ↗
03/17/2021240285936Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
05/02/2023240285936Open ↗
05/02/2023240285936Open ↗
▸BISPROVIDE TYPE OF SCAFFOLDING APPLICATIONINFORMATION1
05/02/2023240285936Open ↗
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
05/02/2023240285936Open ↗
▸BISPROVIDE SIDEWALK SHED APPLICATION INFORMATION1
05/02/2023240285936Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00387687-I1Open ↗
08/25/2026X00387687-P1Open ↗
08/25/2026X00387708-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00387974-S1Open ↗
09/23/2026X00387974-I1Open ↗
09/23/2026X00387974-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026X00387974-S1Open ↗
09/23/2026X00387974-I1Open ↗
09/02/2026X00387974-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/10/2020240285936Open ↗
▸Trade Schedules & Equipment1
▸BISPLUMBING (PL) SIGNOFF1
04/25/2024240285936Open ↗
▸Safety & Tenant Protection9
▸DOB NOWTenant Protection Plan8
08/13/2026X00387974-P1Open ↗
08/13/2026X00387974-I1Open ↗
08/13/2026X00387708-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes1
05/10/2021240285936Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/20/2026X01163016-I1Open ↗
08/15/2026X00387708-I1Open ↗
08/14/2026X00387687-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/02/2023240285936Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/13/2021240285936Open ↗
05/10/2021240285936Open ↗
11/10/2020240285936Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00387687-I1Open ↗
08/13/2026X00387974-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00387974-I1Open ↗
08/13/2026X00387974-S1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/22/2024240285936Open ↗
▸BISINTERIOR LIGHTING POWER1
02/22/2024240285936Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/22/2024240285936Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/22/2024240285936Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/22/2024240285936Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/22/2024240285936Open ↗
▸BISLIGHTING CONTROLS1
02/22/2024240285936Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/22/2024240285936Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/02/2023240285936Open ↗
08/13/2021240285936Open ↗
08/13/2021240285936Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/22/2024240285936Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/22/2024240285936Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
04/25/2024240285936Open ↗
▸BISPOST-INSTALLED ANCHORS1
04/25/2024240285936Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/20/2026X01163016-I1Open ↗
08/13/2026X00387708-P2Open ↗
08/13/2026X00387708-P1Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/19/2021240285936Open ↗
10/09/2020240285936Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/24/2024240285936Open ↗
▸BISFINAL1
02/22/2024240285936Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/10/2021240285936Open ↗
05/10/2021240285936Open ↗
11/10/2020240285936Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/22/2024240285936Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM1
03/03/2021240285936Open ↗
▸BISEFILING COVER SHEET1
03/03/2021240285936Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/10/2020240285936Open ↗
▸Other Documents9
▸DOB NOWDHCR Document9
08/13/2026X00387708-P1Open ↗
08/13/2026X00387687-P1Open ↗
08/13/2026X00387974-P2Open ↗
Showing 3 of 9 on file for this type