← Back
Church, synagogue, chapel
1234 EAST NEW YORK AVENUE
BROOKLYN · Brownsville · BIN 3080836
💬 Discuss this project
1930Year Built
2Stories
M1Building Class
R6Zoning
12,750 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: GREATER NY CP/7TH-DAY AD · 7,714 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 5 docs
Floor 2Under Construction21p · 1 filing · 18 docs
Floor 1Under Construction45p · 3 filings · 20 docs
CellarUnder Construction31p · 2 filings · 20 docs
Site & exteriorUnder Construction13p · 2 filings · 20 docs
Filed — no permit issued2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREATER NY CORP OF SDA603/21/2026
EBENEZER 7TH DAY ADVENTIST CHURC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING SERVICE103/21/2026
FAVIO MARIA BARRIONUEVO203/21/2026
CITY CONSULTANT ENGINEERING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUNIOR CARTER MECH. CORPPlumbing208/05/2026
AGG CONTROLS ELECT CORPElectrical103/22/2026
TF ELECTRICAL CORPElectrical103/22/2026
UPRIGHT FIRE PROTCTN LLCFire Protection107/08/2026
MASTER FIRE MECH CORPGeneral Contractor106/28/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OMFPE CONSULTING PLLC8018208/26/2026
ADJ ENGINEERING PLLC7640403/31/2026
ASKON ARCHITECT, P.C.3596103/26/2025
Building Lifecycle
All (40)Filed (6)Permit Issued (5)Violation (8)Inspection (1)Objection (4)Special Inspection (16)
08/26/2026
Filed — Alteration
INSTALL GAS PIPING, KITCHEN FIRE SUPPRESSION GAS VALVE AND GAS STOVE ON FIRST FLOOR. REMOVE EXISTING GAS BOILER AND GAS HOT WATER HEATER IN CELLAR. INSTALL NEW ELECTRIC WATER HEATER
B01390527-P1
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Oswin Fairweather
08/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Oswin Fairweather
08/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Oswin Fairweather
08/20/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/04/2026
Permit issued — Plumbing
B01390527-I1-PL
05/18/2026
Permit issued — Mechanical Systems
B01365806-I1-MS
04/24/2026
Filed — Alteration
INSTALL GAS PIPING, KITCHEN FIRE SUPPRESSION GAS VALVE AND GAS STOVE ON FIRST FLOOR. REMOVE EXISTING GAS BOILER AND GAS HOT WATER HEATER IN CELLAR. INSTALL NEW ELECTRIC WATER HEATER
B01390527-I1
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Oswin Fairweather
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Oswin Fairweather
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Oswin Fairweather
03/31/2026
Filed — Alteration
INSTALLING NEW MUA HOOD, MUA/EXHAUST DUCTS & MUA/EXHAUST FANS AT EXISTING HOUSE OF WORSHIP. FIRSTOPPING WILL NOT BE DISTURBED. NO OTHER WORK PROPOSED. THERE WILL BE NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01365806-I1
03/01/2026
Special inspection requirement — Mechanical Systems
Dwayne Williams
03/01/2026
Special inspection requirement — Final
ADRIAN DIAS
11/19/2025
Permit issued — Plumbing
B08022541-S1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
03/31/2025
Special inspection requirement — Post-installed Anchors
Dwayne Williams
03/31/2025
Special inspection requirement — Sprinkler Systems
Dwayne Williams
03/26/2025
Filed — Alteration
INSTALL NEW WET PIPE SPRINKLER SYSTEM IN EXSISTING HOUSE OF WORSHIP
B08022541-P1
03/24/2025
Special inspection requirement — Post-installed Anchors
Dwayne Williams
03/24/2025
Special inspection requirement — Sprinkler Systems
Akeeb Shekoni
03/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/15/2025
Permit issued — Sprinklers
B08022541-I1-EW-SP
06/11/2024
Permit issued — Plumbing
B08022541-S1-PL
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dwayne Williams
12/06/2022
Objection raised — Structural
12/06/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Admin
12/06/2022
Objection resolved — Addressed
12/01/2022
Filed — Alteration
INSTALL NEW WET PIPE SPRINKLER SYSTEM IN EXSISTING HOUSE OF WORSHIP
B08022541-S1
11/25/2022
Filed — Alteration
INSTALL NEW WET PIPE SPRINKLER SYSTEM IN EXSISTING HOUSE OF WORSHIP
B08022541-I1
06/08/2022
Special inspection requirement — Sprinkler Systems
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJUNIOR CARTER MECH. CORP08/04/2026
DOB NOWMechanical SystemsPermit IssuedMASTER FIRE MECH CORP05/18/2026
DOB NOWPlumbingPermit IssuedJUNIOR CARTER MECH. CORP11/19/2025
DOB NOWSprinklersPermit IssuedH.J. FLOOD INC.01/15/2025
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC06/11/2024
BIS—ISSUEDGREATER NY CONFERENCE OF07/28/2023
BIS—ISSUEDGREATER NY CONFERENCE OF04/03/2023
BIS—ISSUEDGREATER NY CONFERENCE OF01/27/2023
BISPLISSUEDNCA PLUMBING&HEATING LLC11/30/2011
BISOTISSUEDUNIVERSAL DESIGN AND CONS09/23/2009
BISPLISSUEDNCA PLUMBING&HEATING LLC08/06/2009
BISBLISSUEDMASTERS MECHANICAL PLBG & HTG10/31/1997
BISPLISSUEDMASTERS MECHANICAL PLBG & HTG10/07/1997
1 project · most recent 03/31/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2026Permit IssuedMASTER FIRE MECH CORPVentilation Systems
Ventilation
Captiveaire MODEL # DMUA16FA 1,300 CFM · Makeup Air ×3
MODEL # DU18HFA 1,800 CFM · Exhaust Fan ×2
1 project · most recent 03/26/2025
FiledStatusContractorScope
03/26/2025Permit IssuedUPRIGHT FIRE PROTCTN LLC294 heads
1 project · most recent 08/26/2026
Gas
FiledStatusContractorScope
08/26/2026Permit IssuedJUNIOR CARTER MECH. CORPGas
2 projects · most recent 10/06/2024
General Wiring
FiledStatusContractorScope
10/06/2024Permit IssuedTF ELECTRICAL CORPGeneral Wiring
02/21/2024Permit IssuedAGG CONTROLS ELECT CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/20/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/25/2026Fire-Resistant Penetrations and JointsOswin Fairweatherspecial
08/25/2026HVAC-R and service water heating equipmentOswin Fairweatherenergy_progress
08/25/2026HVAC-R and service water piping design and insulationOswin Fairweatherenergy_progress
04/24/2026HVAC-R and service water piping design and insulationOswin Fairweatherenergy_progress
04/24/2026HVAC-R and service water heating equipmentOswin Fairweatherenergy_progress
04/21/2026Fire-Resistant Penetrations and JointsOswin Fairweatherspecial
03/01/2026Mechanical SystemsDwayne Williamsspecial
03/01/2026FinalADRIAN DIASprogress
03/31/2025Fire-Resistant Penetrations and JointsDwayne Williamsspecial
03/31/2025Post-installed AnchorsDwayne Williamsspecial
03/31/2025Sprinkler SystemsDwayne Williamsspecial
03/24/2025Post-installed AnchorsDwayne Williamsspecial
03/24/2025Sprinkler SystemsAkeeb Shekonispecial
03/24/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
12/12/2022Fire-Resistant Penetrations and JointsDwayne Williamsspecial
06/08/2022Sprinkler Systems—special
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/03/2026B01390527-P1Request digital key ↗
09/03/2026B01390527-I1Request digital key ↗
08/22/2026B08022541-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION6
01/10/2025321246709Open ↗
06/30/2022321246709Open ↗
02/28/2018321246709Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION5
01/27/2023321246709Open ↗
12/01/2011320052198Open ↗
09/28/2009320052198Open ↗
Showing 3 of 5 on file for this type
▸BISPLACE OF ASSEMBLY1
03/20/2017321446529Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/09/2020321246709Open ↗
03/09/2020321246709Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/13/2025321246709Open ↗
▸BISVERIFY TAX LOT1
12/13/2025321246709Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/13/2025321246709Open ↗
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B01390527-P1Open ↗
09/01/2026B01390527-I1Open ↗
09/01/2026B08022541-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/03/2026B01390527-P1Open ↗
09/03/2026B01390527-I1Open ↗
08/22/2026B08022541-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01390527-P1Open ↗
09/23/2026B01390527-P1Open ↗
09/01/2026B01390527-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/02/2016321246709Open ↗
07/30/2009320052198Open ↗
07/29/2009320052198Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/29/2009320052198Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/29/2009320052198Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING2
10/02/2009320052198Open ↗
07/29/2009320052198Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
07/15/2022321246709Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
07/15/2022321246709Open ↗
▸BISSPRINKLER APPLICATION MUST BE FILED PRIOR TO PERMIT.1
01/17/2023321246709Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
03/09/2020321246709Open ↗
07/29/2009320052198Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/17/2023321246709Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
07/15/2022321246709Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026B01390527-I1Open ↗
09/03/2026B01390527-P1Open ↗
08/22/2026B08022541-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/29/2009320052198Open ↗
▸Energy Compliance10
▸BISAIR SEALING AND INSULATION - VISUAL1
07/15/2022321246709Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/15/2022321246709Open ↗
▸BIS* DUCT LEAKAGE TESTING1
07/15/2022321246709Open ↗
▸BISFENESTRATION AREAS1
07/15/2022321246709Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/15/2022321246709Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/15/2022321246709Open ↗
▸BISLIGHTING CONTROLS1
07/15/2022321246709Open ↗
▸BIS* HVAC INSULATION AND SEALING1
07/15/2022321246709Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/02/2016321246709Open ↗
▸BISFENESTRATION AIR LEAKAGE1
07/15/2022321246709Open ↗
▸Inspections & Test Reports9
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/15/2022321246709Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/15/2022321246709Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
07/15/2022321246709Open ↗
▸BISMASONRY1
07/15/2022321246709Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS) MUST BE SUBMITTED PRIOR TO PERMIT.1
07/15/2022321246709Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/15/2022321246709Open ↗
▸BISMECHANICAL SYSTEMS1
07/15/2022321246709Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
07/15/2022321246709Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
07/15/2022321246709Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/03/2026B01390527-P1Open ↗
09/03/2026B01390527-I1Open ↗
08/17/2026B01365806-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/02/2016321246709Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/29/2009320052198Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/29/2009320052198Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/27/2023321246709Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
01/20/2023321246709Open ↗
01/20/2023321246709Open ↗
07/15/2022321246709Open ↗
▸BISEFILING COVER SHEET2
09/02/2016321246709Open ↗
07/29/2009320052198Open ↗