← Back
BuildNYC
Over six families without stores
1234 SHAKESPEARE AVENUE
BRONX · BIN 2003081
💬 Discuss this project
1925Year Built
5Stories
C1Building Class
R7-1Zoning
31,815 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized86 Active Violations ▸
Over six families without stores · Owner of record: HP 250 East 176 & 1234 Shakespeare Housi NG Development · 6,970 sf lot · 4.56 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5General interior renovation, partial floors8p · 1 filing · 17 docs
Floor 4General interior renovation, partial floors4p · 1 filing · 17 docs
Floor 3General interior renovation, partial floors4p · 1 filing · 17 docs
Floor 2General interior renovation, partial floors4p · 1 filing · 17 docs
Floor 1Unit 1A7p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1234 Shakespeare Realty803/21/2026
Yankee 167 Realty203/21/2026
HP 250 East 176 & 1234 Shakespeare Housi NG Development103/22/2026
Tribune Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture211/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bestco General Electric MainElectrical303/21/2026
Budo MaintenanceGeneral Contractor303/21/2026
Gemini Electric CoElectrical103/21/2026
Murray StanleyElectrical103/21/2026
Torres IvanElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
Accurate ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Biz Designs6312111/26/2025
AZ Professional Engineering766111/24/2025
Sia Inspections7306111/24/2025
Building Lifecycle
10/16/2026
Boiler inspection report filed
Initial · no defects · Accepted
08/17/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT BSMT-APT AA, 1st BSMT-APT…
HPD violation · open
08/17/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT BSMT-APT…
HPD violation · open
08/17/2026
§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXTENTION CORD ON FLOOR, CONNECTED FROM OUTLET,…
HPD violation · open
08/11/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM…
HPD violation · open
218 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBudo Maintenance12/02/2025
BISOTISSUEDBudo Maintenance01/14/2020
BISOTISSUEDMoon Construction09/11/2015
BISPLISSUEDDMT Plumbing & Heating08/27/2015
BISOTISSUEDMoon Construction08/07/2015
BISEQISSUEDSkyworx Contracting07/29/2015
BISPLISSUEDA. Heating and Plumbing Works10/22/2013
BISFSISSUEDEnvironmental Pro Mechanical10/22/2013
BISPLISSUEDSt Marks P & H Co07/28/1995
BISOTISSUEDSt Marks Plumbing & Heating Co07/28/1995
3 projects · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026Pending PaymentAccurate ElectricalGeneral Wiring
12/11/2019CompleteGemini Electric CoGeneral Wiring
02/06/2018CompleteGemini Electric CoGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
11/26/2025Tenant Protection Plan ComplianceJeff Akermanspecial
11/26/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
11/26/2025Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
11/26/2025FinalRachel Paskeszprogress
11/26/2025Fire-Resistance Rated ConstructionJeff Akermanprogress
11/26/2025Energy Code Compliance InspectionsJeff Akermanprogress
11/26/2025Insulation placement and R valuesJeff Akermanenergy_progress
11/26/2025Lighting in dwelling unitsJeff Akermanenergy_progress
11/25/2025Tenant Protection Plan ComplianceJeff Akermanspecial
11/25/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
11/25/2025Structural Stability – Alterations of existing buildings—special
11/25/2025FinalJeff Akermanprogress
11/25/2025Energy Code Compliance InspectionsJeff Akermanprogress
11/25/2025Fire-Resistance Rated ConstructionJeff Akermanprogress
11/25/2025Lighting in dwelling unitsJeff Akermanenergy_progress
11/25/2025Insulation placement and R valuesJeff Akermanenergy_progress
103 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account