Condo, residential tower (mixed-use, multi-family elevator) [derived]
1236 48TH STREET
BROOKLYN · Borough Park · BIN 3137405
💬 Discuss this project
1945Year Built
2Stories
RMBuilding Class
R6Zoning
2,913 sfGross Floor Area
2Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,000 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof17p · 1 filing · 20 docs
Floor 327p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 11p · 1 filing · 10 docs
Cellar2p · 1 filing · 13 docs
Basement2p · 2 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC1704/17/2026
ASHRAF CORP302/27/2025
R & O ENGINEERING309/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
EXSPEEDIUM603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLIDSTATE BUILDERS INCGeneral Contractor407/08/2026
ALROSE CONSTRUCTION INCGeneral Contractor307/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor207/08/2026
BRANCH PLUMBING LLCFire Protection207/08/2026
BRANCH PLUMBING LLCPlumbing207/08/2026
B&B MECH PLBG & HTG LLCPlumbing107/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616904/17/2026
CITY-WIDE TESTING INC416602/09/2022
Building Lifecycle
All (137)Filed (23)Permit Issued (14)Signed Off (12)Violation (15)Inspection (9)Objection (34)Special Inspection (30)
05/05/2026
Signed off — Alteration CO
Structural work
B01032275-I1
05/04/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/04/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/04/2026
Special inspection requirement — Metering
FAHAD FATEH
05/04/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/04/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/17/2026
Filed — Alteration CO
Structural work
B01032275-P8
03/23/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/18/2026
Signed off — Alteration CO
Structural work
B01032275-S4
03/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/17/2026
Special inspection requirement — Final
FAHAD FATEH
03/17/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
03/17/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/17/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
03/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/10/2026
Objection resolved — Addressed
03/10/2026
Objection resolved — Addressed
02/24/2026
Objection raised — Cost
02/24/2026
Objection raised — Cost
02/18/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Admin
02/04/2026
Filed — Alteration CO
Structural work
B01032275-P7
01/29/2026
Special inspection requirement — Final
FAHAD FATEH
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/29/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/29/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
01/29/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/15/2026
Signed off — Alteration
B01176581-I1
01/15/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01176579-I1
01/15/2026
Permit issued — Mechanical Systems
B01032275-S4-MS
01/07/2026
Signed off — Alteration CO
Structural work
B01032275-S2
01/07/2026
Signed off — Alteration CO
Structural work
B01032275-S3
11/24/2025
Violation issued (HPD, open)
I
11/20/2025
Signed off — Alteration CO
Structural work
B01032275-S6
11/20/2025
Signed off — Alteration CO
Structural work
B01032275-S5
11/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2025
Permit issued — Sprinklers
B01032275-S3-EW-SP
06/11/2025
Permit issued — Plumbing
B01032275-S2-PL
06/05/2025
Permit issued — Structural
B01032275-S5-ST
06/05/2025
Permit issued — Foundation
B01032275-S6-FO
06/05/2025
Permit issued — General Construction
B01032275-I1-GC
06/04/2025
Filed — Alteration CO
Structural work
B01032275-P6
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSOLIDSTATE BUILDERS INC01/15/2026
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC06/23/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC06/11/2025
DOB NOWStructuralSigned-offSOLIDSTATE BUILDERS INC06/05/2025
DOB NOWFoundationPermit IssuedSOLIDSTATE BUILDERS INC06/05/2025
DOB NOWGeneral ConstructionPermit IssuedSOLIDSTATE BUILDERS INC06/05/2025
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS02/10/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS02/10/2025
DOB NOWMechanical SystemsSigned-offALROSE CONSTRUCTION INC10/19/2021
DOB NOWPlumbingSigned-offBRANCH PLUMBING LLC10/14/2021
DOB NOWSprinklersSigned-offFRANK BRANCIFORTE10/14/2021
DOB NOWSprinklersSigned-offFRANK BRANCIFORTE06/16/2021
DOB NOWConstruction FenceSigned-offALROSE CONSTRUCTION INC05/14/2021
DOB NOWPlumbingSigned-offBRANCH PLUMBING LLC03/08/2021
BIS—ISSUEDALROSE CONSTRUCTION INC04/21/2021
BIS—ISSUEDALROSE CONSTRUCTION INC12/15/2020
1 project · most recent 04/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/17/2026Signed-offB&B MECH PLBG & HTG LLCGas, Storm, Water/Sanitary
4 projects · most recent 09/19/2025
General Wiring
FiledStatusContractorScope
09/19/2025CompleteFIRST QUALITY ELECL LLCGeneral Wiring
02/10/2025CompleteRICHARD NEU—
04/12/2022CompleteACCURATE ELEC'L CORP.General Wiring
03/03/2021CompleteLENS ELECTRIC, INCGeneral Wiring
1 project · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026Signed-offSOLIDSTATE BUILDERS INC3 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/23/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/25/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/21/2021Pass-Final Fence Non-Directive 14PassView ↗
10/19/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
05/04/2026Fenestration air leakageFAHAD FATEHenergy_progress
05/04/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
05/04/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/04/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/04/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/04/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/04/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
05/04/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/04/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/04/2026Maintenance informationFAHAD FATEHenergy_progress
05/04/2026MeteringFAHAD FATEHenergy_progress
05/04/2026Fenestration areasFAHAD FATEHenergy_progress
03/17/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/17/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/17/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/17/2026Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
03/17/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/17/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/17/2026Heating SystemsFAHAD FATEHspecial
03/17/2026Mechanical SystemsFAHAD FATEHspecial
03/17/2026Post-installed AnchorsFAHAD FATEHspecial
03/17/2026FinalFAHAD FATEHprogress
01/29/2026Heating SystemsFAHAD FATEHspecial
01/29/2026Mechanical SystemsFAHAD FATEHspecial
01/29/2026Post-installed AnchorsFAHAD FATEHspecial
Latest 25 of 97.
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch17
09/01/2026B00515533-I1Request digital key ↗
08/22/2026B01176581-I1Request digital key ↗
08/22/2026B01176579-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00473096-I1Request digital key ↗
08/14/2026B00473096-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00427718-I1Request digital key ↗
09/02/2026B00427718-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00466098-I1Request digital key ↗
08/15/2026B00466098-P1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
12/09/2022322161496Open ↗
12/17/2021340756765Open ↗
11/29/2021340756765Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/01/2021340756765Open ↗
▸BISWORK PERMIT APPLICATION1
12/15/2020340756765Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01032275-P3Open ↗
08/13/2026B01032275-P8Open ↗
08/13/2026B01032275-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026B01032275-I1Open ↗
08/13/2026B01032275-P8Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/24/2021322096263Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/12/2021322096263Open ↗
▸BISVERIFY TAX LOT1
06/27/2022340756765Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/20/2021340756765Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/12/2021322096263Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01032275-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/02/2026B00427718-P1Open ↗
09/02/2026B00427718-I1Open ↗
09/01/2026B00466098-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026B00473096-I1Open ↗
09/02/2026B00473096-I1Open ↗
09/01/2026B01032275-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/20/2026B00427718-P1Open ↗
09/02/2026B00473096-I1Open ↗
09/01/2026B01032275-I1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/21/2020340756765Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/21/2020340756765Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/24/2022340756765Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026B01032275-P8Open ↗
08/13/2026B01032275-I1Open ↗
08/13/2026B01032275-P3Open ↗
▸BISSTREET TREE CHECKLIST1
08/21/2020340756765Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
08/13/2021340756765Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01032275-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01032275-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01032275-I1Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
09/02/2026B00427718-P1Open ↗
09/02/2026B00427718-I1Open ↗
09/01/2026B00466098-I1Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2020340756765Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00473096-I1Open ↗
08/13/2026B00466098-I1Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/11/2020340756765Open ↗
▸BISINTERIOR LIGHTING POWER1
06/16/2022340756765Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/14/2020340756765Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/16/2022340756765Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/16/2022340756765Open ↗
▸BISLIGHTING CONTROLS1
06/16/2022340756765Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/16/2022340756765Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/26/2020340756765Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/13/2026B01032275-P2Open ↗
08/13/2026B01032275-S6Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/16/2022340756765Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/16/2022340756765Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/14/2020340756765Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01032275-S6Open ↗
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION7
12/14/2022322161496Open ↗
12/14/2022322161496Open ↗
12/14/2022322161496Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
12/17/2021340756765Open ↗
11/22/2021340756765Open ↗
09/02/2020340756765Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
08/26/2020340756765Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/29/2021340756765Open ↗
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/08/2020340756765Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION10
12/20/2021340756765Open ↗
12/17/2021340756765Open ↗
12/14/2021340756765Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET2
12/09/2022322161496Open ↗
06/07/2021322096263Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2020340756765Open ↗
▸Other Documents19
▸DOB NOWPlot Diagram5
08/13/2026B01032275-S6Open ↗
08/13/2026B01032275-I1Open ↗
08/13/2026B01032275-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B01032275-P3Open ↗
08/13/2026B01032275-I1Open ↗
08/13/2026B01032275-P8Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01032275-P8Open ↗
08/13/2026B01032275-P3Open ↗
08/13/2026B01032275-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026B01032275-P8Open ↗
08/17/2026B01032275-P3Open ↗
08/17/2026B01032275-I1Open ↗
▸BISPLOT DIAGRAM2
06/24/2021322096263Open ↗
01/20/2021340756765Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
06/24/2021322096263Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/24/2021322096263Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01032275-I1Open ↗