← Back
One family attached or semi-detached
1236 EAST 104 STREET
BROOKLYN · Canarsie · BIN 3233138
💬 Discuss this project
1960Year Built
2Stories
A5Building Class
R3-1Zoning
1,080 sfGross Floor Area
1Units
One family attached or semi-detached · 2,600 sf lot · 0.42 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC112/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272112/29/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
01/02/2026
Permit issued — Solar
B01340050-I1-SL
12/29/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01340050-I1
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/29/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/26/2025
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC01/02/2026
1 project · most recent 04/09/2026
FiledStatusContractorScope
04/09/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 12/29/2025
FiledStatusContractorScope
12/29/2025Signed-offSUNRUN INSTALLATION SVC16 panels, 6.56 kw, 168.18 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/29/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/29/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
12/26/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/26/2025Energy Code Compliance InspectionsWalid Abdullaprogress
12/26/2025FinalWalid Abdullaprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026B01340050-I1Open ↗
08/22/2026B01340050-I1Open ↗
08/22/2026B01340050-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B01340050-I1Open ↗
08/22/2026B01340050-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01340050-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01340050-I1Open ↗