3 Open Violations 1 unresolved · 2 paperwork only▸
DOB04/29/1999WORK WITHOUT A PERMIT. WORK NOTED: FULL PARTITIONS ERECTED AT 1ST FLOOR CREATING 3 RMS, 2RMS USED FOR RELIGIOUS PURPOSES AND THE OTHER FOR SLEEPING/WITH BED & BEDROOM FURNITURE; THERE IS ALSO 3PC BATHROOM, SHOWER, TOILET & SINK, GARAGE DOOR REPLACED W/RESIDENTIAL TYPE DOOR & WINDOW. REMEDY: OBTAIN A PERMIT OR RESTORE PREMISES TO PRIOR LEGAL
ECB04/29/1999WORK WITHOUT A PERMIT WORK NOTED FULL PARTITION ERECTED ST 1ST FL CREATING 3RM 2RMS ARE USED FOR RELIGIOUS PURPOSES AND THE OTHER FOR SLEEPING W/BED AND BEDRM FURNITURE THE E IS ALSO A 3PC BATHRM SHOWER TOILETNothing owed — awaiting certificate of correction
ECB10/20/1993WORK WITHOUT A PERMIT HAVING SEALED THE GARAGE DOOR OPENING WITH MASONRY BRICKS AT FIRST FLOOR FRONT. REMEDY:OBTAIN A PERMIT IF FEASIBLOR RESTORE GARAGE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
Three families · 2,900 sf lot · 1.25 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.