← Back
Two family frame
1239 AVENUE S
BROOKLYN · BIN 3253798
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4-1Zoning
2,520 sfGross Floor Area
2Units
Two family frame · Owner of record: 1239 AVE S, LLC · 1,963 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 22p · 1 filing · 18 docs
Floor 1
Cellar8p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2022$1.5M—Private party → 1239 AVE S, LLC$595/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.109/08/2026
NIC 88 CORP407/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing207/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371407/12/2023
Building Lifecycle
All (40)Filed (5)Permit Issued (4)Signed Off (2)Inspection (5)Special Inspection (24)
09/08/2026
Filed — Alteration
Herewith filing for interior work and facade renovation as per plan. No change in use, egress, or occupancy.
B01456581-I1
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
09/07/2026
Special inspection requirement — Final
Feng Zhang
12/06/2023
Signed off — Alteration
REPLACE EXIST. BOILER. AND INSTALL NEW GAS FURNACE BOILER AND H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764283-I1
12/06/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. REMOVE EXISTING PARTITIONS. NEW STAIR IN CELLAR, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764091-I1
07/20/2023
Permit issued — General Construction
B00764091-I1-GC
07/19/2023
Permit issued — Plumbing
B00764283-I1-PL
07/12/2023
Filed — Alteration
REPLACE EXIST. BOILER. AND INSTALL NEW GAS FURNACE BOILER AND H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764283-P2
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
07/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
06/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/11/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/11/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/09/2023
Filed — Alteration
REPLACE EXIST. BOILER. AND INSTALL NEW GAS FURNACE BOILER AND H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764283-P1
01/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
01/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
07/01/2022
Permit issued — General Construction
B00764091-I1-GC
06/30/2022
Permit issued — Plumbing
B00764283-I1-PL
06/29/2022
Filed — Alteration
REPLACE EXIST. BOILER. AND INSTALL NEW GAS FURNACE BOILER AND H.W.H. IN CELLAR OF THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764283-I1
06/29/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. REMOVE EXISTING PARTITIONS. NEW STAIR IN CELLAR, NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00764091-I1
06/27/2022
Special inspection requirement — Air barrier - visual inspection
Eric Sun
06/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
06/27/2022
Special inspection requirement — Interior lighting power
Eric Sun
06/27/2022
Special inspection requirement — Fenestration areas
Eric Sun
06/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
06/27/2022
Special inspection requirement — Metering
Eric Sun
06/27/2022
Special inspection requirement — Insulation placement and R values
Eric Sun
06/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sun
06/27/2022
Special inspection requirement — Masonry
Eric Sun
06/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
06/27/2022
Special inspection requirement — Fenestration air leakage
Eric Sun
06/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
06/24/2022
Special inspection requirement — Final
Eric Sun
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY07/20/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/19/2023
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY07/01/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/30/2022
1 job · most recent 01/06/2023
General Wiring
FiledStatusContractorScope
01/06/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/08/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
09/08/2026Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
09/08/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
09/08/2026Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
09/07/2026FinalFeng Zhangprogress
07/12/2023Fire-Resistant Penetrations and JointsEric Sunspecial
07/12/2023Energy Code Compliance InspectionsEric Sunprogress
07/12/2023Fire-Resistant Penetrations and JointsEric Sunspecial
07/12/2023Energy Code Compliance InspectionsEric Sunprogress
01/06/2023Fire-Resistant Penetrations and JointsEric Sunspecial
01/06/2023Energy Code Compliance InspectionsEric Sunprogress
06/27/2022Air barrier - visual inspectionEric Sunenergy_progress
06/27/2022Fenestration and door U-factor and product ratingsEric Sunenergy_progress
06/27/2022Interior lighting powerEric Sunenergy_progress
06/27/2022Fenestration areasEric Sunenergy_progress
06/27/2022Energy Code Compliance InspectionsEric Sunprogress
06/27/2022MeteringEric Sunenergy_progress
06/27/2022Insulation placement and R valuesEric Sunenergy_progress
06/27/2022Structural Stability – Alterations of existing buildingsEric Sunspecial
06/27/2022MasonryEric Sunspecial
06/27/2022Fire-Resistant Penetrations and JointsEric Sunspecial
06/27/2022Fenestration air leakageEric Sunenergy_progress
06/27/2022Fire-Resistance Rated ConstructionEric Sunprogress
06/24/2022FinalEric Sunprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/15/2026B01456581-I1Request digital key ↗
08/29/2026B00764091-I1Request digital key ↗
08/29/2026B00764283-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026B00764283-P2Open ↗
08/13/2026B00764283-P1Open ↗
08/13/2026B00764283-I1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/15/2026B01456581-I1Open ↗
08/29/2026B00764091-I1Open ↗
08/29/2026B00764283-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026B00764283-P1Open ↗
08/28/2026B00764283-P2Open ↗
08/28/2026B00764091-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00764283-P1Open ↗
08/28/2026B00764283-P2Open ↗
08/28/2026B00764091-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00764091-I1Open ↗
08/29/2026B00764283-P1Open ↗
08/29/2026B00764283-I1Open ↗
Showing 3 of 4 on file for this type