← Back
BuildNYC
BRONX
1239 EAST 224TH STREET
BRONX · BIN 2131298
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing · 11 docs
Attic1 filing · 11 docs
Floor 31 filing · 11 docs
Floor 21 filing · 11 docs
Floor 11 filing · 11 docs
Cellar1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E207/20/2026
Mei Architect106/02/2026
Building Lifecycle
All (35)Filed (3)Objection (2)Special Inspection (30)
07/29/2026
Objection raised — C/O of existing property requi
07/29/2026
Objection raised — Energy
07/20/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-S2
07/20/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-S1
07/13/2026
Special inspection requirement — Concrete - Cast-In-Place
07/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/13/2026
Special inspection requirement — Subgrade Inspections
07/13/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/13/2026
Special inspection requirement — Final
07/13/2026
Special inspection requirement — Footing and Foundation
07/13/2026
Special inspection requirement — Masonry
07/13/2026
Special inspection requirement — Structural Cold-Formed Steel
07/13/2026
Special inspection requirement — Structural Steel - Details
07/13/2026
Special inspection requirement — Wood – Seismic Resistance
07/13/2026
Special inspection requirement — Final
07/13/2026
Special inspection requirement — Structural Wood Frame
06/02/2026
Filed — New Building
PROPOSED NEW 3-STORY RESIDENCE FOR 3-DWELLING UNITS. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
X01405325-I1
05/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/26/2026
Special inspection requirement — Air barrier — testing
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/26/2026
Special inspection requirement — Insulation placement and R values
05/26/2026
Special inspection requirement — Fenestration air leakage
05/26/2026
Special inspection requirement — Air barrier - visual inspection
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/26/2026
Special inspection requirement — Interior lighting power
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/26/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/26/2026
Special inspection requirement — Maintenance information
05/26/2026
Special inspection requirement — Metering
05/26/2026
Special inspection requirement — Fenestration areas
05/26/2026
Special inspection requirement — Permanent certificate
05/26/2026
Special inspection requirement — Ventilation and air distribution system
05/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 07/20/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026——Heating and Air Conditioning Systems
Heat / Cool
Gree MULTI24HP230V1E0 23,200 BTU · Heat Pump Outdoor ×4
MULTI36HP230V1E0 34,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 07/20/2026
Steel Masonry Wood
FiledStatusContractorScope
07/20/2026——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Excavations - Sheeting, Shoring, and Bracing—special
07/13/2026Subgrade Inspections—special
07/13/2026Subsurface Investigations (Borings/Test Pits)—special
07/13/2026Final—progress
07/13/2026Footing and Foundation—progress
07/13/2026Masonry—special
07/13/2026Structural Cold-Formed Steel—special
07/13/2026Structural Steel - Details—special
07/13/2026Wood – Seismic Resistance—special
07/13/2026Final—progress
07/13/2026Structural Wood Frame—progress
05/26/2026Fire-Resistance Rated Construction—progress
05/26/2026Air barrier — testing —energy_progress
05/26/2026HVAC-R and service water heating equipment—energy_progress
05/26/2026Insulation placement and R values—energy_progress
05/26/2026Fenestration air leakage—energy_progress
05/26/2026Air barrier - visual inspection—energy_progress
05/26/2026HVAC-R and service water heating system controls—energy_progress
05/26/2026Interior lighting power—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/26/2026Duct leakage testing, insulation and design—energy_progress
05/26/2026HVAC-R and service water piping design and insulation—energy_progress
05/26/2026Maintenance information—energy_progress
05/26/2026Metering—energy_progress
Latest 25 of 34.
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026X01405325-S1Request digital key ↗
08/16/2026X01405325-S2Request digital key ↗
08/14/2026X01405325-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026X01405325-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026X01405325-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026X01405325-S1Open ↗
08/16/2026X01405325-I1Open ↗
08/16/2026X01405325-S2Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/16/2026X01405325-S2Open ↗
08/14/2026X01405325-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/14/2026X01405325-I1Open ↗