DOB12/09/2025FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD LARGE VERT CRACK AND MISSING MORTAR AT EXP3. OWNER TO IMMED RETAIN NSYPE TO EVAL THE ENTIRE BLDG PREPARE/FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT. START WORK BY 1/08/2026 COMPLETE/SIGN OFF WORK BY 2/08/2026
HPD12/14/2020§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING 10SQ/FT IN THE BATHROOM LOCATED AT APT 2FLOOR, 2nd STORY
HPD12/14/2020§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN BATHTUB IN THE BATHROOM LOCATED AT APT 2FLOOR, 2nd STORY
Four families · 4,450 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.