← Back
Elevator cooperative
124-10 OCEAN PROMENADE
QUEENS · BIN 4305046
💬 Discuss this project
1962Year Built
6Stories
D4Building Class
R7AZoning
76,595 sfGross Floor Area
68Units
LL97 CoveredRent Stabilized6 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: BEACH 124 APTS INC CO FIRST SERVICERESID ENTIAL · 17,000 sf lot · 4.51 FAR built · Flood zone X500
Locations of Work
Structural
Roof1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NARROWS MANAGEMENT OF BAY RIDGE109/13/2026
HH BUILDING CONSULTING407/08/2026
OWNERS REP403/22/2026
BEACH 124 APTS INC CO FIRST SERVICERESID ENTIAL503/22/2026
BEACH 124 APTS703/22/2026
BEACH 124 ST APTS INC C/O303/22/2026
BEACH 124 APT. INC.503/22/2026
AVARGA CONTRACTING103/22/2026
BEACH 124 STREET APT CORP -C O403/22/2026
125 B 124 OWNERS703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EOC-NY106/30/2026
ASHRAF CORP101/22/2020
BAILEYS ENGINEERING PC108/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
STEEL SYSTEMS LLCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548106/30/2026
Building Lifecycle
All (90)Filed (3)Permit Issued (4)Signed Off (2)Facade (FISP) (14)Violation (60)Special Inspection (7)
06/30/2026
Filed — Alteration
FACADE RESTORATION AS PER PLANS
Q01424336-I1
06/30/2026
Special inspection requirement — Masonry
David Merabyan
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
David Merabyan
06/30/2026
Special inspection requirement — Final
David Merabyan
06/30/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
08/14/2025
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00301189-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/03/2023
Violation issued (HPD, closed)
A
01/19/2023
Cycle 9 facade report submitted
01/19/2023
Cycle 9 facade report signed — SWARMP
01/05/2023
Cycle 9 facade inspection completed
12/22/2022
Violation issued (ECB, closed)
Local Law
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/17/2020
Permit issued — Sidewalk Shed
Q00301189-I1-SH
01/23/2020
Permit issued — Sidewalk Shed
Q00301189-I1-SH
01/22/2020
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00301189-I1
01/16/2020
Cycle 8 facade report signed — SWARMP
01/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/26/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/20/2019
Cycle 8 facade report submitted
11/26/2019
Cycle 8 facade inspection completed
09/25/2019
Violation issued (ECB, closed)
Construction
09/17/2019
Cycle 8 facade report submitted
08/03/2019
Cycle 8 facade inspection completed
06/19/2019
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00074320-I1
12/11/2018
Violation issued (ECB, closed)
Local Law
11/05/2018
Permit issued — Sidewalk Shed
Q00074320-I1-SH
08/31/2018
Permit issued — Sidewalk Shed
Q00074320-I1-SH
08/30/2018
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00074320-I1
08/30/2018
Violation issued (HPD, open)
A
08/30/2018
Violation issued (HPD, open)
A
08/30/2018
Violation issued (HPD, open)
A
08/27/2018
Special inspection requirement — Final
PAUL BAILEY
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/11/2017
Violation issued (ECB, closed)
Construction
09/27/2017
Cycle 8 facade report submitted
09/27/2017
Cycle 8 facade report signed — UNSAFE
09/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/27/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/26/2017
Cycle 8 facade inspection completed
12/20/2016
Violation issued (ECB, closed)
Local Law
12/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
A
08/25/2016
Violation issued (HPD, open)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
08/25/2016
Violation issued (HPD, closed)
B
07/20/2016
Violation issued (HPD, open)
B
07/20/2016
Violation issued (HPD, closed)
C
07/20/2016
Violation issued (HPD, closed)
C
01/08/2016
Violation issued (ECB, closed)
Local Law
09/03/2015
Violation issued (HPD, closed)
B
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC04/17/2020
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC01/23/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC11/05/2018
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/31/2018
BISOTISSUEDPERENNIAL CONTRACTING GRO09/24/2018
BISOTISSUEDDOLMEN CONTRACTING CORP02/23/2016
BISEQISSUEDDOLMEN CONTRACTING CORP01/11/2016
BISOTISSUEDDOLMEN CONTRACTING CORP12/18/2015
BISOTISSUEDDOLMEN CONTRACTING CORP03/25/2015
BISOTISSUEDDOLMEN CONTRACTING CORP04/01/2014
BISOTISSUEDJIMCO RENOVATION CORP10/23/2013
BISOTISSUEDJERRICK ASSOCIATES INC10/21/2013
BISEQISSUEDPHOENIX SUTTON STR INC08/13/2013
BISEQISSUEDPHOENIX SUTTON STR INC05/28/2013
BISOTISSUEDSATO CONSTRUCTION CO.INC04/17/2013
BISPLISSUEDWARD PLUMBING CORP02/27/2013
BISFBISSUEDAGGRESSIVE HEATING INC02/27/2013
BISEQISSUEDPHOENIX BRIDGING INC05/18/2012
BISOTISSUEDSATO CONSTRUCTION CO.INC03/01/2012
BISOTISSUEDSATO CONSTRUCTION CO.INC02/03/2012
BISEQISSUEDPHOENIX BRIDGING INC01/12/2012
BISOTISSUEDSATO CONSTRUCTION CO.INC12/28/2011
BISOTISSUEDBAILY'S CONSTRUCTION CORP02/23/2009
BISPLISSUEDMAYDAY MECHANICAL, INC01/15/2009
BISOTISSUEDMICHAEL LEVY12/23/2008
BISEQISSUEDOUTDOOR INSTALLATION LLC07/13/2006
BISEQISSUEDSPRING SCAFFOLDING INC10/31/2003
BISPLISSUEDJOS FERRIGNO PLG & HTG10/09/1990
BISBLISSUEDSTAR INDUSTRIAL SVC. CO. INC.07/19/1990
BISOTISSUEDN/A06/22/1990
3 projects · most recent 01/20/2020
FiledStatusContractorScope
01/20/2020CompleteTOP SHELF ELECTRIC CORP—
10/23/2019Permit IssuedDORION NORTON ELECL CONT1 meters
08/27/2018CompleteV. VASS ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/30/2026MasonryDavid Merabyanspecial
06/30/2026Tenant Protection Plan Compliance—special
06/30/2026Concrete - Cast-In-PlaceDavid Merabyanspecial
06/30/2026FinalDavid Merabyanprogress
06/30/2026Post-installed AnchorsDavid Merabyanspecial
06/30/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
08/27/2018FinalPAUL BAILEYprogress
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/28/2026Q00074320-I1Request digital key ↗
08/16/2026Q01424336-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00301189-I1Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION20
09/21/2018440510010Open ↗
03/01/2016420511173Open ↗
01/08/2016440280642Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
11/22/2019440510010Open ↗
02/12/2019440510010Open ↗
09/21/2018440510010Open ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
07/29/2019440510010Open ↗
01/27/2017420511173Open ↗
05/31/2013420851224Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/31/2013420851224Open ↗
03/04/2013420817361Open ↗
05/21/2012420570233Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/31/2013420851224Open ↗
03/04/2013420817361Open ↗
05/21/2012420570233Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00301189-I1Open ↗
08/16/2026Q01424336-I1Open ↗
08/13/2026Q00074320-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00074320-I1Open ↗
08/23/2026Q01424336-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01424336-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
03/04/2013420817361Open ↗
11/17/2010410179104Open ↗
10/14/2008410179104Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/04/2013420817361Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/26/2009410179104Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
09/21/2018440510010Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026Q00301189-I1Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/07/2011420511173Open ↗
10/14/2008410179104Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/04/2013420817361Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01424336-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/29/2019440510010Open ↗
03/04/2013420817361Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2018440510010Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/29/2019440510010Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/04/2013420817361Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS6
05/31/2013420851224Open ↗
03/04/2013420817361Open ↗
05/21/2012420570233Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/05/2019440510010Open ↗
07/29/2019440510010Open ↗
02/25/2017420511173Open ↗
▸BISSUPERSEDING LETTER2
04/07/2014420511173Open ↗
02/23/2009410179104Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/04/2013420817361Open ↗
▸BISSHED LETTER1
08/17/2013420851224Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
12/05/2019440510010Open ↗
07/29/2019440510010Open ↗
09/21/2018440510010Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET6
05/31/2013420851224Open ↗
03/04/2013420817361Open ↗
05/21/2012420570233Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
12/05/2019440510010Open ↗
07/29/2019440510010Open ↗
02/12/2019440510010Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/21/2018440510010Open ↗
01/08/2016440280642Open ↗
▸BISADDITIONAL INFORMATION1
01/20/2012420522152Open ↗
▸Other Documents2
▸BISUnknown2
11/20/2019440510010Open ↗
11/20/2019440510010Open ↗