← Back
Two stories - detached, small or mid-size
124-17 116 AVENUE
QUEENS · South Ozone Park · BIN 4252191
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-2Zoning
—Gross Floor Area
1Units
Two stories - detached, small or mid-size · 0.41 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/01/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/06/2026
Permit issued — Solar
Q01389126-I1-SL
05/01/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01389126-I1
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/01/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/17/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/06/2026
BISOTISSUEDSOLTERIX CORPORATION01/05/2017
BISPLISSUEDTRI-CITY WATER INC.09/29/2006
BIS—ISSUEDHUBERT CODRINGTON GENERAL08/25/2006
1 project · most recent 05/01/2026
FiledStatusContractorScope
05/01/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 05/01/2026
FiledStatusContractorScope
05/01/2026Signed-offSUNRUN INSTALLATION SVC12 panels, 4.92 kw, 252.27 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/01/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/01/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/17/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/17/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/17/2026FinalWalid Abdullaprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01389126-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/04/2017440374836Open ↗
▸BISWORK PERMIT APPLICATION1
01/04/2017440374836Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026Q01389126-I1Open ↗
08/29/2026Q01389126-I1Open ↗
08/29/2026Q01389126-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01389126-I1Open ↗
08/29/2026Q01389126-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/04/2017440374836Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/04/2017440374836Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/04/2017440374836Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01389126-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/04/2017440374836Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/04/2017440374836Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01389126-I1Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/16/2018440374836Open ↗
01/04/2017440374836Open ↗
01/04/2017440374836Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION2
03/16/2018440374836Open ↗
01/04/2017440374836Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/16/2018440374836Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/04/2017440374836Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/04/2017440374836Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/16/2018440374836Open ↗
01/04/2017440374836Open ↗
01/04/2017440374836Open ↗
▸BIS2008 CODE TR1 REQUIRED1
01/04/2017440374836Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/16/2018440374836Open ↗
03/16/2018440374836Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2018440374836Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/16/2018440374836Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01389126-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/16/2018440374836Open ↗
01/04/2017440374836Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
01/04/2017440374836Open ↗
01/04/2017440374836Open ↗
01/04/2017440374836Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/04/2017440374836Open ↗