← Back
City residence, one family
124 2 PLACE
BROOKLYN · BIN 3007938
💬 Discuss this project
1920Year Built
4Stories
A4Building Class
R6BZoning
5,000 sfGross Floor Area
1Units
Rent Stabilized10 Open Violations ▸
City residence, one family · Owner of record: ROCK CORE MANAGEMENT LLC · 1,875 sf lot · 2.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof31p · 1 filing · 20 docs
Floor 431p · 1 filing · 20 docs
Floor 331p · 1 filing · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 134p · 1 filing · 20 docs
Cellar32p · 2 filings · 20 docs
Basement31p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BUILD 3602307/08/2026
A D GENERAL CONTRACTORS407/08/2026
GLOBAL DESIGN CONCEPT COR203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2024$7.4M—— → —$1,480/sf building
01/27/2022$3.3M—— → —$655/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE1501/22/2025
FL&M ENGINEERING DESIGN &INSPECTION107/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ATELIER NEW YORK ARCHITECTURE1503/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL DESIGN CONCEPT CORGeneral Contractor907/08/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
A & D GENERAL CONTR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATELIER NY ARCHITECTURE2438901/22/2025
GREYSTONE ENGINEERING CON2973801/22/2025
Building Lifecycle
All (97)Filed (16)Permit Issued (8)Signed Off (3)Violation (16)Inspection (8)Objection (16)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
03/24/2025
Signed off — Alteration
B00692389-I1
03/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2025
Objection resolved — Addressed
02/04/2025
Objection raised — Other
01/22/2025
Filed — Alteration CO
RENOVATION OF MULTI-FAMILY HOME TO CONVERT TO SINGLE FAMILY AND OBTAIN CERTIFICATE OF OCCUPANCY. PARTITION CHANGES, INSTALLATION OF NEW WINDOWS, ROOF DECK, AND BULKHEAD AS PER PLANS.
B00787282-P8
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Hudes
01/22/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kenneth Hudes
01/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Kenneth Hudes
01/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Kenneth Hudes
01/22/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Kenneth Hudes
01/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
01/22/2025
Special inspection requirement — Interior lighting power
Kenneth Hudes
01/22/2025
Special inspection requirement — Exterior lighting power
Kenneth Hudes
01/22/2025
Special inspection requirement — Lighting controls
Kenneth Hudes
01/22/2025
Special inspection requirement — Fenestration air leakage
Kenneth Hudes
01/22/2025
Special inspection requirement — Insulation placement and R values
Kenneth Hudes
01/22/2025
Special inspection requirement — Final
Kenneth Hudes
01/22/2025
Special inspection requirement — Structural Wood Frame
Kenneth Hudes
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenneth Hudes
01/22/2025
Special inspection requirement — Structural Steel - Details
TIMOTHY TWEEDY
01/22/2025
Special inspection requirement — Fenestration areas
Kenneth Hudes
01/22/2025
Special inspection requirement — Air barrier - visual inspection
Kenneth Hudes
01/22/2025
Special inspection requirement — Lighting in dwelling units
Kenneth Hudes
01/13/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2024
Filed — Alteration CO
RENOVATION OF MULTI-FAMILY HOME TO CONVERT TO SINGLE FAMILY AND OBTAIN CERTIFICATE OF OCCUPANCY. PARTITION CHANGES, INSTALLATION OF NEW WINDOWS, ROOF DECK, AND BULKHEAD AS PER PLANS.
B00787282-P7
11/29/2024
Violation issued (HPD, open)
I
11/18/2024
Filed — Alteration CO
RENOVATION OF MULTI-FAMILY HOME TO CONVERT TO SINGLE FAMILY AND OBTAIN CERTIFICATE OF OCCUPANCY. PARTITION CHANGES, INSTALLATION OF NEW WINDOWS, ROOF DECK, AND BULKHEAD AS PER PLANS.
B00787282-P6
11/18/2024
Special inspection requirement — Structural Wood Frame
Kenneth Hudes
11/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
Kenneth Hudes
11/18/2024
Special inspection requirement — Fenestration areas
Kenneth Hudes
11/18/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Hudes
11/18/2024
Special inspection requirement — Final
Kenneth Hudes
11/18/2024
Special inspection requirement — Air barrier - visual inspection
Kenneth Hudes
11/18/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Kenneth Hudes
11/18/2024
Special inspection requirement — Wood – Prefabricated I-Joists
Kenneth Hudes
11/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kenneth Hudes
11/18/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
11/18/2024
Special inspection requirement — Structural Steel - Details
TIMOTHY TWEEDY
11/18/2024
Special inspection requirement — Exterior lighting power
Kenneth Hudes
11/06/2024
Signed off — Alteration
PLUMBING FILED FOR 124 2ND PLACE. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00692399-I1
11/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/18/2024
Filed — Alteration
PLUMBING FILED FOR 124 2ND PLACE. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00692399-P5
08/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/13/2024
Filed — Alteration
PLUMBING FILED FOR 124 2ND PLACE. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00692399-P4
06/07/2024
Permit issued — General Construction
B00787282-I1-GC-CX
05/17/2024
Permit issued — Plumbing
B00692399-I1-PL
04/03/2024
Violation issued (HPD, open)
A
02/07/2024
Filed — Alteration CO
RENOVATION OF MULTI-FAMILY HOME TO CONVERT TO SINGLE FAMILY AND OBTAIN CERTIFICATE OF OCCUPANCY. PARTITION CHANGES, INSTALLATION OF NEW WINDOWS, ROOF DECK, AND BULKHEAD AS PER PLANS.
B00787282-P5
12/18/2023
Signed off — Alteration
B00907135-I1
12/06/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/06/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/22/2023
Violation issued (HPD, open)
I
10/16/2023
Objection resolved — Addressed
10/11/2023
Objection raised — Other
10/10/2023
Filed — Alteration
PLUMBING FILED FOR 124 2ND PLACE. PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B00692399-P3
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGLOBAL DESIGN CONCEPT COR06/07/2024
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC05/17/2024
DOB NOWSupported ScaffoldSigned-offA & D GENERAL CONTR INC07/21/2023
DOB NOWStructuralPermit IssuedGLOBAL DESIGN CONCEPT COR06/05/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC05/11/2023
DOB NOWStructuralPermit IssuedGLOBAL DESIGN CONCEPT COR10/18/2022
DOB NOWGeneral ConstructionSigned-offGLOBAL DESIGN CONCEPT COR05/25/2022
DOB NOWGeneral ConstructionSigned-offGLOBAL DESIGN CONCEPT COR05/23/2022
2 projects · most recent 04/15/2025
General Wiring
FiledStatusContractorScope
04/15/2025CompleteGOODALL ELECTRIC CORP—
11/14/2023CompleteINTELOGIC ELECTRIC, INC.General Wiring
1 project · most recent 01/22/2025
Steel Wood
FiledStatusContractorScope
01/22/2025Permit IssuedGLOBAL DESIGN CONCEPT CORSteel, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
01/22/2025Lighting controlsKenneth Hudesenergy_progress
01/22/2025Fenestration and door U-factor and product ratingsKenneth Hudesenergy_progress
01/22/2025Exterior lighting powerKenneth Hudesenergy_progress
01/22/2025Lighting in dwelling unitsKenneth Hudesenergy_progress
01/22/2025Air barrier - visual inspectionKenneth Hudesenergy_progress
01/22/2025Interior lighting powerKenneth Hudesenergy_progress
01/22/2025Fenestration areasKenneth Hudesenergy_progress
01/22/2025Insulation placement and R valuesKenneth Hudesenergy_progress
01/22/2025Fenestration air leakageKenneth Hudesenergy_progress
01/22/2025Structural Wood FrameKenneth Hudesprogress
01/22/2025Fire-Resistance Rated ConstructionKenneth Hudesprogress
01/22/2025FinalKenneth Hudesprogress
01/22/2025Energy Code Compliance InspectionsKenneth Hudesprogress
01/22/2025Wood – Prefabricated I-JoistsKenneth Hudesspecial
01/22/2025Structural Steel - DetailsTIMOTHY TWEEDYspecial
01/22/2025Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
01/22/2025Fire-Resistant Penetrations and JointsKenneth Hudesspecial
01/22/2025Exterior Insulation and Finish Systems (EIFS)Kenneth Hudesspecial
11/18/2024Exterior Insulation and Finish Systems (EIFS)Kenneth Hudesspecial
11/18/2024Fire-Resistant Penetrations and JointsKenneth Hudesspecial
11/18/2024Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
11/18/2024Structural Steel - DetailsTIMOTHY TWEEDYspecial
11/18/2024Wood – Prefabricated I-JoistsKenneth Hudesspecial
11/18/2024Energy Code Compliance InspectionsKenneth Hudesprogress
11/18/2024FinalKenneth Hudesprogress
Latest 25 of 108.
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/29/2026B00692389-I1Request digital key ↗
08/29/2026B00692399-P3Request digital key ↗
08/29/2026B00692399-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00787282-I1Open ↗
▸Seals & Professional Certifications82
▸DOB NOWProgress Inspector Seal & Signature36
09/23/2026B00787282-P4Open ↗
09/23/2026B00787282-P4Open ↗
09/23/2026B00787282-P4Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/23/2026B00787282-P4Open ↗
09/23/2026B00787282-P4Open ↗
09/23/2026B00787282-P4Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/29/2026B00692389-I1Open ↗
08/29/2026B00692399-P2Open ↗
08/29/2026B00692399-P3Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist8
08/13/2026B00787282-P4Open ↗
08/13/2026B00787282-P3Open ↗
08/13/2026B00787282-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/29/2026B00692389-I1Open ↗
08/29/2026B00692399-P2Open ↗
08/29/2026B00692399-P3Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00692389-I1Open ↗
08/13/2026B00787282-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification8
08/23/2026B00787282-P8Open ↗
08/23/2026B00787282-P7Open ↗
08/23/2026B00787282-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00787282-I1Open ↗