← Back
One family attached or semi-detached
124 CANNON AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5041991
💬 Discuss this project
1955Year Built
2Stories
A5Building Class
R3AZoning
816 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 3,840 sf lot · 0.21 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC102/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272102/20/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
09/03/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01182740-I1
02/26/2025
Permit issued — Solar
S01182740-I1-SL
02/20/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01182740-I1
02/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
02/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
02/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
02/18/2025
Special inspection requirement — Final
Walid Abdulla
02/18/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/08/1990
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC02/26/2025
2 projects · most recent 02/20/2025
FiledStatusContractorScope
02/20/2025CompleteSUNRUN SOLAR ELECTL CORP—
12/13/2021Permit IssuedTRIANGLE ELECTRIC INC.1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/18/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/18/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
02/18/2025Energy Code Compliance InspectionsWalid Abdullaprogress
02/18/2025FinalWalid Abdullaprogress
02/18/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01182740-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01182740-I1Open ↗
08/25/2026S01182740-I1Open ↗
08/25/2026S01182740-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01182740-I1Open ↗
08/25/2026S01182740-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01182740-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01182740-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01182740-I1Open ↗