Miscellaneous educational facility
Success Academy Charter School - NYC 7
124 EAMES PLACE · BIN 2115783
💬 Discuss this project
1959Year Built
3Stories
W9Building Class
R6Zoning
14,155 sfGross Floor Area
1Units
22 Open Violations 14 unresolved · 8 paperwork only ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: EAMES LLC · 14,550 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 2 filings · 20 docs
Floor 3Under Construction34p · 1 filing · 20 docs
Floor 2Under Construction40p · 1 filing · 20 docs
Floor 1Under Construction40p · 1 filing · 20 docs
Sub-BasementUnder Construction38p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAMES4909/14/2026
ACE GROUP NY CORP.903/22/2026
DOE 0 040403/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DEPARTMENT OF EDUCATION P303/22/2026
DOE 040203/22/2026
DEPT OF EDUCATION P.S. 3103/22/2026
DOE PS 307 040103/22/2026
DOE PS 307 ANNEX 040203/22/2026
DEPT. OF EDUCATION P.S.30103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYMS CONSULTING, LLC907/27/2026
IAQ SYSTEMS INC602/04/2026
DI DOMENICO + PARTNERS LLP201/07/2026
VOLUME SPACE CONSULTING INC.207/22/2024
MVN ARCHITECT LLC106/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IAQ SYSTEMS403/21/2026
GREEN STUDIO403/21/2026
W J PROFESSIONAL EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor603/21/2026
R.A.M.S. MECHANICAL INCGeneral Contractor504/09/2026
DUMANI CONSTRUCTION INCGeneral Contractor107/08/2026
FORSYTHE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106707/27/2026
MP ENGINEERS & ARCHITECTS1438201/07/2026
LEO Y LEE ASSOCIATES2481106/13/2024
Building Lifecycle
All (90)Filed (20)Permit Issued (9)Signed Off (1)Violation (60)
07/27/2026
Filed — Alteration
X01323285-P2
07/27/2026
Filed — Alteration
X01323285-S3
07/27/2026
Filed — Alteration
X01323285-P3
07/20/2026
Filed — Alteration
X01323285-P1
03/13/2026
Permit issued — Mechanical Systems
X01323285-S2-MS
03/10/2026
Permit issued — General Construction
X01130125-S2-GC
03/10/2026
Permit issued — Mechanical Systems
X01130125-I1-MS
03/05/2026
Permit issued — Plumbing
X01130125-S1-PL
02/04/2026
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-P5
01/07/2026
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-P4
01/07/2026
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-P3
12/08/2025
Filed — Alteration
X01323285-I1
12/08/2025
Filed — Alteration
X01323285-S1
12/08/2025
Filed — Alteration
X01323285-S2
12/08/2025
Permit issued — Sidewalk Shed
X01323285-S1-SH
12/08/2025
Permit issued — Construction Fence
X01323285-I1-FN
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Filed — Alteration
PS 886X, INSTALLATION OF +/- 354 LINEAR FEET OF TEMPORARY 8 FEET HIGH CHAIN LINK FENCE SUBMITTING ON BEHALF OF THE CONTRACTOR IN CONJUNCTION WITH DOB # X01130125. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01312388-I1
11/13/2025
Filed — Alteration
PS 886X, INSTALLATION OF +/- 354 LINEAR FEET OF TEMPORARY 8 FEET HIGH CHAIN LINK FENCE SUBMITTING ON BEHALF OF THE CONTRACTOR IN CONJUNCTION WITH DOB # X01130125. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01312388-S1
11/11/2025
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-P2
11/11/2025
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-P1
10/08/2025
Violation issued (FDNY_ORDER, closed)
10/08/2025
Violation issued (FDNY_ORDER, closed)
10/08/2025
Violation issued (FDNY_ORDER, closed)
10/08/2025
Violation issued (FDNY_ORDER, closed)
07/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2025
Violation issued (ECB, open)
Construction
04/02/2025
Violation issued (ECB, open)
Construction
03/10/2025
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-S2
03/05/2025
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-S1
03/03/2025
Filed — Alteration
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
X01130125-I1
11/04/2024
Violation issued (FDNY_ORDER, closed)
10/04/2024
Signed off — Alteration
Repairs to face brick, replacement of TC, sills and metal coping and pointing. No change in egress, use, zoning or occupancy.
X01065778-I1
07/31/2024
Permit issued — General Construction
X01065778-I1-GC
07/23/2024
Permit issued — Supported Scaffold
X01083827-I1-SF
07/22/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01083827-I1
07/02/2024
Permit issued — Sidewalk Shed
X01074554-I1-SH
07/01/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01074554-I1
06/13/2024
Filed — Alteration
Repairs to face brick, replacement of TC, sills and metal coping and pointing. No change in egress, use, zoning or occupancy.
X01065778-I1
04/05/2024
Violation issued (ECB, open)
Construction
04/05/2024
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2023
Violation issued (ECB, open)
Construction
03/02/2023
Violation issued (ECB, closed)
Construction
03/21/2022
Violation issued (ECB, open)
Construction
03/21/2022
Violation issued (ECB, closed)
Construction
07/29/2021
Violation issued (FDNY_NOV, closed)
06/15/2021
Violation issued (FDNY_NOV, closed)
03/24/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/2021
Violation issued (ECB, open)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
03/09/2021
Violation issued (ECB, closed)
Construction
07/29/2020
Violation issued (FDNY_NOV, closed)
03/27/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC03/13/2026
DOB NOWGeneral ConstructionPermit IssuedR.A.M.S. MECHANICAL INC03/10/2026
DOB NOWMechanical SystemsPermit IssuedR.A.M.S. MECHANICAL INC03/10/2026
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP03/05/2026
DOB NOWSidewalk ShedPermit IssuedR.A.M.S. MECHANICAL INC12/08/2025
DOB NOWConstruction FencePermit IssuedR.A.M.S. MECHANICAL INC12/08/2025
DOB NOWGeneral ConstructionSigned-offDUMANI CONSTRUCTION INC07/31/2024
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP07/23/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP07/02/2024
BISOTISSUEDMSR ELECTRIAL CONSTRUCTIO09/16/2016
BISOTISSUEDGCC CONTRACTING GROUP INC08/02/2013
BISOTISSUEDR.S. WATERPROOFING CORP04/20/2011
BISOTISSUEDF.W. CLARKE ELECTRICAL CO04/12/2011
BISEQISSUEDJ & G GNRL CONTRACT CORP04/11/2011
BISOTISSUEDR.S. WATERPROOFING CORP.03/20/2008
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/06/2008
BISMHISSUEDACS SYSTEM ASSOCIATES INC05/14/2007
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/11/2003
BISPLISSUEDTHEODORE WAGNER PLG. & HTG. CORP12/01/2001
BISSPISSUEDHYDRONIC CONCEPTS NY PLBG04/18/2001
BISMHISSUEDTECOR BUILDERS02/06/2001
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/06/2001
BISOTISSUEDTECOR BUILDERS02/06/2001
BISOTISSUEDTECOR BUILDERS02/06/2001
BISPLISSUEDDMC PLUMBING & HEATING08/18/2000
BISMHISSUEDTECOR BUILDERS07/11/2000
BISOTISSUEDTECOR BUILDERS07/11/2000
BISOTISSUEDTECOR BUILDERS07/11/2000
BISEQISSUEDSPRING ENTERPRIS INC.09/13/1999
BISFBISSUEDDNA PLUMBING CONTR. INC05/02/1994
BISPLISSUEDDNA PLUMBING CONTR. INC05/02/1994
1 project · most recent 02/04/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/04/2026Permit IssuedR.A.M.S. MECHANICAL INCAir Conditioning Systems, Heating Systems
Cooling
Lg LS120HSV% 1 tons · Fan Coil Indoor ×3
LS120HSV5 1 tons · Condensing Unit ×3
Heating
Lochinvar Crest 0751 1,500,000 BTU · Boiler ×6
1 project · most recent 02/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/04/2026Permit IssuedFORSYTHE PLBG & HTG CORPGas, Water/Sanitary
7 projects · most recent 09/18/2026
General Wiring
FiledStatusContractorScope
09/18/2026Permit IssuedPRECISION ELECL CONT CORP—
05/06/2026Permit IssuedAUJLA ELECTRIC CORPGeneral Wiring
09/14/2022Permit IssuedTRU-VAL ELECTRIC CORP.—
09/14/2022Permit IssuedTRU-VAL ELECTRIC CORP.—
09/28/2020Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
10/10/2019CompleteCHARAN ELEC'L ENTERP'S IN—
07/09/2018CompleteLASER ELEC'L CONSTR'G INCGeneral Wiring
3 projects · most recent 11/13/2025
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
11/13/2025——Fence, Sidewalk Shed
07/22/2024Permit IssuedACE GROUP NY CORPScaffold
07/01/2024Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
09/09/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/09/2026Energy Code Compliance InspectionsJAMES WILSONprogress
09/09/2026HVAC-R and service water piping design and insulationJAMES WILSONenergy_progress
09/09/2026Post-installed AnchorsGEORGE GHEBRYALspecial
07/28/2026Post-installed AnchorsGEORGE GHEBRYALspecial
07/28/2026Chimneys and ventsGEORGE GHEBRYALspecial
07/28/2026Mechanical SystemsGEORGE GHEBRYALspecial
07/28/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
07/28/2026FinalGEORGE GHEBRYALprogress
07/28/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/26/2026FinalGEORGE GHEBRYALprogress
06/26/2026Mechanical SystemsGEORGE GHEBRYALspecial
06/26/2026Post-installed AnchorsGEORGE GHEBRYALspecial
06/26/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
06/26/2026Fuel-Oil Storage and Fuel-Oil Piping Systems—special
06/26/2026HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
06/26/2026Chimneys and ventsGEORGE GHEBRYALspecial
01/23/2026MasonryGEORGE GHEBRYALspecial
01/23/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/23/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/23/2026FinalGEORGE GHEBRYALprogress
01/20/2026Maintenance informationJAMES WILSONenergy_progress
01/20/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
01/20/2026Post-installed AnchorsGEORGE GHEBRYALspecial
01/20/2026Mechanical SystemsJAMES WILSONspecial
Latest 25 of 66.
▾Documents — 142 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/21/2026X01065778-I1Request digital key ↗
08/21/2026X01074554-I1Request digital key ↗
08/21/2026X01083827-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
08/01/2013240032013Open ↗
04/21/2011220113446Open ↗
04/11/2011220112651Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/01/2013240032013Open ↗
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications76
▸DOB NOWProgress Inspector Seal & Signature24
09/27/2026X01130125-S1Open ↗
09/27/2026X01130125-S1Open ↗
09/23/2026X01323285-P3Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/17/2026X01323285-P3Open ↗
08/17/2026X01323285-P2Open ↗
08/17/2026X01323285-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/27/2026X01130125-S1Open ↗
09/23/2026X01323285-P3Open ↗
09/23/2026X01323285-P3Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
12/02/2008210033051Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
03/18/2008210040613Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
03/18/2008210040613Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/01/2013240032013Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/01/2013240032013Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/01/2013240032013Open ↗
▸BISPC FULL REPORT1
02/06/2008210033051Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWFDNY: Letter of No Objection4
08/17/2026X01130125-P6Open ↗
08/13/2026X01130125-S1Open ↗
08/13/2026X01130125-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026X01312388-I1Open ↗
08/13/2026X01312388-S1Open ↗
▸Environmental & Asbestos8
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
04/11/2011220112651Open ↗
03/18/2008210040613Open ↗
02/06/2008210033051Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026X01323285-P3Open ↗
08/17/2026X01323285-S2Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/14/2011220113446Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/01/2013240032013Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X01065778-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/01/2013240032013Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/01/2013240032013Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS4
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
03/18/2008210040613Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026X01065778-I1Open ↗
08/13/2026X01130125-S2Open ↗
08/13/2026X01130125-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026X01312388-I1Open ↗
08/13/2026X01312388-S1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/02/2008210033051Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/01/2013240032013Open ↗
08/01/2013240032013Open ↗
04/14/2011220113446Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
04/14/2011220113446Open ↗
04/11/2011220112651Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/01/2013240032013Open ↗
▸Other Documents2
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal2
08/13/2026X01312388-S1Open ↗
08/13/2026X01312388-I1Open ↗