ECB09/19/2025WORK WITH A PERMIT. AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3(BACK) VERTICAL AND HORIZONTAL ADDITION ATTACHED APROX.10'WX8'DX10'H FOUNDATION OF CMU BLOCKS AND CRAWL SPACE, WOOD JOISTS, WOOD STUDS AND PLYWOOD$3K due
Two family frame · 2,000 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.