DOB07/27/2026CORRECTIVE ACTION PLAN REQ'D-OBSVD CRACKED AND BULGING SECTION OF EXTERIOR WALL AT EXP2, STUCCO WA;; APROX 12FT BY 12FT AREA, ADDITION WALL CRACK ABOVE SMALL WINDOW ON 1FL. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STAND WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN
HPD05/04/2026(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
DOB08/16/1993V-DOB VIOLATION - ACTIVE
ECB06/25/2026ELECTRICAL WORK WITHOUT A PERMIT AT TIME OF INSPECTION OBSERVED FOUR A.C SPLIT UNITS INSTALLED WITH ELECTRICAL DISCONNECT BOXES TO PROVIDE POWER TO THE UNITS AT THE REAR YARD., OBTAIN PERMITNothing owed — awaiting certificate of correction
Five to six families · 1.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.