Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 2 filings · 9 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction
Renewal for CD5 application SR 23/1686
On file for this project
3 documents · 1 drawing sheet
INSTALL (1) NEW 7/10 GAGE STAINLESS STEEL CHIMNEY LINER IN EXISTING VAN PACKER CONCRETE CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
6 documents
PenthouseUnit PHC2p · 1 filing · 6 docs
Mechanical
Issued Permit Scope
Mechanical Systems
REPLACEMENT OF HVAC MECHANICAL SPLIT SYSTEM. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
6 documents
Floor 21Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 20Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 19Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 18Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 17
Floor 16
Floor 15Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 14
Floor 13
Floor 12Partition and door installation, cabinet replacement1 filing · 4 docs
INSTALLATION OF PARTITION AND DOORS. CABINET REPLACEMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
Floor 11
Floor 10Unit 10BCD1 filing · 4 docs
INTERIOR RENOVATION. MERGING 10B WITH PART OF 10C AND 10C WITH 10D IN ACCORDANCE WITH NYC DOB TPPN #3/97.
On file for this project
4 documents · 12 drawing sheets
Floor 91 filing
Structural
Issued Permit Scope
Structural
Project M08026231Permit Issued · 12/23/2022
Cold formed steel supports for fire shutter supports and loads imposed review of exist structure for new equipment on 7C/8M - 8C/9M. No change in use, egress, or occupancy.
Floor 8Mount Sinai Health System, Marketing floor 936p · 3 filings · 19 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Structural
Project M08026231Permit Issued · 12/23/2022
Cold formed steel supports for fire shutter supports and loads imposed review of exist structure for new equipment on 7C/8M - 8C/9M. No change in use, egress, or occupancy.
Herewith filing for plumbing modifications on the 7th floor (8th floor Marketing) and 8th floor (9th floor Marketing) to remove 3 sinks, 1 water closet, 1 lavatory, and provide 3 new sinks. No change in use, egress, or occupancy
On file for this project
6 documents
HEREWITH FILING FOR GENERAL CONSTRUCTION MODIFICATIONS FOR ONCOLOGY EXPANSION ON THE 8TH FLOOR (9th FLOOR MARKETING). NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
Floor 7Mount Sinai Health System, Marketing floor 838p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Project M08026231Permit Issued · 12/23/2022
Cold formed steel supports for fire shutter supports and loads imposed review of exist structure for new equipment on 7C/8M - 8C/9M. No change in use, egress, or occupancy.
Expand existing onsite testing Lab by adding adjacent existing soiled utility and toilet rooms convert exam rooms 2, 7&8 to private infusion rooms renovate exam room 1 and shared team room to 4 infusions cubicles convert check out area to 3 nurse stations
On file for this project
10 documents · 1 drawing sheet
Herewith filing for mechanical modifications on the 7th floor (8th floor marketing) of Mount Sinai West infusion center. No change in use, egress, or occupancy.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 6Mount Sinai Health System37p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
Mount Sinai - CV Starr Hand and Extremities - Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Mount Sinai - CV Starr Hand and Extremities - Installation of Temporary Sprinkler Loop as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Mount Sinai - CV Starr Hand & Extremities - Mechanical modifications including installation of equipment to the 3rd floor roof set back as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
33 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 5
Floor 4
Floor 3Mount Sinai Health System15p · 1 filing · 20 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mount Sinai - CV Starr Hand & Extremities - Mechanical modifications including installation of equipment to the 3rd floor roof set back as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
33 documents
Floor 2Smoke and carbon monoxide detector installation1p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Garage floor topping slab patching and waterproofing as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
Floor 1Smoke and carbon monoxide detector installation1p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Garage floor topping slab patching and waterproofing as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
CellarRetrofit burners and upgrade fuel oil13p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing
RETROFIT (2) EXISTING BURNERS AND UPGRADE LIMITATION. CHANGE GRADE OF FUEL OIL FROM #4 TO #2. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
35 documents · 3 drawing sheets
INSTALL (1) NEW 7/10 GAGE STAINLESS STEEL CHIMNEY LINER IN EXISTING VAN PACKER CONCRETE CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
BasementSmoke and carbon monoxide detector installation1p · 1 filing · 3 docs
Architecture
Garage floor topping slab patching and waterproofing as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Sub-BasementSmoke and carbon monoxide detector installation1p · 1 filing · 3 docs
Architecture
Issued Permit Scope
General Construction
Garage floor topping slab patching and waterproofing as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
Site & exteriorMount Sinai Health System28p · 4 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sidewalk Shed · Supported Scaffold
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents · 8 drawing sheets
Masonry facade work as per plans including facade repairs and the removal and reinstallation of brick and flashing to address leaks at assorted locations. Provide probes in accordance with FISP requirements. No change to use, egress, or occupancy.
On file for this project
6 documents · 4 drawing sheets
Mount Sinai - CV Starr Hand & Extremities - Mechanical modifications including installation of equipment to the 3rd floor roof set back as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
33 documents · 12 drawing sheets
Latest 3 of 4 filings on this floor.