← Back
Three families
124 WEST WASHINGTON PLCE
MANHATTAN · BIN 1010207
💬 Discuss this project
1834Year Built
3Stories
C0Building Class
R6Zoning
3,520 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸
Three families · 1,145 sf lot · 3.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction18p · 1 filing · 20 docs
Floor 3Under Construction15p · 1 filing · 20 docs
Floor 2Under Construction15p · 1 filing · 20 docs
Floor 1Under Construction15p · 1 filing · 20 docs
CellarUnder Construction29p · 1 filing · 20 docs
BasementUnder Construction25p · 1 filing · 20 docs
Sub-BasementUnder Construction1p · 1 filing · 20 docs
1 job · most recent 03/26/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2025Permit Issued360 GENERAL CONTRACTING IHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2-U1 36,000 BTU · Condensing Unit ×3
MXZ-SM72TAM-U1 69,000 BTU · Condensing Unit ×1
1 job · most recent 03/26/2025
Sprinkler System
FiledStatusContractorScope
03/26/2025Permit IssuedJEM FIRE PREVENTION INCSprinkler System
1 job · most recent 03/26/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/26/2025Permit IssuedW.R. PLBG AND HTG CORPGas, Storm, Water/Sanitary
1 job · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025Permit IssuedY ELECTRIC INCGeneral Wiring
1 job · most recent 03/26/2025
Steel Masonry Wood
FiledStatusContractorScope
03/26/2025Permit Issued360 GENERAL CONTRACTING ISteel, Masonry, Wood
Building Lifecycle
All (73)Filed (5)Permit Issued (11)Violation (11)Inspection (7)Objection (26)Special Inspection (13)
07/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/16/2026
Permit issued — Structural
M01087058-S3-ST
06/16/2026
Permit issued — General Construction
M01087058-I1-GC
06/16/2026
Permit issued — Mechanical Systems
M01087058-S2-MS
04/29/2026
Violation issued (HPD, open)
A
04/28/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/11/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/10/2025
Permit issued — Sprinklers
M01087058-S1-EW-SP
10/24/2025
Permit issued — Sprinklers
M01087058-S1-PL
10/13/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/26/2025
Permit issued — Plumbing
M01087058-S1-EW-SP
08/11/2025
Permit issued — Plumbing
M01087058-S1-PL
07/24/2025
Permit issued — Mechanical Systems
M01087058-S2-MS
07/23/2025
Permit issued — Foundation
M01087058-S4-FO
07/23/2025
Permit issued — Structural
M01087058-S3-ST
07/21/2025
Permit issued — General Construction
M01087058-I1-GC
06/04/2025
Violation issued (HPD, closed)
A
05/07/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/29/2025
Objection raised — Zoning
04/29/2025
Objection resolved — Addressed
04/29/2025
Objection raised — Admin
04/29/2025
Objection resolved — Addressed
04/24/2025
Objection raised — Cost
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/22/2025
Objection resolved — Addressed
04/10/2025
Objection resolved — Addressed
04/09/2025
Objection raised — Structural
04/09/2025
Objection raised — Structural
04/08/2025
Objection raised — Admin
04/08/2025
Objection raised — Admin
04/08/2025
Objection raised — Structural
04/08/2025
Objection raised — Structural
04/07/2025
Objection resolved — Addressed
04/07/2025
Objection resolved — Addressed
04/02/2025
Objection raised — Scope
04/02/2025
Objection raised — Scope
04/02/2025
Objection raised — Zoning
04/02/2025
Objection raised — Admin
03/26/2025
Filed — Alteration CO
Mechanical work file in conjunction with change of use from multiple family to a single family .
M01087058-S1
03/26/2025
Filed — Alteration CO
Mechanical work file in conjunction with change of use from multiple family to a single family .
M01087058-S4
03/26/2025
Filed — Alteration CO
Mechanical work file in conjunction with change of use from multiple family to a single family .
M01087058-S2
03/26/2025
Filed — Alteration CO
Mechanical work file in conjunction with change of use from multiple family to a single family .
M01087058-S3
03/24/2025
Filed — Alteration CO
Mechanical work file in conjunction with change of use from multiple family to a single family .
M01087058-I1
03/20/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
XIU CHEN
03/20/2025
Special inspection requirement — Structural Steel - Details
XIU CHEN
03/13/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIU CHEN
03/13/2025
Special inspection requirement — Concrete - Cast-In-Place
XIU CHEN
11/22/2024
Violation issued (HPD, closed)
I
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
08/07/2024
Special inspection requirement — Final
XIU CHEN
08/07/2024
Special inspection requirement — Footing and Foundation
XIU CHEN
08/01/2024
Special inspection requirement — Final
XIU CHEN
Latest 60 of 73 events.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2023$6.8M—Private party → Private party$1,920/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALL CITY ENGINEERING PC203/26/2025
CX CONSULTING CORP203/26/2025
STUART BASSECHES ARCHITECT PLLC103/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AGOUTI CONSTRUCTION CONSULTING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
360 GENERAL CONTRACTING IGeneral Contractor1507/08/2026
JEM FIRE PREVENTION INCFire Protection207/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
W.R. PLBG AND HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JD ENGINEERING PC9859203/26/2025
XC ENGINEERING PC9405303/26/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit Issued360 GENERAL CONTRACTING I06/16/2026
DOB NOWGeneral ConstructionPermit Issued360 GENERAL CONTRACTING I06/16/2026
DOB NOWMechanical SystemsPermit Issued360 GENERAL CONTRACTING I06/16/2026
DOB NOWSprinklersPermit IssuedJEM FIRE PREVENTION INC11/10/2025
DOB NOWSprinklersPermit IssuedW.R. PLBG AND HTG CORP10/24/2025
DOB NOWPlumbingPermit IssuedJEM FIRE PREVENTION INC08/26/2025
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC08/11/2025
DOB NOWMechanical SystemsPermit Issued360 GENERAL CONTRACTING I07/24/2025
DOB NOWFoundationPermit Issued360 GENERAL CONTRACTING I07/23/2025
DOB NOWStructuralPermit Issued360 GENERAL CONTRACTING I07/23/2025
DOB NOWGeneral ConstructionPermit Issued360 GENERAL CONTRACTING I07/21/2025
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2026Fail-Final CND-Occupancy InspectionFailView ↗
03/11/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/20/2025Construction Utilizing CLT or SCL, Type IVXIU CHENspecial
03/20/2025Structural Steel - DetailsXIU CHENspecial
03/13/2025Excavations - Sheeting, Shoring, and BracingXIU CHENspecial
03/13/2025Concrete - Cast-In-PlaceXIU CHENspecial
08/07/2024Fire-Resistant Penetrations and JointsXIU CHENspecial
08/07/2024FinalXIU CHENprogress
08/07/2024Footing and FoundationXIU CHENprogress
08/01/2024FinalXIU CHENprogress
08/01/2024MasonryXIU CHENspecial
08/01/2024Post-installed AnchorsXIU CHENspecial
08/01/2024Structural Cold-Formed SteelXIU CHENspecial
08/01/2024Structural Steel - High Strength BoltingXIU CHENspecial
08/01/2024Structural Steel - WeldingXIU CHENspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026M01087058-S2Request digital key ↗
08/24/2026M01087058-S1Request digital key ↗
08/24/2026M01087058-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026M01087058-I1Open ↗
08/13/2026M01087058-S1Open ↗
08/13/2026M01087058-S3Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026M01087058-S3Open ↗
08/24/2026M01087058-S2Open ↗
08/24/2026M01087058-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026M01087058-S3Open ↗
08/27/2026M01087058-S4Open ↗
08/22/2026M01087058-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M01087058-S3Open ↗
08/27/2026M01087058-S4Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026M01087058-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/24/2026M01087058-S1Open ↗
08/24/2026M01087058-I1Open ↗
08/24/2026M01087058-S4Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification1
08/24/2026M01087058-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01087058-I1Open ↗