← Back
Over six families without stores
1240 GATES AVENUE
BROOKLYN · Bushwick (East) · BIN 3326145
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
123,800 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized11 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: BUSHWICK GARDENS · 139,050 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Cellar44p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PENNROSE3408/28/2026
HOPE GARDENS I503/22/2026
NYC HOUSING AUTHORITY203/21/2026
NYCHA103/21/2026
NEW YORK CITY HOUSING AUTHORITY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CAMERON ENGINEERING1104/06/2026
IMEG Consulting Corp.101/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MILLER PLBG & HTG INCPlumbing507/08/2026
PROCIDA CONSTRUCTION CORP.General Contractor307/08/2026
?JOHN SR MARIElectrical103/21/2026
MODERN TREND ELECL CONTRGElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061404/06/2026
Building Lifecycle
All (112)Filed (12)Permit Issued (8)Signed Off (1)Violation (49)Inspection (12)Special Inspection (30)
08/05/2026
Signed off — Alteration
RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00980288-I1
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, open)
C
06/05/2026
Violation issued (HPD, open)
C
06/05/2026
Violation issued (HPD, closed)
B
05/27/2026
Violation issued (HPD, closed)
C
05/26/2026
Violation issued (HPD, closed)
B
05/05/2026
Permit issued — Plumbing
B00961342-S1-PL
04/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
04/07/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
04/06/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961342-P8
04/06/2026
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Permit issued — Plumbing
B00961342-S1-PL
03/09/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/07/2026
Violation issued (HPD, closed)
B
03/07/2026
Violation issued (HPD, closed)
B
03/07/2026
Violation issued (HPD, closed)
C
03/07/2026
Violation issued (HPD, closed)
A
03/07/2026
Violation issued (HPD, closed)
A
03/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/17/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961342-P7
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961342-P6
12/11/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
12/09/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
12/01/2025
Violation issued (HPD, closed)
C
11/25/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2025
Violation issued (HPD, closed)
A
09/03/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961342-P5
09/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
09/02/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
09/02/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/28/2025
Permit issued — Mechanical Systems
B00961342-I1-MS
08/11/2025
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961342-P4
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
08/08/2025
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
08/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/08/2025
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/16/2025
Permit issued — Foundation
B00980288-I1-GC-CX
05/28/2025
Permit issued — Boiler Equipment
B00961342-S2-BE
04/23/2025
Violation issued (HPD, closed)
B
04/23/2025
Violation issued (HPD, closed)
C
02/27/2025
Special inspection requirement — Final
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — Heating Systems
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
GEORGE GHEBRYAL
02/27/2025
Special inspection requirement — Maintenance information
GEORGE GHEBRYAL
Latest 60 of 112 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC05/05/2026
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC03/12/2026
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.08/28/2025
DOB NOWFoundationSigned-offPROCIDA CONSTRUCTION CORP.07/16/2025
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC05/28/2025
DOB NOWMechanical SystemsPermit IssuedPROCIDA CONSTRUCTION CORP.09/12/2024
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC09/04/2024
DOB NOWPlumbingPermit IssuedMILLER PLBG & HTG INC07/10/2024
BISPLISSUEDPLUMB-IT MECHANICAL INC06/23/2021
BISBLISSUEDPLUMB-IT MECHANICAL INC06/23/2021
BISOTISSUEDBRIGHT POWER INC02/16/2021
BISOTISSUEDPROCIDA CONSTRUCTION CORP.12/14/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.12/14/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.12/14/2020
BISOTISSUEDBRIGHT POWER INSTALLATION07/07/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.05/04/2020
BISMHISSUEDPROCIDA CONSTRUCTION CORP.05/04/2020
BISPLISSUEDA & A PLUMBING SYSTEMS IN03/10/2020
BISBLISSUEDA & A PLUMBING SYSTEMS IN03/10/2020
BISOTISSUEDPROCIDA CONSTRUCTION CORP.10/25/2019
1 project · most recent 04/06/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/06/2026Permit IssuedPROCIDA CONSTRUCTION CORPHeating Systems
Heating
Raypak H7-800B 800,000 BTU · Boiler ×6
1 project · most recent 04/06/2026
FiledStatusContractorScope
04/06/2026——30 heads
1 project · most recent 04/06/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
04/06/2026Permit IssuedMILLER PLBG & HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
5 projects · most recent 02/24/2026
General Wiring
FiledStatusContractorScope
02/24/2026Permit IssuedLAURA ELEC'L LIGHTING &—
06/29/2024Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
01/26/2022CompleteMETROPOLITAN ELEC OF NY I13 meters
08/10/2021CompleteMODERN TREND ELECL CONTRG—
04/22/2020Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 01/18/2024
Steel
FiledStatusContractorScope
01/18/2024Signed-offPROCIDA CONSTRUCTION CORPSteel
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2025Pass-Final PL - UndergroundPassView ↗
11/25/2025Pass-Final PL - UndergroundPassView ↗
10/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/17/2024Certified Gas-Gas-Piping-UndergroundCertifiedView ↗
08/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
04/07/2026Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
04/07/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
04/07/2026Sprinkler SystemsGEORGE GHEBRYALspecial
04/06/2026Sprinkler SystemsGEORGE GHEBRYALspecial
04/06/2026Tenant Protection Plan Compliance—special
04/06/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/09/2025Tenant Protection Plan Compliance—special
12/09/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/09/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/09/2025Sprinkler SystemsGEORGE GHEBRYALspecial
09/02/2025Tenant Protection Plan Compliance—special
09/02/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
09/02/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/02/2025Sprinkler SystemsGEORGE GHEBRYALspecial
08/08/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
08/08/2025Sprinkler SystemsGEORGE GHEBRYALspecial
08/08/2025Tenant Protection Plan Compliance—special
08/08/2025Post-installed AnchorsGEORGE GHEBRYALspecial
02/27/2025FinalGEORGE GHEBRYALprogress
02/27/2025Mechanical SystemsGEORGE GHEBRYALspecial
02/27/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
02/27/2025Heating SystemsGEORGE GHEBRYALspecial
02/27/2025Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
02/27/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
02/27/2025Maintenance informationGEORGE GHEBRYALenergy_progress
Latest 25 of 35.
▾Documents — 169 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026B00980288-I1Request digital key ↗
08/19/2026B00961342-P4Request digital key ↗
08/19/2026B00961342-S2Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION15
11/30/2021321072539Open ↗
06/08/2021321072539Open ↗
06/04/2021321072539Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
06/24/2021321072539Open ↗
06/24/2021321072539Open ↗
02/19/2021340742637Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/26/2026B00980288-I1Open ↗
08/19/2026B00961342-P4Open ↗
08/19/2026B00961342-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00961342-S2Open ↗
09/01/2026B00961342-P5Open ↗
08/28/2026B00961342-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
06/26/2019321072539Open ↗
06/26/2019321072539Open ↗
05/08/2019321072539Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026B00961342-S2Open ↗
08/28/2026B00961342-I1Open ↗
08/28/2026B00961342-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/06/2020340742637Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/06/2020340742637Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/06/2020340742637Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING2
11/30/2021321072539Open ↗
03/17/2021321072539Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/26/2019321072539Open ↗
05/08/2019321072539Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/24/2022321072539Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/24/2022321072539Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/17/2021321072539Open ↗
▸BISSPRINKLER SYSTEMS1
01/24/2022321072539Open ↗
▸BISHEATING SYSTEMS1
01/24/2022321072539Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/08/2019321072539Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
12/20/2019322026758Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
07/06/2020340742637Open ↗
05/08/2019321072539Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/19/2026B00961342-P3Open ↗
08/19/2026B00961342-P2Open ↗
08/19/2026B00961342-P1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
07/06/2020340742637Open ↗
10/26/2019321072539Open ↗
10/26/2019321072539Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/26/2019321072539Open ↗
06/26/2019321072539Open ↗
05/08/2019321072539Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/17/2022340742637Open ↗
01/24/2022321072539Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
03/17/2022340742637Open ↗
01/24/2022321072539Open ↗
▸BISINTERIOR LIGHTING POWER1
01/24/2022321072539Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/24/2022321072539Open ↗
▸BISFENESTRATION AREAS1
01/24/2022321072539Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/06/2020340742637Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/24/2022321072539Open ↗
▸BISELECTRIC MOTORS1
01/24/2022321072539Open ↗
▸BISLIGHTING CONTROLS1
01/24/2022321072539Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/24/2022321072539Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/24/2022321072539Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/06/2020340742637Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
01/24/2022321072539Open ↗
▸BISEXTERIOR LIGHTING POWER1
01/24/2022321072539Open ↗
▸BISFENESTRATION AIR LEAKAGE1
01/24/2022321072539Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/17/2022340742637Open ↗
01/31/2022321072539Open ↗
01/31/2022321072539Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/24/2022321072539Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/24/2022321072539Open ↗
▸BISMECHANICAL SYSTEMS1
01/24/2022321072539Open ↗
▸BISHIGH TEMPERATURE HOT WATER PIPING (WELDING)1
01/24/2022321072539Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/24/2022321072539Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00980288-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00980288-I1Open ↗
▸Approvals, Objections & Sign-offs21
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/13/2026B00961342-S2Open ↗
08/13/2026B00961342-I1Open ↗
08/13/2026B00961342-P1Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER3
06/24/2021321072539Open ↗
06/24/2021321072539Open ↗
02/19/2021340742637Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/06/2022321072539Open ↗
03/21/2022340742637Open ↗
08/27/2020322026758Open ↗
▸BISFINAL1
01/24/2022321072539Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
06/26/2019321072539Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/08/2019321072539Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
05/06/2021340742637Open ↗
07/06/2020340742637Open ↗
06/26/2019321072539Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
04/05/2022321072539Open ↗
03/17/2022340742637Open ↗
08/27/2020322026758Open ↗
▸Filing & Intake Forms14
▸BISADDITIONAL INFORMATION7
01/25/2022321072539Open ↗
01/25/2022321072539Open ↗
01/25/2022321072539Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
06/24/2021321072539Open ↗
06/24/2021321072539Open ↗
02/21/2020301557107Open ↗
▸BISEFILING COVER SHEET3
05/08/2019321072539Open ↗
05/08/2019321072539Open ↗
12/03/2018322026758Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/06/2020340742637Open ↗
▸Other Documents2
▸BISMAINTENANCE INFORMATION1
01/24/2022321072539Open ↗
▸BISSHUTOFF DAMPERS1
01/24/2022321072539Open ↗