← Back
Public elementary, junior or senior high
P.S. 132 Garret A. Morgan
1241 WASHINGTON AVENUE · Claremont Village-Claremont (East) · BIN 2001619
💬 Discuss this project
1961Year Built
3Stories
W1Building Class
R7-1Zoning
113,250 sfGross Floor Area
1Units
LL97 Covered23 Open Violations 5 unresolved · 18 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 107,000 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
NYC PARKS 0103/22/2026
DEPARTMENT OF EDUCATION1403/22/2026
DOE 040403/22/2026
DEPARTMENT OF EDUCATION 0603/22/2026
DEPT OF EDUCATION PS132603/22/2026
PS 132 DOE703/22/2026
DEPT OF EDUC. PS 132103/22/2026
THE NEW YORK CITY DEPARTM103/22/2026
PS 132 DEPT OF EDUCATION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EXCELSIORENGINEERING SERVICES P.C.302/09/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXCELSIOR ENGINEERING SERVICES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTHONY COMOElectrical103/21/2026
BETANCOURT, JOHNElectrical103/21/2026
CEDOMIR MARAElectrical103/21/2026
DIMARCO, JOSEPHElectrical103/21/2026
GATZONIS, CElectrical103/21/2026
KULWANT DEOLElectrical103/21/2026
LASER ELEC'L CONSTR'G INCElectrical103/22/2026
RYAN JOSEPHElectrical103/21/2026
SMITH, STEPHENElectrical103/21/2026
Building Lifecycle
All (85)Filed (3)Violation (60)Objection (6)Special Inspection (16)
04/15/2026
Objection resolved — Addressed
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/14/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/06/2026
Special inspection requirement — Post-installed Anchors
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/02/2026
Objection raised — Other
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Interior lighting power
Ernst Fleuranvil
03/18/2026
Special inspection requirement — Maintenance information
Ernst Fleuranvil
03/18/2026
Special inspection requirement — Lighting controls
Ernst Fleuranvil
03/02/2026
Special inspection requirement — Post-installed Anchors
02/09/2026
Filed — Alteration
Interior renovation including selective demolition of existing partitions and finishes, installation of a movable glass partition system, replacement of lighting fixtures, new doors, ceilings, flooring, millwork, and related interior finishes.
X01315086-S2
02/05/2026
Special inspection requirement — Structural Steel - Welding
02/05/2026
Special inspection requirement — Structural Steel - Details
02/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/30/2026
Special inspection requirement — Final
11/21/2025
Objection raised — Admin
11/21/2025
Objection raised — Other
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/10/2025
Filed — Alteration
Interior renovation including selective demolition of existing partitions and finishes, installation of a movable glass partition system, replacement of lighting fixtures, new doors, ceilings, flooring, millwork, and related interior finishes.
X01315086-S1
11/07/2025
Filed — Alteration
Interior renovation including selective demolition of existing partitions and finishes, installation of a movable glass partition system, replacement of lighting fixtures, new doors, ceilings, flooring, millwork, and related interior finishes.
X01315086-I1
10/20/2025
Violation issued (ECB, open)
Boilers
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (ECB, closed)
Construction
08/18/2025
Violation issued (ECB, closed)
Construction
08/05/2024
Violation issued (ECB, closed)
Construction
08/05/2024
Violation issued (ECB, open)
Construction
08/05/2024
Violation issued (ECB, open)
Construction
08/05/2024
Violation issued (ECB, closed)
Construction
08/05/2024
Violation issued (ECB, open)
Construction
08/05/2024
Violation issued (ECB, open)
Construction
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/11/2023
Violation issued (ECB, open)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, open)
Construction
01/11/2023
Violation issued (ECB, open)
Construction
01/11/2023
Violation issued (ECB, open)
Construction
01/11/2023
Violation issued (ECB, open)
Construction
02/22/2022
Violation issued (ECB, open)
Construction
02/22/2022
Violation issued (ECB, open)
Construction
02/22/2022
Violation issued (ECB, open)
Construction
06/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2021
Violation issued (ECB, closed)
Construction
01/29/2021
Violation issued (ECB, open)
Construction
01/29/2021
Violation issued (ECB, open)
Construction
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/23/2018
Violation issued (ECB, closed)
Construction
01/23/2018
Violation issued (ECB, closed)
Construction
04/04/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2017
Violation issued (ECB, closed)
Construction
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/02/2016
BISPLISSUEDEAGLE 1 MECHANICAL, INC02/02/2016
BISOTISSUEDLANMARK GROUP INC10/20/2015
BISOTISSUEDLANMARK GROUP INC10/20/2015
BISOTISSUEDLERCO ELECTRIC LLC07/20/2015
BISSPISSUEDEAGLE MECHANICAL INC07/13/2015
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/28/2015
BISPLISSUEDEAGLE 1 MECHANICAL, INC02/13/2015
BISOTISSUEDLANMARK GROUP INC11/05/2014
BISOTISSUEDLANMARK GROUP INC11/05/2014
BISMHISSUEDCENTENNIAL ELEVATOR INDUS05/29/2014
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/02/2014
BISPLISSUEDEAGLE 1 MECHANICAL, INC02/06/2014
BISOTISSUEDLANMARK GROUP INC11/26/2013
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/28/2013
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/28/2013
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/28/2013
BISMHISSUEDMIDTOWN HVAC ENTERPRISES05/03/2013
BISPLISSUEDEAGLE 1 MECHANICAL, INC01/22/2013
BISMHISSUEDCENTENNIAL ELEVATOR INDUS12/03/2012
BISOTISSUEDLANMARK GROUP INC11/28/2012
BISEQISSUEDLANMARK GROUP INC11/28/2012
BISOTISSUEDLANMARK GROUP INC11/28/2012
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY09/05/2012
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY09/05/2012
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY09/05/2012
BISOTISSUEDCENTENNIAL ELEVATOR INDUS06/26/2012
BISMHISSUEDMIDTOWN HVAC ENTERPRISES04/30/2012
BISMHISSUEDMIDTOWN HVAC ENTERPRISES04/11/2012
BISPLISSUEDEAGLE 1 MECHANICAL, INC01/30/2012
BISOTISSUEDLANMARK GROUP INC01/30/2012
BISMHISSUEDMIDTOWN HVAC ENTERPRISES01/30/2012
BISOTISSUEDLANMARK GROUP INC01/30/2012
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY01/13/2012
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY01/13/2012
BISEQRE-ISSUEDLANMARK GROUP INC11/28/2011
BISPLISSUEDEAGLE 1 MECHANICAL, INC10/20/2011
BISOTISSUEDCENTENNIAL ELEVATOR INDUS06/17/2011
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY04/05/2011
BISMHISSUEDMIDTOWN HVAC ENTERPRISES02/08/2011
+ 10 more permits on file
1 project · most recent 02/09/2026
Water/Sanitary
FiledStatusContractorScope
02/09/2026——Water/Sanitary
7 projects · most recent 11/14/2024
General Wiring
FiledStatusContractorScope
11/14/2024CompleteANCO ELECTL CONTCTNG INC—
03/20/2024CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
07/29/2022CompleteCHARAN ELEC'L ENTERP'S IN—
01/07/2021CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
11/20/2018CompleteCHARAN ELEC'L ENTERP'S IN—
10/29/2018CompleteLASER ELEC'L CONSTR'G INCGeneral Wiring
05/16/2018CompleteCHARAN ELEC'L ENTERP'S IN—
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/15/2026HVAC-R and service water piping design and insulation—energy_progress
04/13/2026Energy Code Compliance Inspections—progress
04/06/2026Energy Code Compliance Inspections—progress
04/06/2026Fire-Resistant Penetrations and Joints—special
04/06/2026Post-installed Anchors—special
04/06/2026Fire-Resistance Rated Construction—progress
04/02/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Interior lighting powerErnst Fleuranvilenergy_progress
03/18/2026Maintenance informationErnst Fleuranvilenergy_progress
03/18/2026Lighting controlsErnst Fleuranvilenergy_progress
03/02/2026Post-installed Anchors—special
02/05/2026Structural Steel - Welding—special
02/05/2026Structural Steel - Details—special
02/05/2026Structural Steel - High Strength Bolting—special
02/05/2026Fire-Resistant Penetrations and Joints—special
01/30/2026Final—progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026X01315086-I1Request digital key ↗
08/17/2026X01315086-S2Request digital key ↗
08/17/2026X01315086-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026X01315086-S2Open ↗
08/17/2026X01315086-S1Open ↗
08/17/2026X01315086-I1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/17/2026X01315086-S2Open ↗
08/17/2026X01315086-S1Open ↗
08/17/2026X01315086-I1Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/17/2026X01315086-S2Open ↗
08/17/2026X01315086-S1Open ↗
08/17/2026X01315086-I1Open ↗
▸Other Documents7
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal4
08/17/2026X01315086-I1Open ↗
08/17/2026X01315086-S2Open ↗
08/17/2026X01315086-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026X01315086-S1Open ↗
08/13/2026X01315086-S2Open ↗
08/13/2026X01315086-I1Open ↗