ECB05/07/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/18/2025 BY BADGE # 2908, WORK WITHOUT PERMIT; FOR WATER AND WASTE LINES INSTALLED AT CELLAR LEVEL FOR 3-PIECE BATHROOM (TOILET, SINK, TUB), AND RESIDENHearing held — result not yet published$1K proposed
ECB05/07/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/18/2025 BY BADGE # 2908; WORK WITHOUT PERMIT; FOR ADDITIONAL 110-VOLT ELECTRICAL LINES INSTALLED AT CELLAR LEVEL FOR LIGHTS, SWITCHES, OUTLETS. THERE AHearing held — result not yet published$1K proposed
ECB05/07/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/18/2025 BY BADGE # 2908, WORK WITHOUT PERMIT; VARIOUS FULL HEIGHT PARTITIONS WALLS AND DOOR HAS BEEN ERECTED AT CELLAR LEVEL TO CREATE BATHROOM. THEREHearing held — result not yet published$1K proposed
ECB05/07/2026AS PER PREVIOUS REQUEST FOR CORRECTIVE ACTION ISSUED ON 09/18/2025 BY BADGE # 2908, OCCUPANCY CONTRARY; CELLAR LEVEL IS BEING OCCUPIED AS SLEEPING AREA WITH 3-PIECE BATHROOM, & RESIDENTIAL SINK, IN CONJUNCTIONHearing held — result not yet published$1K proposed