← Back
Three families
1242 PUTNAM AVENUE
BROOKLYN · BIN 3077217
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R6Zoning
2,700 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: CROWN JRH, LLC · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 9 docs
Cellar1p · 1 filing · 9 docs
Basement2p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIOLET HOLDINGS1003/22/2026
CROWN JRH, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2025$2.2M—CROWN JRH LLC → Private party$813/sf building
05/16/2023$1.2M—— → —$437/sf building
12/17/2021$308K—Private party → Private party$114/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INGA CONSULTING ENGINEERS212/04/2024
CL ENGINEERING P.C.207/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAVB DESIGN CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor303/21/2026
INFINITI ELECTRIC CORPElectrical103/22/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781412/04/2024
Building Lifecycle
All (43)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (4)Objection (14)Special Inspection (16)
04/02/2025
Signed off — Alteration
HERWITH FILING FOR THE INSTALLATION OF ALL PLUMBING FIXTURES AS PER PLANS.
B00940525-I1
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
12/13/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
12/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
12/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
12/04/2024
Filed — Alteration
HERWITH FILING FOR THE INSTALLATION OF ALL PLUMBING FIXTURES AS PER PLANS.
B00940525-P1
12/04/2024
Violation issued (HPD, closed)
I
12/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/04/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
12/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/04/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
12/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
12/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
11/08/2024
Signed off — Alteration
FILING INTERIOR RENOVATION OF AN EXISTING 3 FAMILY 3 STORY MASONRY BUILDING WITH BASEMENT & CELLAR. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY
B00917840-I1
09/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
09/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/13/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
09/13/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
09/11/2024
Objection resolved — Addressed
08/19/2024
Objection raised — Zoning
08/13/2024
Objection resolved — Addressed
08/13/2024
Objection resolved — Addressed
08/06/2024
Objection raised — Scope
08/06/2024
Objection raised — Zoning
07/29/2024
Filed — Alteration
FILING INTERIOR RENOVATION OF AN EXISTING 3 FAMILY 3 STORY MASONRY BUILDING WITH BASEMENT & CELLAR. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY
B00917840-P1
06/26/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/13/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/28/2023
Permit issued — Plumbing
B00940525-I1-PL
10/24/2023
Filed — Alteration
HERWITH FILING FOR THE INSTALLATION OF ALL PLUMBING FIXTURES AS PER PLANS.
B00940525-I1
09/28/2023
Permit issued — General Construction
B00917840-I1-GC
09/21/2023
Objection resolved — Addressed
09/21/2023
Objection resolved — Addressed
09/21/2023
Objection resolved — Addressed
09/21/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Other
08/21/2023
Objection raised — Scope
08/21/2023
Objection raised — Admin
08/21/2023
Objection raised — Energy
08/15/2023
Filed — Alteration
FILING INTERIOR RENOVATION OF AN EXISTING 3 FAMILY 3 STORY MASONRY BUILDING WITH BASEMENT & CELLAR. NO CHANGE IN USE, EGRESS, BULK, OR OCCUPANCY
B00917840-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN AND S PLUMBING INC11/28/2023
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC09/28/2023
2 projects · most recent 09/25/2025
General Wiring
FiledStatusContractorScope
09/25/2025CompleteINFINITI ELECTRIC CORP4 meters, 3 new_meters
11/11/2024CompleteINFINITI ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/26/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
12/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/13/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/13/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
12/13/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/13/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/13/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/04/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
12/04/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
12/04/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
12/04/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
12/04/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
09/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/13/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/13/2024FinalCHRISTIAN LOZADAprogress
09/13/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00917840-P1Request digital key ↗
08/27/2026B00917840-I1Request digital key ↗
08/26/2026B00940525-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
09/20/2026B00940525-P1Open ↗
09/20/2026B00940525-P1Open ↗
09/17/2026B00940525-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026B00940525-P1Open ↗
08/26/2026B00940525-I1Open ↗
08/13/2026B00917840-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/20/2026B00940525-P1Open ↗
09/17/2026B00940525-I1Open ↗
08/24/2026B00917840-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026B00940525-I1Open ↗
08/26/2026B00940525-P1Open ↗
08/13/2026B00917840-I1Open ↗
Showing 3 of 4 on file for this type