← Back
Two family brick
1244 EDISON AVENUE
BRONX · BIN 2073207
💬 Discuss this project
1960Year Built
2Stories
B1Building Class
R4AZoning
3,010 sfGross Floor Area
2Units
0 Open Violations
Two family brick · 5,150 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2019$845K—Private party → Private party$281/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.108/12/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857108/12/2021
Building Lifecycle
All (24)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Inspection (1)Objection (16)Special Inspection (3)
10/26/2021
Signed off — Alteration
TO RESOLVE ECB VIOLATIONS 35560338K BY MODIFIED THE SIZE OF THE CANOPY AT REAR YARD FOR EX. TWO FAMILY HOUSE WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00575090-I1
10/25/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/12/2021
Permit issued — General Construction
X00575090-I1-GC
09/23/2021
Objection raised — Scope
09/23/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Zoning
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Other
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Structural
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Structural
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Zoning
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Admin
08/31/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Zoning
08/31/2021
Objection resolved — Addressed
08/12/2021
Filed — Alteration
TO RESOLVE ECB VIOLATIONS 35560338K BY MODIFIED THE SIZE OF THE CANOPY AT REAR YARD FOR EX. TWO FAMILY HOUSE WITH GENERAL CONSTRUCTION AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X00575090-I1
08/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
08/11/2021
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
08/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
08/02/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC10/12/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/25/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/11/2021Fire-Resistant Penetrations and JointsQIANG SUspecial
08/11/2021Energy Code Compliance InspectionsQIANG SUprogress
08/11/2021HVAC-R and service water piping design and insulationQIANG SUenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026X00575090-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026X00575090-I1Open ↗
08/25/2026X00575090-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/25/2026X00575090-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026X00575090-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00575090-I1Open ↗