← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1244 NEW YORK AVENUE
BROOKLYN · BIN 3111366
💬 Discuss this project
2022Year Built
6Stories
D1Building Class
R6Zoning
11,982 sfGross Floor Area
16Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1244 New York Ave Residence · 3,588 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler system for new building36p · 4 filings · 20 docs
BulkheadProposed 6 story residential building2p · 2 filings · 6 docs
Floor 6Sprinkler system for new building38p · 4 filings · 20 docs
Floor 5Sprinkler system for new building38p · 4 filings · 20 docs
Floor 4Sprinkler system for new building37p · 4 filings · 20 docs
Floor 3Sprinkler system for new building37p · 4 filings · 20 docs
Floor 2Sprinkler system for new building37p · 4 filings · 20 docs
Floor 1Conc. block garage and curb cut44p · 6 filings · 20 docs
Site & exteriorSprinkler system for new building38p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STY2707/08/2026
1244 New York Ave Residence1103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/13/2022$1.2M—Private party → 1244 NEW YORK AVE RESIDENCE LLC$100/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S. Wieder Architect407/04/2023
FL&M Engineering Design & Inspection110/06/2022
R & S Associates205/25/2022
South Bay Engineering104/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting 4 U1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S & U ManagementGeneral Contractor1307/08/2026
Manhattan D EnterprisesScaffold407/08/2026
S U Managementspecialty_contractor303/21/2026
Plumbing P & HPlumbing207/08/2026
Bruche Mechanical NYFire Protection207/08/2026
Star Electrical ContractorsElectrical103/22/2026
Design N SafetyScaffold107/08/2026
Solas ElectricalElectrical103/22/2026
S & U ManagementScaffold107/08/2026
Shmuel WiederElectrical103/21/2026
Power Direct ElectricElectrical103/21/2026
Bent MechanicalPlumbing108/02/2013
Carribean Sunset ConstructionGeneral Contractor105/04/2011
Design N SafetyGeneral Contractor106/30/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394605/23/2023
Engineering Professional6393106/25/2020
Building Lifecycle
07/23/2026
Elevator Category 1 inspection report filed
12/16/2024
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
10/16/2024
Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed
08/06/2024
Noted: residential building garage being used to store industrial products such as coolers. Products pack in walmart boxes glad garbage bags and a…
ECB violation · closed
07/20/2023
Signed off — Alteration
B00355312-I1
79 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offS & U Management03/14/2023
DOB NOWSprinklersSigned-offBruche Mechanical NY03/03/2023
DOB NOWPlumbingSigned-offPlumbing P & H03/03/2023
DOB NOWMechanical SystemsSigned-offS & U Management11/26/2022
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises10/07/2022
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises10/07/2022
DOB NOWSprinklersSigned-offBruche Mechanical NY09/13/2022
DOB NOWPlumbingSigned-offPlumbing P & H09/13/2022
DOB NOWStructuralSigned-offS & U Management07/26/2022
DOB NOWConstruction FenceSigned-offS & U Management07/21/2022
DOB NOWEarth WorkSigned-offS & U Management06/03/2022
DOB NOWConstruction FenceSigned-offDesign N Safety05/12/2022
BIS—ISSUEDS & U Management08/02/2022
BIS—ISSUEDS & U Management07/29/2022
BIS—ISSUEDDesign N Safety06/30/2022
BISPLISSUEDBent Mechanical08/02/2013
BISOTISSUEDCarribean Sunset Construction05/04/2011
5 projects · most recent 02/26/2024
General Wiring
FiledStatusContractorScope
02/26/2024Permit IssuedPower Direct Electric—
08/01/2023CompleteStar Electrical Contractors—
06/13/2023CompletePower Direct ElectricGeneral Wiring
11/07/2022CompletePower Direct Electric—
09/23/2022CompleteSolas Electrical—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/10/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/26/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/07/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
06/07/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/19/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/01/2023Sprinkler SystemsPaul Raymondspecial
06/01/2023Post-installed AnchorsPaul Raymondspecial
06/01/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/16/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/16/2023Post-installed AnchorsPaul Raymondspecial
05/16/2023Sprinkler SystemsPaul Raymondspecial
03/31/2023Energy Code Compliance InspectionsPaul Raymondprogress
03/31/2023HVAC and service water heating system controls Paul Raymondenergy_progress
03/31/2023HVAC insulation and sealing Paul Raymondenergy_progress
03/31/2023HVAC and service water heating equipment Paul Raymondenergy_progress
03/31/2023Maintenance informationPaul Raymondenergy_progress
03/31/2023Post-installed AnchorsPaul Raymondspecial
03/31/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/19/2022Concrete - Cast-In-PlacePaul Raymondspecial
05/19/2022Subgrade InspectionsPaul Raymondspecial
05/19/2022Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
05/16/2022FinalPaul Raymondprogress
05/16/2022Footing and FoundationPaul Raymondprogress
148 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account