← Back
Two family brick
1247 UNION STREET
BROOKLYN · BIN 3032908
💬 Discuss this project
1899Year Built
2Stories
B1Building Class
R6Zoning
4,014 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 1,968 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof5p · 3 filings · 20 docs
Floor 21p · 1 filing · 18 docs
Floor 1
Cellar1p · 1 filing · 6 docs
Basement2p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIOLET HOLDINGS1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/17/2023$2.7M—CROWN JRH LLC → Private party$675/sf building
09/24/2021$1.4M—Private party → CROWN JRH LLC$336/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ENGINEERING PLLC702/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2260 MAG CORPGeneral Contractor303/21/2026
MAMC CONSULTING REPS LLCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137702/06/2023
Building Lifecycle
All (35)Filed (7)Permit Issued (3)Signed Off (3)Violation (2)Inspection (5)Special Inspection (15)
03/11/2024
Signed off — Alteration
PROVIDE NEW DUCTED HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08030357-I1
08/17/2023
Signed off — Alteration
NEW PLUMBING FIXTURES AT ROOF, REPLACE EXISTING FIXTURES THROUGHOUT
B00638468-I1
02/06/2023
Filed — Alteration
NEW PLUMBING FIXTURES AT ROOF, REPLACE EXISTING FIXTURES THROUGHOUT
B00638468-P3
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
02/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
02/02/2023
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
01/24/2023
Filed — Alteration
PROVIDE NEW DUCTED HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08030357-P1
01/24/2023
Filed — Alteration
NEW PLUMBING FIXTURES AT ROOF, REPLACE EXISTING FIXTURES THROUGHOUT
B00638468-P2
12/01/2022
Permit issued — Mechanical Systems
B08030357-I1-MS
11/29/2022
Filed — Alteration
PROVIDE NEW DUCTED HVAC SYSTEM AND KITCHEN/BATHROOM EXHAUSTS
B08030357-I1
10/19/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 2-FAMILY DWELLING.
B00602656-I1
10/05/2022
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
09/23/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2022
Filed — Alteration
NEW PLUMBING FIXTURES AT ROOF, REPLACE EXISTING FIXTURES THROUGHOUT
B00638468-P1
08/30/2022
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
08/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
03/07/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/07/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/07/2022
Permit issued — Plumbing
B00638468-I1-PL
12/10/2021
Filed — Alteration
NEW PLUMBING FIXTURES AT ROOF, REPLACE EXISTING FIXTURES THROUGHOUT
B00638468-I1
11/13/2021
Permit issued — General Construction
B00602656-I1-GC
11/10/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2-FAMILY DWELLING.
B00602656-I1
11/04/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
11/04/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
11/04/2021
Special inspection requirement — Fenestration areas
SHAHIN BADALY
11/04/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHIN BADALY
11/04/2021
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
11/04/2021
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
11/04/2021
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
11/04/2021
Special inspection requirement — Fenestration air leakage
SHAHIN BADALY
09/29/2021
Special inspection requirement — Final
SHAHIN BADALY
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMAMC CONSULTING REPS LLC12/01/2022
DOB NOWPlumbingSigned-offPLBG P & H INC01/07/2022
DOB NOWGeneral ConstructionSigned-off2260 MAG CORP11/13/2021
1 project · most recent 12/28/2021
General Wiring
FiledStatusContractorScope
12/28/2021CompleteBLZ ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/05/2022No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
03/07/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
02/06/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
02/06/2023Energy Code Compliance InspectionsSHAHIN BADALYprogress
02/02/2023Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
02/02/2023Energy Code Compliance InspectionsSHAHIN BADALYprogress
08/30/2022Energy Code Compliance InspectionsSHAHIN BADALYprogress
08/30/2022Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
11/04/2021Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
11/04/2021Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
11/04/2021Fenestration areasSHAHIN BADALYenergy_progress
11/04/2021Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
11/04/2021Energy Code Compliance InspectionsSHAHIN BADALYprogress
11/04/2021Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
11/04/2021Insulation placement and R valuesSHAHIN BADALYenergy_progress
11/04/2021Fenestration air leakageSHAHIN BADALYenergy_progress
09/29/2021FinalSHAHIN BADALYprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00602656-I1Request digital key ↗
08/31/2026B00638468-P2Request digital key ↗
08/31/2026B00638468-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026B00638468-P3Open ↗
08/29/2026B00638468-P1Open ↗
08/26/2026B00602656-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00602656-I1Open ↗
08/31/2026B00638468-P2Open ↗
08/31/2026B00638468-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00638468-P3Open ↗
08/29/2026B00638468-P1Open ↗
08/26/2026B00602656-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00602656-I1Open ↗
08/31/2026B00638468-P2Open ↗
08/31/2026B00638468-P3Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/31/2026B00602656-I1Open ↗