← Back
BuildNYC
Two family frame
1249 COLLEGE AVENUE
BRONX · BIN 2002431
💬 Discuss this project
1905Year Built
2Stories
B2Building Class
R7-1Zoning
2,210 sfGross Floor Area
2Units
Rent Stabilized9 Active Violations ▸
Two family frame · 1,700 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarCellar mechanical work7p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Technemotion Design307/26/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rafalex ContractingGeneral Contractor207/08/2026
Jada Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616307/26/2021
Building Lifecycle
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · open
07/31/2025
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING IN THE BATHROOM LOCATED AT APT…
HPD violation · closed
07/31/2025
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · open
07/31/2025
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH…
HPD violation · open
07/31/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM…
HPD violation · open
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRafalex Contracting03/30/2022
DOB NOWPlumbingSigned-offJada Plumbing & Heating03/18/2022
DOB NOWGeneral ConstructionSigned-offRafalex Contracting02/25/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/23/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
06/07/2021Shutoff dampersFAHAD FATEHenergy_progress
06/07/2021Mechanical SystemsFAHAD FATEHspecial
06/07/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/07/2021FinalFAHAD FATEHprogress
06/07/2021Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
06/07/2021Ventilation and air distribution systemFAHAD FATEHenergy_progress
04/28/2021Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/28/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/20/2021FinalFAHAD FATEHprogress
04/20/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/20/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
04/20/2021HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account