Two family frame
125-09 133RD AVENUE
QUEENS · South Ozone Park · BIN 4620814
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3-2Zoning
2,080 sfGross Floor Area
2Units
Two family frame · Owner of record: Khera · 3,000 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed Plumbing Work, 1st Floor14p · 2 filings · 20 docs
Floor 1Proposed Plumbing Work, 1st Floor17p · 3 filings · 20 docs
CellarProposed Plumbing Work, 1st Floor15p · 2 filings · 20 docs
Site & exteriorProposed Plumbing Work, 1st Floor14p · 3 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Group Enterprises304/17/2023
Tabriz Design Group504/04/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Satgur ConstructionGeneral Contractor903/21/2026
Satgur Constructionspecialty_contractor707/08/2026
Satgur ConstructionScaffold207/08/2026
B.M. Khera ConstructionScaffold107/08/2026
Horbridge Plumbing & HeatingPlumbing107/08/2026
Aljer PLG & HeatingPlumbing106/23/1999
Central Home RemodelersGeneral Contractor209/30/1998
Ield ManagementGeneral Contractor105/17/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275604/17/2023
Triangle Inspection & Tes7495204/04/2023
Building Lifecycle
06/08/2023
Signed off — New Building
PROPOSED NEW TWO STORY AND CELLAR TWO FAMILY BUILDING
Q00580709-S1
06/01/2023
Signed off — Alteration
10' CURB CUT.
Q00581203-I1
05/25/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION #Q00580709
Q00581232-I1
05/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
53 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSatgur Construction03/31/2022
DOB NOWMechanical SystemsSigned-offSatgur Construction03/28/2022
DOB NOWEarth WorkPermit IssuedSatgur Construction03/28/2022
DOB NOWFoundationPermit IssuedSatgur Construction12/31/2021
DOB NOWMechanical SystemsSigned-offSatgur Construction12/28/2021
BISEQISSUEDSatgur Construction11/04/2021
BIS—ISSUEDSatgur Construction11/04/2021
BISPLISSUEDAljer Plumbing & Heating06/23/1999
BIS—ISSUEDIeld Management05/17/1999
BIS—ISSUEDCentral Home Remodelers09/30/1998
BIS—ISSUEDCentral Home Remodelers08/21/1998
1 project · most recent 04/17/2023
FiledStatusContractorScope
04/17/2023Signed-offSatgur Construction—
1 project · most recent 04/17/2023
Earthwork
FiledStatusContractorScope
04/17/2023Signed-offSatgur ConstructionEarthwork
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
05/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
05/07/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
05/07/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
05/07/2023Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
05/07/2023FinalHARI SONIprogress
05/07/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
05/07/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
05/07/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
05/07/2023MeteringBAKHTIAR SHAMLOOenergy_progress
05/07/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
05/07/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
05/07/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
05/07/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
05/07/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
05/07/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
05/07/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
05/07/2023Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
05/07/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
05/07/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
05/07/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
05/07/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/07/2023MasonryBAKHTIAR SHAMLOOspecial
05/07/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
04/05/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
04/05/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/04/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
Latest 25 of 55.
94 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account