← Back
Three families
125 2 PLACE
BROOKLYN · BIN 3007794
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,072 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Three families · Owner of record: OLIVER 125 REALTY LLC · 1,667 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 19 docs
Floor 31p · 1 filing · 19 docs
Floor 2
Floor 11p · 1 filing · 20 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHURCH 2415 REALTY2107/08/2026
OLIVER 125 REALTY LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHARLES DIEHL ARCHITECT LLC710/04/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CASTILLO RENOVATIONS LLCGeneral Contractor507/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLC HVAC CONTROLS LLC5082910/04/2023
Building Lifecycle
All (62)Filed (7)Permit Issued (4)Signed Off (3)Violation (14)Inspection (4)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/05/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
09/12/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-S1
09/12/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-I1
04/03/2024
Violation issued (HPD, open)
A
01/19/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Violation issued (HPD, open)
I
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
10/04/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-P2
10/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
09/27/2023
Permit issued — Plumbing
B00840897-S1-PL
07/19/2023
Permit issued — Mechanical Systems
B00840897-I1-GC-CX
06/01/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-S1
06/01/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-P1
05/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL LI
05/29/2023
Special inspection requirement — Final
MICHAEL LI
05/29/2023
Special inspection requirement — Heating Systems
MICHAEL LI
05/29/2023
Special inspection requirement — Mechanical Systems
MICHAEL LI
05/29/2023
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
05/29/2023
Special inspection requirement — Exterior lighting power
MICHAEL LI
05/29/2023
Special inspection requirement — Maintenance information
MICHAEL LI
05/29/2023
Special inspection requirement — Lighting in dwelling units
MICHAEL LI
05/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL LI
05/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL LI
05/29/2023
Special inspection requirement — Shutoff dampers
MICHAEL LI
05/29/2023
Special inspection requirement — Lighting controls
MICHAEL LI
04/13/2023
Permit issued — General Construction
B00840897-I1-GC-CX
03/28/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON 3RD FLOOR ONLY.
B00840897-I1
03/17/2023
Violation issued (HPD, open)
A
02/14/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON BASEMENT & FIRS
B00741022-I1
12/29/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/14/2022
Violation issued (HPD, open)
I
09/07/2022
Special inspection requirement — Lighting in dwelling units
MICHAEL LI
09/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
09/07/2022
Special inspection requirement — Heating Systems
MICHAEL LI
09/07/2022
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL LI
09/07/2022
Special inspection requirement — Final
MICHAEL LI
09/07/2022
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL LI
09/07/2022
Special inspection requirement — Maintenance information
MICHAEL LI
09/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL LI
09/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL LI
09/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL LI
09/07/2022
Special inspection requirement — Mechanical Systems
MICHAEL LI
09/01/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON BASEMENT & FIRS
B00741022-P2
08/26/2022
Special inspection requirement — Maintenance information
MICHAEL LI
08/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL LI
08/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL LI
07/21/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON BASEMENT & FIRS
B00741022-P1
05/23/2022
Permit issued — General Construction
B00741022-I1-GC-CX
05/18/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF AN EXISTING 3-STORY OVER BASEMENT & CELLAR RESIDENTIAL BUILDING. INSTALLATION OF NEW AND REPLACEMENT OR RELOCATION OF EXISTING FIXTURES, FINISHES, CASEWORK & PARTITIONS. THIS APPLICATION IS FILED FOR WORK ON BASEMENT & FIRS
B00741022-I1
02/18/2022
Violation issued (HPD, open)
A
04/05/2021
Violation issued (HPD, closed)
I
04/05/2021
Violation issued (HPD, open)
A
10/12/2018
Violation issued (HPD, closed)
I
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC09/27/2023
DOB NOWMechanical SystemsSigned-offCASTILLO RENOVATIONS07/19/2023
DOB NOWGeneral ConstructionSigned-offCASTILLO RENOVATIONS04/13/2023
DOB NOWGeneral ConstructionSigned-offCASTILLO RENOVATIONS05/23/2022
2 projects · most recent 08/29/2023
General Wiring
FiledStatusContractorScope
08/29/2023CompleteL.S. ELECTRIC CORPGeneral Wiring
05/23/2022CompleteL.S. ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/19/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/29/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
10/05/2023Energy Code Compliance InspectionsMICHAEL LIprogress
10/05/2023Fire-Resistant Penetrations and JointsMICHAEL LIspecial
10/03/2023Fire-Resistant Penetrations and JointsMICHAEL LIspecial
10/03/2023Energy Code Compliance InspectionsMICHAEL LIprogress
05/29/2023HVAC-R and service water heating equipmentMICHAEL LIenergy_progress
05/29/2023FinalMICHAEL LIprogress
05/29/2023Heating SystemsMICHAEL LIspecial
05/29/2023Mechanical SystemsMICHAEL LIspecial
05/29/2023Energy Code Compliance InspectionsMICHAEL LIprogress
05/29/2023Exterior lighting powerMICHAEL LIenergy_progress
05/29/2023Maintenance informationMICHAEL LIenergy_progress
05/29/2023Lighting in dwelling unitsMICHAEL LIenergy_progress
05/29/2023HVAC-R and service water heating system controlsMICHAEL LIenergy_progress
05/29/2023HVAC-R and service water piping design and insulationMICHAEL LIenergy_progress
05/29/2023Shutoff dampersMICHAEL LIenergy_progress
05/29/2023Lighting controlsMICHAEL LIenergy_progress
09/07/2022Lighting in dwelling unitsMICHAEL LIenergy_progress
09/07/2022Fire-Resistant Penetrations and JointsMICHAEL LIspecial
09/07/2022Heating SystemsMICHAEL LIspecial
09/07/2022Energy Code Compliance InspectionsMICHAEL LIprogress
09/07/2022FinalMICHAEL LIprogress
09/07/2022Fire-Resistance Rated ConstructionMICHAEL LIprogress
09/07/2022Maintenance informationMICHAEL LIenergy_progress
09/07/2022HVAC-R and service water heating system controlsMICHAEL LIenergy_progress
09/07/2022HVAC-R and service water heating equipmentMICHAEL LIenergy_progress
Latest 25 of 43.
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00741022-I1Request digital key ↗
08/29/2026B00741022-P2Request digital key ↗
08/29/2026B00741022-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026B00741022-P2Open ↗
08/31/2026B00741022-P2Open ↗
08/31/2026B00741022-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026B00741022-P2Open ↗
08/31/2026B00741022-P2Open ↗
08/31/2026B00741022-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00741022-I1Open ↗
08/29/2026B00741022-P2Open ↗
08/29/2026B00741022-P1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00741022-I1Open ↗
08/29/2026B00741022-P2Open ↗
08/29/2026B00741022-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00741022-I1Open ↗