← Back
Predominantly retail with other uses
125 7 AVENUE
BROOKLYN · BIN 3024728
💬 Discuss this project
1931Year Built
4Stories
K4Building Class
R6AZoning
6,236 sfGross Floor Area
4Units
11 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 125 WEST 7TH AVENUELIMITED LIABILITY COM PANY · 1,932 sf lot · 3.23 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 2 filings · 19 docs
Floor 23p · 1 filing · 8 docs
Floor 12p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STEEL SYSTEMS1307/08/2026
125 WEST 7TH AVENUE2507/08/2026
125 W 7TH AVE L103/22/2026
125 W 7 AVE LIMITED LIABI103/22/2026
OWNER OF 125 7 AVE303/22/2026
TO THE OWNER OF 125 7 AVE303/22/2026
125 7TH AVE1903/22/2026
125 WEST 7 AVE L203/22/2026
125 7 AVE703/21/2026
125 WEST 7TH AVENUE LLC C O FRIE403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROBERT TOMS109/12/2025
FL&M ENGINEERING DESIGN &INSPECTION109/12/2024
FSI ARCHITECTURE PC206/17/2024
AK ENGINEERING, PC106/07/2021
STEPHEN DARGO ARCHITECT, DPC101/22/2021
LIGHT HOUSE209/10/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP403/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
HH BUILDING CONSULTING & ARCHITECTU403/21/2026
EAST COAST EXPEDITING203/21/2026
GEIGER E A GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL SYSTEMS LLCGeneral Contractor1107/08/2026
XTREME SCAFFOLDING LLCGeneral Contractor407/08/2026
ABUNDANT CONSTRUCTION LLCGeneral Contractor207/08/2026
EXCLUSIVE RESTORATION &General Contractor207/08/2026
ALEXANDER EUGENEElectrical103/21/2026
ANGELO ARFANISElectrical103/21/2026
NORTH JERSEY ATMS LLCGeneral Contractor107/10/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
JOSEPH SORTINOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THE MTM DESIGN GROUP, LLC1319109/12/2025
FSI ARCHITECTURE, PC354206/17/2024
MURRAY ENGINEERING PC1434106/17/2024
AK ENGINEERING PC678106/07/2021
Building Lifecycle
All (98)Filed (8)Permit Issued (12)Signed Off (5)Violation (60)Special Inspection (13)
07/24/2026
Signed off — Alteration
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00457639-I1
07/08/2026
Permit issued — Antenna
B01280563-I1-AN
09/12/2025
Filed — Alteration
B01280563-I1
09/08/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01100602-I1
06/10/2025
Signed off — Alteration
Roof replacement as per plans filed. No change in occupancy, use or egress.
B00851692-S1
05/21/2025
Signed off — Alteration
Roof replacement as per plans filed. No change in occupancy, use or egress.
B00851692-I1
10/28/2024
Permit issued — Structural
B00851692-S1-ST
10/28/2024
Permit issued — General Construction
B00851692-I1-GC
09/13/2024
Permit issued — Supported Scaffold
B01100602-I1-SH
09/13/2024
Permit issued — Supported Scaffold
B01100602-I1-SF
09/12/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01100602-I1
06/17/2024
Filed — Alteration
Roof replacement as per plans filed. No change in occupancy, use or egress.
B00851692-S1
05/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
James Cicalo
05/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Robert Murray
05/16/2024
Special inspection requirement — Final
Robert Murray
05/16/2024
Special inspection requirement — Structural Wood Frame
Robert Murray
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, closed)
C
09/26/2023
Violation issued (HPD, closed)
A
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
A
09/26/2023
Violation issued (HPD, open)
B
09/26/2023
Violation issued (HPD, open)
B
04/04/2023
Filed — Alteration
Roof replacement as per plans filed. No change in occupancy, use or egress.
B00851692-I1
03/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
James Cicalo
03/29/2023
Special inspection requirement — Fenestration air leakage
James Cicalo
03/29/2023
Special inspection requirement — Final
James Cicalo
03/29/2023
Special inspection requirement — Insulation placement and R values
James Cicalo
03/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
James Cicalo
03/29/2023
Special inspection requirement — Masonry
James Cicalo
06/28/2021
Permit issued — Mechanical Systems
B00457639-S1-MS
06/07/2021
Filed — Alteration
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00457639-S1
05/19/2021
Special inspection requirement — Mechanical Systems
Ari Kamo
05/19/2021
Special inspection requirement — Final
Ari Kamo
02/02/2021
Permit issued — General Construction
B00457639-I1-GC
01/22/2021
Filed — Alteration
SUBSEQUENT APPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B00457639-I1
01/21/2020
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00001999-I1
05/02/2019
Permit issued — Sidewalk Shed
B00001999-I1-SH
11/21/2018
Permit issued — Sidewalk Shed
B00001999-I1-SH
09/11/2018
Special inspection requirement — Final
ASMA CAMELIA
09/10/2018
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00001999-P1
05/10/2018
Permit issued — Sidewalk Shed
B00001999-I1-SH
04/06/2018
Permit issued — Sidewalk Shed
B00001999-I1-SH
11/17/2017
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BUILDING CODE CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00001999-I1
11/17/2017
Permit issued — Sidewalk Shed
B00001999-I1-SH
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2002
Violation issued (ECB, closed)
Construction
04/23/2002
Violation issued (ECB, closed)
Construction
02/06/2002
Violation issued (ECB, closed)
Construction
12/19/2001
Violation issued (ECB, closed)
Zoning
08/16/2001
Violation issued (ECB, closed)
Construction
08/16/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedNORTH JERSEY ATMS LLC07/08/2026
DOB NOWStructuralSigned-offEXCLUSIVE RESTORATION &10/28/2024
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE RESTORATION &10/28/2024
DOB NOWSupported ScaffoldSigned-offXTREME SCAFFOLDING LLC09/13/2024
DOB NOWSupported ScaffoldSigned-offXTREME SCAFFOLDING LLC09/13/2024
DOB NOWMechanical SystemsPermit IssuedABUNDANT CONSTRUCTION LLC06/28/2021
DOB NOWGeneral ConstructionSigned-offABUNDANT CONSTRUCTION LLC02/02/2021
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC05/02/2019
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC11/21/2018
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC05/10/2018
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC04/06/2018
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC11/17/2017
BISOTISSUEDVICHIHEL RESTORATION, INC09/24/2018
BISOTISSUEDVICHIHEL RESTORATION, INC06/21/2018
BISOTISSUEDVICHIHEL RESTORATION, INC06/13/2018
BISOTISSUEDVICHIHEL RESTORATION, INC04/19/2018
BISOTISSUEDVICHIHEL RESTORATION, INC12/11/2017
BISOTISSUEDFAST TRACK ELECTRIC CORP01/17/2017
BISOTISSUEDFAST TRACK ELECTRIC CORP01/13/2017
BISOTISSUEDSEASIDE CONSTRUCTION CO12/12/2013
BISOTISSUEDSEASIDE CONSTRUCTION CO10/29/2013
BISOTRE-ISSUEDSANITARY PLUMBING & HEATI10/10/2013
BISPLISSUEDSANITARY P&H CORP10/10/2013
BISPLISSUEDCOD PLUMBING CORP04/21/2011
BISPLISSUEDCOD PLUMBING CORP06/22/2010
BISOTISSUEDCREATIVE RENOVATIONS LLC05/27/2010
BIS—ISSUEDGIBRALTAR MANAGEMENT CO04/23/2010
BISOTISSUEDCREATIVE RENOVATIONS LLC04/23/2010
BISPLISSUEDCOD PLUMBING CORP03/26/2010
BISOTISSUEDGIBRALTAR MANAGEMENT CO02/22/2010
BISPLISSUEDMONARCH MECHANICAL INC04/09/2004
BISPLISSUEDMONARCH MECH INC03/03/2004
BISOTISSUEDLOTUS AWNINGS ENT INC08/07/2002
BISOTISSUEDLOTUS AWNINGS ENT INC08/07/2002
BISOTISSUEDLOTUS AWNINGS ENT INC08/07/2002
BISOTISSUEDLOTUS AWNINGS ENT INC08/07/2002
BISMHISSUEDUNIVERSAL GROUP OF NY,INC05/13/2002
BISPLISSUEDNEW YORK STANDARD MECH CORP04/08/2002
BISMHISSUEDAIRCON INTERNATIONAL CORP04/01/2002
BISOTISSUEDTHE LORANCO CORP03/05/2002
+ 11 more permits on file
1 project · most recent 06/07/2021
Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
06/07/2021Permit IssuedABUNDANT CONSTRUCTION LLCAssociated Ducts and Piping
Ducts & Piping
N/A N/A Ductwork ×1
3 projects · most recent 09/11/2024
General Wiring
FiledStatusContractorScope
09/11/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
06/02/2023CompleteTOP SHELF ELECTRIC CORP—
01/15/2021Permit IssuedFRACCAVENTO ELEC. CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/16/2024Tenant Protection Plan ComplianceJames Cicalospecial
05/16/2024Structural Stability – Alterations of existing buildingsRobert Murrayspecial
05/16/2024FinalRobert Murrayprogress
05/16/2024Structural Wood FrameRobert Murrayprogress
03/29/2023Tenant Protection Plan ComplianceJames Cicalospecial
03/29/2023Fenestration air leakageJames Cicaloenergy_progress
03/29/2023FinalJames Cicaloprogress
03/29/2023Insulation placement and R valuesJames Cicaloenergy_progress
03/29/2023Fenestration and door U-factor and product ratingsJames Cicaloenergy_progress
03/29/2023MasonryJames Cicalospecial
05/19/2021Mechanical SystemsAri Kamospecial
05/19/2021FinalAri Kamoprogress
09/11/2018FinalASMA CAMELIAprogress
▾Documents — 203 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
09/02/2026B00001999-I1Request digital key ↗
09/02/2026B00001999-P1Request digital key ↗
09/01/2026B00457639-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00457639-I1Request digital key ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION17
08/16/2018321824683Open ↗
08/28/2017321632113Open ↗
08/30/2016321434088Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION14
09/25/2018321824683Open ↗
12/12/2017321632113Open ↗
01/17/2017321434088Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/12/2010320121006Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/02/2016321434088Open ↗
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
08/16/2018321824683Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00851692-I1Open ↗
09/23/2026B00851692-I1Open ↗
09/23/2026B00851692-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/02/2026B00001999-I1Open ↗
09/02/2026B00001999-P1Open ↗
09/01/2026B00457639-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00851692-I1Open ↗
09/23/2026B00851692-I1Open ↗
09/01/2026B00851692-S1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/16/2018321824683Open ↗
11/16/2013320839777Open ↗
10/08/2013320885985Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
08/16/2018321824683Open ↗
11/16/2013320839777Open ↗
10/08/2013320885985Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE11
10/07/2014320885985Open ↗
06/14/2014320885985Open ↗
06/05/2014320885985Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE B - PLUMBING10
10/08/2013320885985Open ↗
04/11/2011320121006Open ↗
07/28/2010320121015Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
11/10/2016321423973Open ↗
▸Safety & Tenant Protection6
▸BISTenant Protection Plan and Notes4
08/16/2018321824683Open ↗
08/28/2017321632113Open ↗
01/17/2017321434088Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
02/24/2010320118403Open ↗
▸BISST-1 Street Tree Checklist1
04/21/2010320121006Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/16/2018321824683Open ↗
08/30/2016321434088Open ↗
08/09/2016321423973Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
02/24/2010320118403Open ↗
01/19/2010320121015Open ↗
01/19/2010320121006Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00457639-S1Open ↗
09/01/2026B00457639-I1Open ↗
08/20/2026B01280563-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/27/2026B00851692-S1Open ↗
08/27/2026B00851692-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
12/12/2017321632113Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
08/16/2018321824683Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
11/27/2017321434088Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
11/27/2017321434088Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
10/08/2013320885985Open ↗
02/24/2010320118403Open ↗
01/19/2010320121015Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
07/05/2012320121006Open ↗
04/11/2012320121006Open ↗
01/19/2010320121006Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/14/2012320121006Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
08/16/2018321824683Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET9
08/16/2018321824683Open ↗
08/28/2017321632113Open ↗
08/09/2016321423973Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
11/14/2016321434088Open ↗
07/02/2012320121006Open ↗
03/01/2012320121006Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
09/30/2019321824683Open ↗
09/30/2019321632113Open ↗
11/27/2017321434088Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISBPP-PARKS: PLANT NEW TREE2
09/14/2012320121006Open ↗
09/14/2012320121006Open ↗
▸BISPLOT DIAGRAM1
11/24/2009320100181Open ↗