The Barbara Esselborn School
125 AINSWORTH AVENUE · Great Kills-Eltingville · BIN 5065016
💬 Discuss this project
1967Year Built
3Stories
W1Building Class
R3-1Zoning
156,000 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 226,312 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction18p · 2 filings · 20 docs
Floor 2Under Construction6p · 1 filing · 13 docs
Floor 1Under Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY PUBLIC SCHOOL709/13/2026
NYC SCHOOL CONSTRUCTION AUTHORITY2807/17/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DOE PS 53 040303/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DEPARTMENT OF EDUCATION703/22/2026
DOE P.S. 53403/22/2026
NEW YORK CITY DEPARTMENT103/22/2026
PS 53 DEPT OF ED103/22/2026
P.S. 53103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME CONSULTING ENGINEERING GROUP806/24/2026
STANTEC ARCHITECTURE INC.511/10/2025
STANTEC611/07/2025
SOLID ENGINEERING PC204/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STANTEC ARCHITECTURE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ULTIMA CONST, INC (SCA)General Contractor507/08/2026
FRANCIS RICHARDSElectrical303/21/2026
DIA GENERAL CONTRUCTION IGeneral Contractor207/08/2026
PRECISION SPKLR SVCS LLCFire Protection107/08/2026
GEOMATRIX SERVICES INCGeneral Contractor107/17/2026
CACERES, JUANElectrical103/21/2026
FRANCO BELLI PLMG&HTG SONPlumbing107/08/2026
ROSENBAUM, MORDECHAIElectrical103/21/2026
URBAN ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351603/31/2026
MUNICIPAL TESTING LABORAT230811/07/2025
Building Lifecycle
All (142)Filed (21)Permit Issued (10)Signed Off (5)Violation (55)Inspection (9)Objection (12)Special Inspection (30)
09/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/16/2026
Permit issued — General Construction
S01041300-I1-GC
07/08/2026
Objection resolved — Addressed
06/30/2026
Objection raised — Other
06/24/2026
Filed — Alteration
S01041300-P1
06/02/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
05/26/2026
Permit issued — Sprinklers
S01116144-S2-EW-SP
05/21/2026
Signed off — Alteration
Opening a wall to provide temporary egress while work is being performed on entrance #3. Temporary egress will be closed and a new wall will be patch in.
S00896316-I1
05/21/2026
Signed off — Alteration
Opening a wall to provide temporary egress while work is being performed on entrance #3. Temporary egress will be closed and a new wall will be patch in.
S00896316-S1
05/21/2026
Signed off — Alteration
Opening a wall to provide temporary egress while work is being performed on entrance #3. Temporary egress will be closed and a new wall will be patch in.
S00896316-S2
05/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/23/2026
Permit issued — Mechanical Systems
S01116144-S1-MS
04/22/2026
Permit issued — General Construction
S01116144-I1-GC
04/17/2026
Special inspection requirement — Interior lighting power
Asma Hashmi
04/17/2026
Special inspection requirement — Lighting controls
Asma Hashmi
04/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
04/17/2026
Special inspection requirement — Final
Asma Hashmi
04/17/2026
Special inspection requirement — Maintenance information
Asma Hashmi
04/10/2026
Special inspection requirement — Sprinkler Systems
Asma Hashmi
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
04/10/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
04/10/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
04/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
04/10/2026
Special inspection requirement — Final
Asma Hashmi
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
04/10/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
04/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
04/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
04/10/2026
Special inspection requirement — Maintenance information
Asma Hashmi
04/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
03/31/2026
Filed — Alteration
INSTALLATION OF UNIT VENTILATORS WITH HEAT PUMPS FOR OT/PT ROOM 129 AND CLASSROOM 336. CONDENSER SHALL BE MOUNTED ON ROOF. INSTALLATION OF REFRIGERANT AND CONDENSATE PIPING. INSTALLATION OF ELECTRICAL WIRING AND CONTROLS. BALANCING OF DUCTWORK.
S01116144-P2
03/31/2026
Filed — Alteration
INSTALLATION OF UNIT VENTILATORS WITH HEAT PUMPS FOR OT/PT ROOM 129 AND CLASSROOM 336. CONDENSER SHALL BE MOUNTED ON ROOF. INSTALLATION OF REFRIGERANT AND CONDENSATE PIPING. INSTALLATION OF ELECTRICAL WIRING AND CONTROLS. BALANCING OF DUCTWORK.
S01116144-P3
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/27/2026
Violation issued (FDNY_ORDER, closed)
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
03/25/2026
Special inspection requirement — Mechanical Systems
Asma Hashmi
03/25/2026
Special inspection requirement — Post-installed Anchors
Asma Hashmi
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
03/25/2026
Special inspection requirement — Final
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
03/25/2026
Special inspection requirement — Maintenance information
Asma Hashmi
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
03/25/2026
Special inspection requirement — Shutoff dampers
Asma Hashmi
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
03/20/2026
Filed — Alteration
INSTALLATION OF UNIT VENTILATORS WITH HEAT PUMPS FOR OT/PT ROOM 129 AND CLASSROOM 336. CONDENSER SHALL BE MOUNTED ON ROOF. INSTALLATION OF REFRIGERANT AND CONDENSATE PIPING. INSTALLATION OF ELECTRICAL WIRING AND CONTROLS. BALANCING OF DUCTWORK.
S01116144-P1
01/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Signed off — Alteration
S01207753-I1
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/11/2025
Objection resolved — Addressed
12/04/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB BIS JOB # S00896316
S01163451-I1
11/18/2025
Objection raised — Other
11/18/2025
Objection raised — Other
11/18/2025
Objection raised — Other
Latest 60 of 142 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGEOMATRIX SERVICES INC07/16/2026
DOB NOWSprinklersPermit IssuedPRECISION SPKLR SVCS LLC05/26/2026
DOB NOWMechanical SystemsPermit IssuedDIA GENERAL CONTRUCTION I04/23/2026
DOB NOWGeneral ConstructionPermit IssuedDIA GENERAL CONTRUCTION I04/22/2026
DOB NOWEarth WorkSigned-offULTIMA CONST, INC (SCA)08/21/2025
DOB NOWPlumbingSigned-offFRANCO BELLI PLMG&HTG SON08/14/2025
DOB NOWGeneral ConstructionSigned-offULTIMA CONST, INC (SCA)06/23/2025
DOB NOWSupport of ExcavationSigned-offULTIMA CONST, INC (SCA)06/20/2025
DOB NOWSupport of ExcavationSigned-offULTIMA CONST, INC (SCA)06/18/2025
DOB NOWConstruction FenceSigned-offULTIMA CONST, INC (SCA)06/04/2025
BISPLISSUEDGENUINE PLBG & HTG LLC10/01/2019
BISPLISSUEDGENUINE PLBG & HTG LLC10/01/2019
BISOTISSUEDNYCMC CORP09/24/2019
BISPLISSUEDGENUINE PLBG & HTG LLC08/23/2018
BISOTISSUEDNYCMC CORP08/23/2018
BISOTISSUEDJOHN CHRIS TAYLOR CONSTRU08/23/2018
BISOTISSUEDSUPERIOR BUILDERS II INC03/28/2014
BISOTISSUEDSUPERIOR BUILDERS II INC09/06/2013
BISPLISSUEDACE CONTRACTING, INC09/06/2013
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN07/18/2013
BISOTISSUEDKORE CONTRACTING CORP06/27/2013
BISEQISSUEDKORE CONTRACTING CORP05/30/2012
BISOTISSUEDKORE CONTRACTING CORP05/29/2012
BISOTISSUEDKORE CONTRACTING CORP05/23/2012
BISOTISSUEDKORE CONTRACTING CORP05/23/2012
BISOTISSUEDKORE CONTRACTING CORP11/09/2011
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN11/09/2011
BISEQISSUEDKORE CONTRACTING CORP11/07/2011
BISPLISSUEDVARSITY PLBG AND HTG INC03/13/2008
BISOTISSUEDRB'S REALTY & CONSTRUCTION CORP03/13/2008
BISMHISSUEDACS SYSTEMS ASSOCIATES, INC03/13/2008
BISOTISSUEDKOMI CONSTRUCTION INCORPORATED09/28/2007
BISEQISSUEDSAFWAY SERVICES01/10/2007
BISEQISSUEDSAFWAY SERVICES10/18/2006
BISEQISSUEDDIXIE CONSTRUCTION10/17/2000
BISOTISSUEDBEYS CONTRACTING INCORPORATED02/28/1997
BISPLISSUEDLIPSKY & ROSENTHAL, INCORPORATED06/05/1996
BISOTISSUEDBEYS CONTRACTING INCORPORATED05/06/1996
1 project · most recent 03/31/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/31/2026Permit IssuedDIA GENERAL CONTRUCTION IHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ARUH18LUAS & AOUH18LAUS1 18,000 BTU · Split System ×4
1 project · most recent 03/31/2026
FiledStatusContractorScope
03/31/2026Permit IssuedPRECISION SPKLR SVCS LLC5 heads
2 projects · most recent 03/31/2026
Storm
FiledStatusContractorScope
03/31/2026———
11/10/2025Signed-offFRANCO BELLI PLMG&HTG SONStorm
5 projects · most recent 09/16/2020
General Wiring
FiledStatusContractorScope
09/16/2020Permit IssuedA & S ELECTRIC INC.General Wiring
04/17/2019CompleteDORION NORTON ELECL CONTGeneral Wiring
03/13/2019CompleteJ & T GENERAL CORP DBAGeneral Wiring
02/14/2019Permit IssuedA & S ELECTRIC INC.General Wiring
11/09/2018CompleteURBAN ELECTRICAL CORPGeneral Wiring
1 project · most recent 11/10/2025
Concrete
FiledStatusContractorScope
11/10/2025Signed-offULTIMA CONST, INC (SCA)Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
05/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Pass-Final PL - UndergroundPassView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/17/2026Interior lighting powerAsma Hashmienergy_progress
04/17/2026Lighting controlsAsma Hashmienergy_progress
04/17/2026Structural Stability – Alterations of existing buildingsAsma Hashmispecial
04/17/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
04/17/2026Energy Code Compliance InspectionsAsma Hashmiprogress
04/17/2026FinalAsma Hashmiprogress
04/17/2026Maintenance informationAsma Hashmienergy_progress
04/10/2026Sprinkler SystemsAsma Hashmispecial
04/10/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
04/10/2026Mechanical SystemsAsma Hashmispecial
04/10/2026Post-installed AnchorsAsma Hashmispecial
04/10/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
04/10/2026FinalAsma Hashmiprogress
04/10/2026Energy Code Compliance InspectionsAsma Hashmiprogress
04/10/2026Shutoff dampersAsma Hashmienergy_progress
04/10/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
04/10/2026HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
04/10/2026Maintenance informationAsma Hashmienergy_progress
04/10/2026HVAC-R and service water heating system controlsAsma Hashmienergy_progress
03/25/2026Fire-Resistant Penetrations and JointsAsma Hashmispecial
03/25/2026Mechanical SystemsAsma Hashmispecial
03/25/2026Post-installed AnchorsAsma Hashmispecial
03/25/2026Energy Code Compliance InspectionsAsma Hashmiprogress
03/25/2026Final—progress
03/25/2026HVAC-R and service water heating equipmentAsma Hashmienergy_progress
Latest 25 of 48.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 53, Staten Island The Barbara Esselborn SchoolEducationFloors 1, 3
Project S01116144 Alteration · Permit Entire · 11/06/2024
P.S. 53EducationFloors 2, 3
Project S01041300 Alteration · Permit Entire · 04/26/2024
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/22/2026S00896316-P1Request digital key ↗
08/22/2026S00896316-I1Request digital key ↗
08/22/2026S00896316-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/22/2026S00896316-S3Open ↗
08/22/2026S00896316-I1Open ↗
08/22/2026S00896316-S1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
08/31/2026S00896316-P1Open ↗
08/25/2026S01116144-I1Open ↗
08/25/2026S01116144-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026S00896316-P4Open ↗
08/25/2026S01116144-I1Open ↗
08/25/2026S01116144-I1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026S01163451-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/22/2026S00896316-S2Open ↗
08/22/2026S00896316-I1Open ↗
08/22/2026S00896316-S1Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/22/2026S00896316-P1Open ↗
08/22/2026S00896316-I1Open ↗
08/22/2026S00896316-S1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)19
08/20/2026S01116144-P2Open ↗
08/20/2026S01116144-I1Open ↗
08/14/2026S01041300-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)5
08/22/2026S00896316-I1Open ↗
08/22/2026S00896316-S1Open ↗
08/22/2026S00896316-S2Open ↗
Showing 3 of 5 on file for this type
▸Other Documents23
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal16
08/21/2026S01041300-I1Open ↗
08/14/2026S01041300-P1Open ↗
08/13/2026S00896316-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/22/2026S00896316-S2Open ↗
08/22/2026S00896316-I1Open ↗
08/22/2026S00896316-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026S01207753-I1Open ↗
08/13/2026S00896316-S1Open ↗