← Back
BuildNYC
Old law tenement
125 BEDFORD AVENUE
BROOKLYN · BIN 3061614
💬 Discuss this project
1900Year Built
4Stories
C4Building Class
R6AZoning
8,000 sfGross Floor Area
8Units
Rent Stabilized2 Active Violations ▸FDNY Report ↗
Old law tenement · Owner of record: 125 Bedford Ave Realty · 2,500 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMugs Ale House9p · 2 filings · 20 docs
Floor 1Mugs Ale House24p · 4 filings · 20 docs
CellarMugs Ale House23p · 3 filings · 20 docs
Site & exterior9p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 Bedford Ave Realty1504/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael McVann P.E.104/16/2026
Tan Engineering609/15/2022
Rip Construction Consultants208/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rip CC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Accurate MechanicalPlumbing607/08/2026
Ecny Electrical ContractorsElectrical203/21/2026
Samson Building ConsultanGeneral Contractor203/21/2026
Samson Building Consultanspecialty_contractor203/21/2026
Ideal Fire ControlFire Protection110/24/1995
J.jekowsky & SonsPlumbing207/23/1997
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Fordham Refrigeration & A5864104/16/2026
Tan Engineering1291609/15/2022
Building Lifecycle
07/16/2026
Objection raised — Structural
07/16/2026
Objection raised — Scope
07/16/2026
Objection resolved — Resolved
07/16/2026
Objection raised — Admin
07/16/2026
Objection raised — Zoning
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAnthony Disabato11/23/2021
DOB NOWPlumbingSigned-offAnthony Disabato11/01/2021
DOB NOWMechanical SystemsSigned-offSamson Building Consultan10/28/2021
DOB NOWGeneral ConstructionSigned-offSamson Building Consultan10/21/2021
BISBLISSUEDJ.jekowsky & Sons07/23/1997
BISPLISSUEDJ.jekowsky & Sons07/23/1997
BISFPISSUEDIdeal Fire Control10/24/1995
BISOTISSUEDBeres PB & Ale08/15/1994
BISOTISSUEDBeres Bar & Pub12/22/1993
1 project · most recent 04/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
04/16/2026——Heating and Air Conditioning Systems
2 projects · most recent 09/27/2023
General Wiring
FiledStatusContractorScope
09/27/2023CompleteEcny Electrical ContractorsGeneral Wiring
09/19/2023CancelledEcny Electrical ContractorsGeneral Wiring
1 project · most recent 04/16/2026
Steel
FiledStatusContractorScope
04/16/2026——Steel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/08/2026Tenant Protection Plan Compliance—special
04/08/2026HVAC-R and service water piping design and insulationMICHAEL MCVANNenergy_progress
04/08/2026FinalMICHAEL MCVANNprogress
04/08/2026Structural Steel - Details—special
04/08/2026Mechanical SystemsMICHAEL MCVANNspecial
04/08/2026Fire-Resistant Penetrations and JointsMICHAEL MCVANNspecial
04/08/2026HVAC-R and service water heating system controlsMICHAEL MCVANNenergy_progress
04/08/2026HVAC-R and service water heating equipmentMICHAEL MCVANNenergy_progress
09/19/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
09/19/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/19/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/19/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/15/2022Energy Code Compliance InspectionsRoger Tanprogress
09/15/2022Mechanical SystemsRoger Tanspecial
09/15/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
09/15/2022FinalRoger Tanprogress
09/15/2022Maintenance informationRoger Tanenergy_progress
09/15/2022HVAC-R and service water heating equipmentRoger Tanenergy_progress
09/15/2022Duct leakage testing, insulation and designRoger Tanenergy_progress
09/15/2022HVAC-R and service water heating system controlsRoger Tanenergy_progress
09/15/2022Shutoff dampersRoger Tanenergy_progress
09/15/2022HVAC-R and service water piping design and insulationRoger Tanenergy_progress
09/15/2022Ventilation and air distribution systemRoger Tanenergy_progress
09/12/2022Ventilation and air distribution systemRoger Tanenergy_progress
09/12/2022Duct leakage testing, insulation and designRoger Tanenergy_progress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mugs Ale HouseRestaurant / Food ServiceCellar, Floor 1, Roof
Project B01384446 Alteration · Plan Examiner Review · 04/16/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
66 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account