← Back
Two family frame
125 BLOOMINGDALE ROAD
STATEN ISLAND · BIN 5158600
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
3,240 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 5,342 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 11p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKEN SERVICES1507/08/2026
SKEN SERVICES CORP SKENDE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS108/05/2024
WILLIAM MONTAGUE ENGINEER205/07/2024
STANLEY M. KREBUSHEVSKI, R.A.204/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLOW-RIGHT FIRE SUPP CORPFire Protection207/08/2026
SKEN SERVICES CORPGeneral Contractor203/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
DV PLUMBING INCPlumbing107/08/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677405/07/2024
A TECH ENGINEERING NYC, P6738204/15/2024
Building Lifecycle
All (41)Filed (5)Permit Issued (7)Signed Off (3)Violation (4)Inspection (12)Special Inspection (10)
03/17/2025
Signed off — Alteration
PROPOSED 18' CURB CUT FILED IN CONJUNCTION WITH NEW BUILDING APPLICATIONS #520359282 AND #520359291.
S00331735-I1
09/03/2024
Signed off — Alteration
PROPOSED 2" DOMESTIC WITH SP TAKE OFF
S08028341-I1
08/16/2024
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #520359282.
S00331768-I1
08/15/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/07/2024
Permit issued — Curb Cut
S00331735-I1-CC
08/05/2024
Filed — Alteration
PROPOSED 18' CURB CUT FILED IN CONJUNCTION WITH NEW BUILDING APPLICATIONS #520359282 AND #520359291.
S00331735-I1
05/17/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/17/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/17/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2024
Filed — Alteration
PROPOSED 2" DOMESTIC WITH SP TAKE OFF
S08028341-P1
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
05/07/2024
Special inspection requirement — Sprinkler Systems
WILLIAM MONTAGUE
05/03/2024
Special inspection requirement — Sprinkler Systems
WILLIAM MONTAGUE
05/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
04/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2024
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #520359282.
S00331768-P1
04/15/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/15/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
04/15/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
04/12/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/12/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
04/12/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
04/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
03/27/2024
Permit issued — Sprinklers
S08028341-I1-EW-SP
03/27/2024
Permit issued — Plumbing
S08028341-I1-PL
03/01/2024
Permit issued — Plumbing
S00331768-I1-PL
05/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/25/2023
Violation issued (ECB, closed)
Construction
04/25/2023
Violation issued (ECB, closed)
Construction
02/16/2023
Permit issued — Sprinklers
S08028341-I1-EW-SP
11/25/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/23/2022
Violation issued (ECB, closed)
Construction
11/22/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/17/2022
Permit issued — Plumbing
S51083149-I1-PL
10/31/2022
Filed — Alteration
PROPOSED 2" DOMESTIC WITH SP TAKE OFF
S08028341-I1
10/25/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/21/2022
Violation issued (ECB, closed)
Construction
10/03/2022
Permit issued — Plumbing
S00331768-I1-PL
08/31/2022
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #520359282.
S00331768-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTT & T CONSTRUCTION INC08/07/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP03/27/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR03/27/2024
DOB NOWPlumbingSigned-offDV PLUMBING INC03/01/2024
DOB NOWSprinklersSigned-offFLOW-RIGHT FIRE SUPP CORP02/16/2023
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC11/17/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/03/2022
BIS—ISSUEDSKEN SERVICES CORP03/13/2024
BIS—ISSUEDSKEN SERVICES CORP07/11/2023
BIS—ISSUEDSKEN SERVICES CORP04/01/2023
BIS—ISSUEDSKEN SERVICES CORP08/01/2022
1 project · most recent 04/25/2023
General Wiring
FiledStatusContractorScope
04/25/2023CompleteD AND H ELECTRICAL CONSTGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/15/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/17/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/14/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/25/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
05/07/2024Sprinkler SystemsWILLIAM MONTAGUEspecial
05/03/2024Sprinkler SystemsWILLIAM MONTAGUEspecial
05/03/2024Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/15/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/15/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
04/15/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
04/12/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/12/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
04/12/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
▾Documents — 129 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026S00331768-I1Request digital key ↗
08/21/2026S00331768-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/23/2026S08028341-I1Request digital key ↗
08/23/2026S08028341-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/21/2026S00331735-I1Request digital key ↗
▸Applications & Permits11
▸BISPLAN / WORK APPROVAL APPLICATION9
10/07/2025520359282Open ↗
09/26/2025520359282Open ↗
02/18/2025520359282Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/16/2024520359282Open ↗
▸BISWORK PERMIT APPLICATION1
08/01/2022520359282Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
10/20/2021520359282Open ↗
03/01/2012520089813Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/11/2021520359282Open ↗
03/01/2012520089813Open ↗
▸BISVERIFY TAX LOT1
08/07/2024520359282Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/11/2021520359282Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/07/2024520359282Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
03/01/2012520089813Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026S08028341-I1Open ↗
09/23/2026S08028341-I1Open ↗
08/24/2026S00331768-P1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/18/2020520359282Open ↗
03/01/2012520089813Open ↗
03/01/2012520089813Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S08028341-I1Open ↗
08/21/2026S00331768-I1Open ↗
08/13/2026S08028341-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING1
02/02/2012520089813Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/01/2012520089813Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
09/09/2025520359282Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
09/09/2025520359282Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/12/2024520359282Open ↗
▸BISUPDATE PREVIOUS SEWER CONNECTION DEP SD1& SD21
10/24/2025520359282Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
03/18/2020520359282Open ↗
03/01/2012520089813Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY2
03/01/2012520089813Open ↗
03/01/2012520089813Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
06/28/2022520359282Open ↗
08/11/2021520359282Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/09/2025520359282Open ↗
▸BISINTERIOR LIGHTING POWER1
09/09/2025520359282Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/09/2025520359282Open ↗
▸BISFENESTRATION AREAS1
09/09/2025520359282Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
09/09/2025520359282Open ↗
▸BISENERGY CODE OBJECTIONS1
10/20/2021520359282Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/09/2025520359282Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
09/09/2025520359282Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/18/2020520359282Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/09/2025520359282Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY3
06/28/2022520359282Open ↗
08/11/2021520359282Open ↗
08/11/2021520359282Open ↗
▸BISBORINGS - TEST PITS (TR-4) 27-7202
03/01/2012520089813Open ↗
03/01/2012520089813Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
09/09/2025520359282Open ↗
06/28/2022520359282Open ↗
▸DOB NOWSOIL REPORT2
08/21/2026S00331768-I1Open ↗
08/13/2026S00331768-P1Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
09/09/2025520359282Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
09/09/2025520359282Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
08/11/2021520359282Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/09/2025520359282Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/01/2022520359282Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
09/09/2025520359282Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
09/09/2025520359282Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
09/09/2025520359282Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
09/09/2025520359282Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
09/09/2025520359282Open ↗
▸BISSOIL REPORT1
08/11/2021520359282Open ↗
▸BISSOIL PERCOLATE TEST-DRY WELL RS16-P1131
03/01/2012520089813Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00331768-I1Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE7
10/07/2025520359282Open ↗
09/26/2025520359282Open ↗
02/18/2025520359282Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/18/2020520359282Open ↗
02/02/2012520089813Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/01/2012520089813Open ↗
▸BISBSA-CPC APPROVAL1
03/01/2012520089813Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION9
04/22/2025520359282Open ↗
07/25/2022520359282Open ↗
10/20/2021520359282Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
03/18/2020520359282Open ↗
02/02/2012520089813Open ↗
▸BISBOROUGH INTAKE FORM1
03/18/2020520359282Open ↗
▸Other Documents8
▸BISSHUTOFF DAMPERS1
09/09/2025520359282Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
08/11/2021520359282Open ↗
▸BISUPDATE PREVIOUS RP-602 FORM FOR NEW BOUNDRY.1
10/24/2025520359282Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
09/09/2025520359282Open ↗
▸BISMAINTENANCE INFORMATION1
09/09/2025520359282Open ↗
▸BISPERMANENT CERTIFICATE1
09/09/2025520359282Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
08/11/2021520359282Open ↗
▸BISPLOT DIAGRAM1
02/02/2012520089813Open ↗