← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
125 EAST 4TH STREET
MANHATTAN · East Village · BIN 1006220
💬 Discuss this project
2004Year Built
6Stories
RMBuilding Class
R8BZoning
20,743 sfGross Floor Area
29Units
Rent Stabilized8 Active Violations 2 likely answered ▸
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 4,784 sf lot · 4.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Bulkhead125 East 4th Street Owners Corp.Under Construction1p · 1 filing · 12 docs
Floor 2Balcony door to window conversion1p · 1 filing · 4 docs
Floor 1
Site & exterior125 East 4th Street Owners Corp.Under Construction16p · 3 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 E 4th St Owners4404/09/2026
Property103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Volume Space Consulting210/27/2025
Roger de Electric Co108/20/2025
Devang Arvind Shah103/29/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio403/21/2026
Salamon Engineering203/21/2026
E-Z Safety NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empac ContractingScaffold407/08/2026
Innovative Ventures TeamGeneral Contractor303/21/2026
High Quality Electric of NYCElectrical103/22/2026
Jack Verrelli ElectricElectrical103/21/2026
A & S ElectricElectrical103/21/2026
Approved ElectricElectrical103/21/2026
Bulado General ContractorGeneral Contractor104/09/2026
Neumann ElectricElectrical103/21/2026
Electrical SolutionsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899110/22/2025
Salamon Engineering1264108/20/2025
Building Lifecycle
All (75)Filed (5)Permit Issued (7)Signed Off (4)Violation (54)Special Inspection (5)
08/04/2026
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01217413-I1
07/06/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01307087-I1
06/09/2026
Signed off — Alteration
FACADE RESTORATION & INSPECTIONS
M01240728-S1
04/30/2026
Permit issued — Supported Scaffold
M01307087-I1-SF
04/30/2026
Permit issued — Sidewalk Shed
M01217413-I1-SH
11/17/2025
Violation issued (HPD, closed)
I
10/28/2025
Permit issued — Supported Scaffold
M01307087-I1-SF
10/27/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01307087-I1
10/27/2025
Permit issued — Suspended Scaffold
M01240728-S1-SC
10/23/2025
Permit issued — General Construction
M01240728-I1-GC
10/22/2025
Filed — Alteration
FACADE RESTORATION & INSPECTIONS
M01240728-S1
10/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ARIEL GOLSHAN
10/21/2025
Special inspection requirement — Post-installed Anchors
ARIEL GOLSHAN
08/20/2025
Filed — Alteration
FACADE RESTORATION & INSPECTIONS
M01240728-I1
08/07/2025
Special inspection requirement — Masonry
David Salamon
07/18/2025
Violation issued (HPD, closed)
C
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
David Salamon
06/12/2025
Special inspection requirement — Final
David Salamon
05/01/2025
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01217413-I1
05/01/2025
Permit issued — Sidewalk Shed
M01217413-I1-SH
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
07/23/2024
Violation issued (HPD, closed)
C
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2023
Violation issued (HPD, closed)
C
05/09/2023
Violation issued (HPD, closed)
C
05/09/2023
Violation issued (HPD, closed)
C
05/09/2023
Violation issued (HPD, closed)
C
03/08/2023
Violation issued (ECB, closed)
Plumbing
06/28/2021
Signed off — Alteration
CONVERSION OF BALCONY DOOR TO A WINDOW. REMOVE WASHING MACHINE. NO CHANGE IN USE. TWO METHODS OF EGRESS TO REMAIN.
M00464057-I1
04/28/2021
Permit issued — General Construction
M00464057-I1-GC
03/29/2021
Filed — Alteration
CONVERSION OF BALCONY DOOR TO A WINDOW. REMOVE WASHING MACHINE. NO CHANGE IN USE. TWO METHODS OF EGRESS TO REMAIN.
M00464057-I1
10/25/2019
Violation issued (HPD, closed)
I
06/26/2019
Violation issued (HPD, open)
B
06/26/2019
Violation issued (HPD, open)
B
06/26/2019
Violation issued (HPD, open)
B
06/26/2019
Violation issued (HPD, open)
A
06/26/2019
Violation issued (HPD, open)
C
06/26/2019
Violation issued (HPD, open)
B
06/26/2019
Violation issued (HPD, open)
B
06/26/2019
Violation issued (HPD, open)
C
10/05/2018
Violation issued (HPD, closed)
I
03/09/2018
Violation issued (ECB, closed)
Construction
03/07/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/16/2017
Violation issued (ECB, closed)
Construction
04/19/2017
Violation issued (HPD, closed)
C
04/19/2017
Violation issued (HPD, closed)
B
04/19/2017
Violation issued (HPD, closed)
A
10/01/2015
Violation issued (HPD, closed)
I
02/02/2015
Violation issued (HPD, closed)
I
04/30/2013
Violation issued (ECB, closed)
Construction
11/16/2012
Violation issued (HPD, closed)
B
07/27/2012
Violation issued (HPD, closed)
B
07/27/2012
Violation issued (HPD, closed)
B
07/27/2012
Violation issued (HPD, closed)
B
07/27/2012
Violation issued (HPD, closed)
A
07/27/2012
Violation issued (HPD, closed)
A
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offEmpac Contracting04/30/2026
DOB NOWSidewalk ShedSigned-offEmpac Contracting04/30/2026
DOB NOWSupported ScaffoldSigned-offEmpac Contracting10/28/2025
DOB NOWSuspended ScaffoldSigned-offBulado General Contractor10/27/2025
DOB NOWGeneral ConstructionPermit IssuedBulado General Contractor10/23/2025
DOB NOWSidewalk ShedSigned-offEmpac Contracting05/01/2025
DOB NOWGeneral ConstructionSigned-offInnovative Ventures Team04/28/2021
BISPLISSUEDFernandez Heating & Mechanical08/12/2022
BISOTISSUEDF&S Contracting Group11/20/2018
BISOTISSUEDF&S Contracting Group09/13/2018
BISOTISSUEDF&S Contracting Group01/09/2018
BISOTISSUEDF&S Contracting Group01/09/2018
BISOTISSUEDTitan Restoration11/04/2015
BISEQISSUEDTitan Restoration10/17/2015
BISPLISSUEDAriana Contracting12/15/2014
BISOTISSUEDA.N.C. Contracting Co11/18/2014
BISOTISSUEDA.N.C. Contracting Co08/14/2014
BISPLISSUEDTesterman Plumbing & Heating05/20/2014
BISOTISSUEDA.N.C. Contracting Co05/16/2014
BISOTISSUEDA.N.C. Contracting Co01/16/2014
BISOTISSUEDA.N.C. Contracting Co12/03/2013
BISEQISSUEDMetro Contracting NY11/29/2013
BISPLISSUEDNew Amsterdam Plumbing & Heating04/30/2013
BISOTISSUEDNax Construction03/15/2013
BISOTISSUEDNax Construction01/16/2013
BISPLISSUEDMetrocity Group09/12/2011
BISOTISSUEDBuckley Contracting Co08/30/2011
BISOTISSUEDBig Poll & Son Construction01/16/2009
BISPLISSUEDAccurate Mechanical12/12/2008
BISOTISSUEDBig Poll & Son Construction11/21/2008
BISPLISSUEDAmer-A-Pipe Plumbing & Heating05/09/2008
BISOTISSUEDLower East Side Construction03/06/2008
BISPLISSUEDA.M.N01/26/2008
BISOTISSUEDDemarco Construction Service12/27/2007
BISPLISSUEDSal Napoli Plumbing & Heating10/16/2007
BISPLISSUEDA.M.N12/20/2006
BISOTISSUEDDemarco Construction Service09/19/2006
BISPLISSUEDTom Braun Plumbing & Heating02/07/2006
BISPLISSUEDStarr Mechanical10/11/2005
BISOTISSUEDJ. Fitzsimmons Building08/25/2005
+ 10 more permits on file
1 project · most recent 09/10/2025
FiledStatusContractorScope
09/10/2025Permit IssuedHigh Quality Electric of NYC—
2 projects · most recent 10/27/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
10/27/2025Signed-offEmpac ContractingScaffold
05/01/2025Signed-offEmpac ContractingSidewalk Shed
1 project · most recent 10/22/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
10/22/2025Signed-offBulado General ContractorSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/21/2025Alternative Materials - OTCR Buildings Bulletin NumberARIEL GOLSHANspecial
10/21/2025Post-installed AnchorsARIEL GOLSHANspecial
08/07/2025MasonryDavid Salamonspecial
06/26/2025Tenant Protection Plan ComplianceDavid Salamonspecial
06/12/2025FinalDavid Salamonprogress
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/23/2026M01217413-I1Request digital key ↗
08/21/2026M01240728-I1Request digital key ↗
08/21/2026M01240728-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00464057-I1Request digital key ↗
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION24
11/14/2025104544851Open ↗
03/15/2024104215485Open ↗
10/11/2022122011786Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION24
08/15/2022122011786Open ↗
08/09/2022122011786Open ↗
11/20/2018140735836Open ↗
Showing 3 of 24 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
05/10/2018140735836Open ↗
▸Seals & Professional Certifications53
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
03/07/2019140735836Open ↗
03/07/2019140735836Open ↗
08/01/2016122061357Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/31/2018140735836Open ↗
01/02/2018140728336Open ↗
01/02/2018140728327Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
01/31/2018140735836Open ↗
01/02/2018140728336Open ↗
01/02/2018140728327Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
08/25/2014122061357Open ↗
08/25/2014122061357Open ↗
08/19/2014121828433Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
01/31/2018140735836Open ↗
01/02/2018140728336Open ↗
01/02/2018140728327Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026M01240728-P1Open ↗
08/21/2026M01240728-I1Open ↗
08/13/2026M00464057-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
08/25/2014121828433Open ↗
08/25/2014122061357Open ↗
05/20/2014122011786Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026M01240728-I1Open ↗
08/23/2026M01240728-S1Open ↗
08/23/2026M01240728-S1Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M01240728-I1Open ↗
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE9
02/19/2015122011786Open ↗
01/20/2015121828433Open ↗
01/20/2015121828433Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING8
09/28/2022122011786Open ↗
09/20/2022122011786Open ↗
09/16/2022122011786Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/22/2014122011786Open ↗
08/19/2014121828433Open ↗
05/20/2014122011786Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/19/2023122011786Open ↗
▸BISPLUMBING (PL) SIGNOFF1
11/17/2025104544851Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES3
01/31/2018140735836Open ↗
01/02/2018140728336Open ↗
01/02/2018140728327Open ↗
▸BIS* TENANT PROTECTION PLAN MEMO1/6/841
11/18/2025104544851Open ↗
▸BISSTREET TREE CHECKLIST1
05/20/2014122011786Open ↗
▸Environmental & Asbestos14
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/31/2018140735836Open ↗
11/09/2015122061348Open ↗
08/19/2014121828433Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026M01240728-P1Open ↗
08/21/2026M01240728-I1Open ↗
08/13/2026M00464057-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/07/2019140735836Open ↗
03/07/2019140735836Open ↗
08/01/2016122061357Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/07/2019140735836Open ↗
03/07/2019140735836Open ↗
08/01/2016122061357Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
10/14/2014122061348Open ↗
08/25/2014121828433Open ↗
08/17/2011120790448Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/31/2018140735836Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/19/2023122011786Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/06/2023122011786Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/31/2018140735836Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/06/2023122011786Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
02/19/2023122011786Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00464057-I1Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY12
11/19/2025104544851Open ↗
11/19/2025104544851Open ↗
11/06/2025104544851Open ↗
Showing 3 of 12 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/19/2024104215485Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
11/21/2025104544851Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/01/2023122011786Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/06/2023122011786Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
11/21/2025104544851Open ↗
11/19/2025104544851Open ↗
03/20/2024104215485Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
12/13/2012121457850Open ↗
08/17/2011120790448Open ↗
Showing 2 of 4 on file for this type
▸BISSUPERSEDING LETTER1
08/15/2022122011786Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/08/2008110088217Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
03/06/2023122011786Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT14
03/07/2019140735836Open ↗
03/07/2019140735836Open ↗
01/31/2018140735836Open ↗
Showing 3 of 14 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
11/10/2025104544851Open ↗
11/10/2025104544851Open ↗
03/15/2024104215485Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET5
08/25/2014122061357Open ↗
08/19/2014121828433Open ↗
05/20/2014122011786Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/31/2018140735836Open ↗
01/02/2018140728336Open ↗
01/02/2018140728327Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/03/2019102498824Open ↗
03/07/2019140735836Open ↗
03/07/2019140735836Open ↗
▸BISADDITIONAL INFORMATION3
05/10/2018140735836Open ↗
10/14/2014122011786Open ↗
12/09/2013121457850Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
05/20/2014122011786Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01240728-S1Open ↗
▸DOB NOWCalculations1
08/13/2026M01240728-S1Open ↗