← Back
Parochial school, yeshiva
125 FT GREENE PLACE
BROOKLYN · BIN 3059242
💬 Discuss this project
1857Year Built
3Stories
W2Building Class
R6BZoning
3,071 sfGross Floor Area
1Units
38 Open Violations 36 unresolved · 2 paperwork only ▸FDNY Report ↗
Parochial school, yeshiva · 2,075 sf lot · 1.48 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD707/08/2026
BKLYN SUNDAY SCHOOL UNION203/22/2026
BROOKLYN SUNDAY SCHOOL UN303/22/2026
BKLN SUNDAY SCHOOL UNION103/22/2026
BKYN SUNDAY SCHOOL UNIV103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRANI ENGINEERING AND LAND SURVEYI209/30/2022
SYED ENGINEERING, P.C.107/27/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRANITE ENVIRONMENT203/21/2026
XPEDITE203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GRANITE ENVIRONMENT, LLCGeneral Contractor407/08/2026
G.N. CONSTRUCTION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIRANI ENGINEERING & LAND679106/21/2022
Building Lifecycle
All (72)Filed (3)Permit Issued (3)Signed Off (2)Violation (54)Inspection (2)Objection (8)
06/08/2026
Violation issued (ECB, open)
Construction
06/08/2026
Violation issued (ECB, open)
Unknown
06/08/2026
Violation issued (ECB, open)
Unknown
10/16/2025
Violation issued (ECB, open)
Construction
10/16/2025
Violation issued (ECB, open)
Unknown
08/26/2025
Violation issued (ECB, open)
Construction
08/26/2025
Violation issued (ECB, open)
Unknown
07/31/2025
Violation issued (ECB, open)
Unknown
06/05/2025
Violation issued (ECB, open)
Construction
05/22/2025
Violation issued (ECB, open)
Unknown
05/22/2025
Violation issued (ECB, open)
Construction
02/27/2025
Violation issued (ECB, open)
Construction
01/16/2025
Violation issued (ECB, closed)
Unknown
01/16/2025
Violation issued (ECB, open)
Construction
10/15/2024
Violation issued (ECB, open)
Construction
10/15/2024
Violation issued (ECB, open)
Unknown
09/05/2024
Violation issued (ECB, closed)
Construction
09/03/2024
Violation issued (ECB, closed)
Unknown
09/03/2024
Violation issued (ECB, open)
Construction
09/03/2024
Violation issued (ECB, closed)
Unknown
06/13/2024
Violation issued (ECB, open)
Construction
04/18/2024
Violation issued (ECB, open)
Unknown
12/01/2022
Signed off — Alteration
Demolition of rear two-story extension to comply with HPD emergency declaration
B00745538-I1
11/29/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/28/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/09/2022
Signed off — Alteration
Filed Herewith; 8 Foot High Plywood Construction Fence Application in conjunction with Demolition Application #B00745538
B00743330-I1
10/17/2022
Permit issued — General Construction
B00745538-I1-GC-CX
10/17/2022
Permit issued — Construction Fence
B00743330-I1-FN
09/30/2022
Filed — Alteration
Filed Herewith; 8 Foot High Plywood Construction Fence Application in conjunction with Demolition Application #B00745538
B00743330-I1
09/22/2022
Objection resolved — Addressed
09/22/2022
Objection resolved — Addressed
09/19/2022
Permit issued — Sidewalk Shed
B00767230-I1-SH
08/05/2022
Objection resolved — Addressed
07/28/2022
Objection raised — Admin
07/28/2022
Objection resolved — Addressed
07/27/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00767230-I1
07/05/2022
Objection raised — Scope
07/05/2022
Objection raised — Scope
07/05/2022
Objection raised — Inspections
06/21/2022
Filed — Alteration
Demolition of rear two-story extension to comply with HPD emergency declaration
B00745538-I1
02/09/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/09/2022
Violation issued (ECB, closed)
Construction
02/08/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2021
Violation issued (ECB, open)
Unknown
08/28/2021
Violation issued (ECB, closed)
Construction
06/11/2021
Violation issued (ECB, closed)
Construction
06/11/2021
Violation issued (ECB, closed)
Construction
02/22/2021
Violation issued (ECB, closed)
Construction
02/22/2021
Violation issued (ECB, open)
Construction
01/20/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2020
Violation issued (ECB, open)
Construction
10/22/2020
Violation issued (ECB, open)
Construction
03/13/2020
Violation issued (ECB, closed)
Construction
03/04/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/05/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/09/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2019
Violation issued (ECB, open)
Construction
11/21/2019
Violation issued (ECB, open)
Construction
11/14/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2019
Violation issued (ECB, open)
Construction
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGRANITE ENVIRONMENT, LLC10/17/2022
DOB NOWConstruction FenceSigned-offGRANITE ENVIRONMENT, LLC10/17/2022
DOB NOWSidewalk ShedPermit IssuedEMPIRE CONSTRUCTION ASSOC09/19/2022
1 project · most recent 07/27/2022
Sidewalk Shed
FiledStatusContractorScope
07/27/2022Permit IssuedG.N. CONSTRUCTION INCSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/29/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/28/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/28/2026B00743330-I1Request digital key ↗
08/15/2026B00745538-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B00745538-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00745538-I1Open ↗
08/13/2026B00743330-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00745538-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00745538-I1Open ↗