← Back
BuildNYC
Two stories - detached, small or mid-size
125 KENSINGTON STREET
BROOKLYN · BIN 3246568
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3-1Zoning
2,056 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.34 FAR built · Flood zone X500
Locations of Work
MechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 31 filing · 15 docs
Floor 21 filing · 15 docs
Floor 11 filing · 15 docs
Site & exteriorConstruction fence installationUnder Construction7p · 1 filing · 2 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/02/2025$1.9M—Private party → Private party$900/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zproekt Architecture509/23/2026
Aryeh Siegel Architect108/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sken ServicesGeneral Contractor110/01/2026
Sapol ConstructionScaffold108/20/2026
Building Lifecycle
10/13/2026
Objection raised — Other
09/30/2026
Permit issued — Full Demolition
B01440317-I1-FD
09/23/2026
Filed — New Building
proposed Curb Cut in conjunction with NB
B01421325-S4
09/22/2026
Filed — New Building
proposed Curb Cut in conjunction with NB
B01421325-S3
09/22/2026
Filed — New Building
proposed Curb Cut in conjunction with NB
B01421325-S2
44 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionPermit IssuedSken Services09/30/2026
DOB NOWConstruction FencePermit IssuedSapol Construction08/19/2026
1 project · most recent 09/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/23/2026——Heating and Air Conditioning Systems
1 project · most recent 08/25/2026
General Wiring
FiledStatusContractorScope
08/25/2026Permit IssuedFalco Electrical ServicesGeneral Wiring
2 projects · most recent 09/23/2026
Fence
FiledStatusContractorScope
09/23/2026——Fence
08/11/2026Permit IssuedSapol ConstructionFence
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/23/2026Fire-Resistant Penetrations and Joints—special
07/23/2026HVAC-R and service water heating system controls—energy_progress
07/23/2026Maintenance information—energy_progress
07/23/2026Permanent certificate—energy_progress
07/23/2026Metering—energy_progress
07/23/2026HVAC-R and service water heating equipment—energy_progress
07/23/2026HVAC-R and service water piping design and insulation—energy_progress
07/23/2026Energy Code Compliance Inspections—progress
07/23/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
07/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/07/2026Subsurface Investigations (Borings/Test Pits)—special
06/30/2026Fire-Resistant Penetrations and Joints—special
06/30/2026Concrete - Cast-In-Place—special
06/30/2026Interior lighting power—energy_progress
06/30/2026Air barrier - visual inspection—energy_progress
06/30/2026Lighting controls—energy_progress
06/30/2026Exterior lighting power—energy_progress
06/30/2026Duct leakage testing, insulation and design—energy_progress
06/30/2026Maintenance information—energy_progress
06/30/2026HVAC-R and service water heating equipment—energy_progress
06/30/2026Metering—energy_progress
06/30/2026Permanent certificate—energy_progress
06/30/2026Electric vehicle service equipment requirements—energy_progress
06/30/2026Fenestration air leakage—energy_progress
06/30/2026Fenestration areas—energy_progress
Latest 25 of 40.
17 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account