Elevator apt, fireproof with stores
125 KINGS HIGHWAY
BROOKLYN · Gravesend (West) · BIN 3429013
💬 Discuss this project
2022Year Built
7Stories
D6Building Class
R7AZoning
52,448 sfGross Floor Area
62Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 125 KINGS LLC · 11,017 sf lot · 4.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof2p · 2 filings · 20 docs
Bulkhead3p · 3 filings · 19 docs
Floor 75p · 4 filings · 20 docs
Floor 65p · 4 filings · 20 docs
Floor 53p · 3 filings · 19 docs
Floor 42p · 2 filings · 13 docs
Floor 32p · 2 filings · 13 docs
Floor 22p · 2 filings · 13 docs
Floor 15p · 4 filings · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
125 KINGS4207/08/2026
OWNERS REP1007/08/2026
TARGET CONSTRUCTION103/22/2026
GETTY POWER TEST CORP103/22/2026
METRO ENVIRONMENTAL SERVICES103/21/2026
POWER TEST REALTY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/07/2022$3.5M—— → —$67/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATUXENT ENGINEERING1403/21/2026
EXPEDITER GROUP1003/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
ZAMBRANO ENTERPRISES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TARGET CONSTRUCTION LLCGeneral Contractor607/08/2026
ENDRE BANYAElectrical403/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
D & F CONSTRUCTION GROUPGeneral Contractor403/22/2026
TFK ELECTRIC CORP 004849General Contractor403/22/2026
EMPIRE PLUMBING INCPlumbing207/08/2026
PIPING & PLUMBING SOLUTIOFire Protection207/08/2026
PAUL LEFKOWITZElectrical103/21/2026
LESTER KATZElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394603/30/2022
Building Lifecycle
All (91)Filed (17)Permit Issued (10)Signed Off (9)Violation (23)Inspection (10)Objection (2)Special Inspection (20)
06/06/2026
Violation issued (HPD, closed)
C
05/25/2026
Violation issued (HPD, closed)
C
09/12/2025
Violation issued (HPD, closed)
B
09/12/2025
Violation issued (HPD, closed)
A
09/12/2025
Violation issued (HPD, closed)
B
09/03/2025
Violation issued (HPD, closed)
C
05/10/2025
Violation issued (HPD, closed)
B
05/10/2025
Violation issued (HPD, closed)
A
08/12/2023
Violation issued (HPD, closed)
C
08/12/2023
Violation issued (HPD, closed)
B
03/31/2023
Violation issued (HPD, closed)
A
03/28/2023
Violation issued (HPD, open)
C
03/28/2023
Violation issued (HPD, closed)
C
02/05/2023
Violation issued (HPD, closed)
A
02/05/2023
Violation issued (HPD, closed)
A
02/05/2023
Violation issued (HPD, closed)
C
02/05/2023
Violation issued (HPD, closed)
C
07/06/2022
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH NB#340752714
B00391195-I1
05/04/2022
Signed off — Alteration
PROPOSE SPRINKLER WORK AS PER PLAN IN CONJUNCTION WITH NB#340752714
B00391244-I1
05/03/2022
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
05/03/2022
Special inspection requirement — Sprinkler Systems
Paul Raymond
04/26/2022
Objection resolved — Addressed
04/14/2022
Objection raised — Scope
04/12/2022
Signed off — Alteration
B00390934-I1
03/30/2022
Signed off — Alteration
B00484662-I1
03/30/2022
Filed — Alteration
PROPOSE SPRINKLER WORK AS PER PLAN IN CONJUNCTION WITH NB#340752714
B00391244-P1
03/29/2022
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00587740-I1
03/21/2022
Signed off — Alteration
B00448272-I1
03/21/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/18/2022
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/18/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/18/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/16/2022
Signed off — Alteration
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00587747-I1
03/16/2022
Signed off — Alteration
B00402544-I1
03/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/15/2022
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
03/15/2022
Special inspection requirement — Maintenance information
Paul Raymond
03/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/15/2022
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
03/15/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
03/15/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
03/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
03/10/2022
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH NB#340752714
B00391195-P1
03/09/2022
Permit issued — Construction Fence
B00484662-I1-FN
03/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
03/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
03/04/2022
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
03/04/2022
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
03/04/2022
Special inspection requirement — Maintenance information
Paul Raymond
03/04/2022
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
02/23/2022
Permit issued — Mechanical Systems
B00390934-I1-MS
02/22/2022
Permit issued — Curb Cut
B00448272-I1-CC
01/20/2022
Permit issued — Sprinklers
B00391244-I1-EW-SP
01/19/2022
Permit issued — Plumbing
B00391195-I1-PL
12/28/2021
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLDING IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00587747-P3
12/28/2021
Special inspection requirement — Final
JOHN O'CONNOR, P.E.
12/21/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC03/09/2022
DOB NOWMechanical SystemsSigned-offTARGET CONSTRUCTION LLC02/23/2022
DOB NOWCurb CutSigned-offTARGET CONSTRUCTION LLC02/22/2022
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC01/20/2022
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC01/19/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC09/09/2021
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC09/02/2021
DOB NOWPlumbingSigned-offEMPIRE PLUMBING INC08/11/2021
DOB NOWSprinklersSigned-offEMPIRE PLUMBING INC08/11/2021
DOB NOWStructuralSigned-offTARGET CONSTRUCTION LLC08/04/2021
BIS—ISSUEDTARGET CONSTRUCTION LLC04/26/2021
BIS—ISSUEDTARGET CONSTRUCTION LLC04/26/2021
BISOTISSUEDTYREE ORGANIZATION02/18/2003
BISOTISSUEDLARRY E. TYREE, INC.02/26/1997
BISOTISSUEDLARRY E. TYREE, INC.08/05/1996
5 projects · most recent 09/20/2024
General Wiring
FiledStatusContractorScope
09/20/2024CompleteBLZ ELECTRIC INC.General Wiring
07/13/2022CompleteTFK ELECTRIC CORPGeneral Wiring
04/21/2022CompleteSTAR ELEC'L CONTRACTORS C—
09/13/2021CompleteV. VASS ELECTRIC CORP—
07/30/2021CompleteTFK ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/03/2022Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/21/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/18/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/18/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/18/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/21/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/13/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/19/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/03/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/03/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/03/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/03/2022Sprinkler SystemsPaul Raymondspecial
03/15/2022Energy Code Compliance InspectionsPaul Raymondprogress
03/15/2022Fire-Resistance Rated ConstructionPaul Raymondprogress
03/15/2022Maintenance informationPaul Raymondenergy_progress
03/15/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/15/2022HVAC insulation and sealing Paul Raymondenergy_progress
03/15/2022HVAC and service water heating equipment Paul Raymondenergy_progress
03/15/2022HVAC and service water heating system controls Paul Raymondenergy_progress
03/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
03/04/2022Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
03/04/2022Energy Code Compliance InspectionsPaul Raymondprogress
03/04/2022Fire-Resistance Rated ConstructionPaul Raymondprogress
03/04/2022HVAC insulation and sealing Paul Raymondenergy_progress
03/04/2022HVAC and service water heating equipment Paul Raymondenergy_progress
03/04/2022Maintenance informationPaul Raymondenergy_progress
03/04/2022HVAC and service water heating system controls Paul Raymondenergy_progress
12/28/2021FinalJOHN O'CONNOR, P.E.progress
11/26/2021FinalJOHN O'CONNOR, P.E.progress
▾Documents — 214 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch9
09/01/2026B00484662-I1Request digital key ↗
09/01/2026B00484662-P1Request digital key ↗
09/01/2026B00587740-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00391195-I1Request digital key ↗
09/02/2026B00391195-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00391244-I1Request digital key ↗
08/15/2026B00391244-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/01/2026B00448272-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/01/2026B00402544-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00390934-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00325168-I1Request digital key ↗
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION22
04/13/2022340752714Open ↗
03/31/2022340752714Open ↗
03/29/2022340752714Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION6
05/06/2021340752714Open ↗
05/06/2021340752714Open ↗
05/06/2021340752714Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
04/28/2021340801537Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
02/22/2022340752714Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/17/2022340752714Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
02/11/2021340752714Open ↗
01/14/2021340752714Open ↗
01/08/2021340752714Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/15/2020340752714Open ↗
▸BISVERIFY TAX LOT1
04/13/2022340752714Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/18/2022340752714Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
12/15/2020340752714Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00448272-I1Open ↗
09/01/2026B00484662-P1Open ↗
09/01/2026B00484662-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/27/2026B00587747-I1Open ↗
08/26/2026B00587740-I1Open ↗
08/25/2026B00391195-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026B00391244-I1Open ↗
08/28/2026B00391244-I1Open ↗
08/25/2026B00391195-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/06/2021340752714Open ↗
04/20/2021340752714Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
02/02/2021340801537Open ↗
09/09/2020340752714Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/09/2020340752714Open ↗
▸Trade Schedules & Equipment5
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
02/24/2022340752714Open ↗
09/09/2020340752714Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
03/29/2022340752714Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
01/13/2021340752714Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/18/2022340752714Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST5
09/22/2022340752714Open ↗
04/28/2021340801537Open ↗
02/03/2021340752714Open ↗
Showing 3 of 5 on file for this type
▸BISDOT APPROVAL FOR EXCAVATION BEYOND 3 FEET INTO PUBLIC RIGHT OF WAY1
03/23/2022340752714Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/28/2021340801537Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/28/2021340801537Open ↗
▸BISSTREET TREE SIGNOFF1
05/25/2022340752714Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
04/14/2022340752714Open ↗
▸Environmental & Asbestos12
▸DOB NOWOER: Notice to Proceed6
08/13/2026B00390934-I1Open ↗
08/13/2026B00391244-P1Open ↗
08/13/2026B00391244-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026B00402544-I1Open ↗
08/13/2026B00391195-I1Open ↗
08/13/2026B00390934-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
02/03/2021340752714Open ↗
02/02/2021340801537Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
07/01/2022340752714Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/20/2022340752714Open ↗
04/06/2022340752714Open ↗
04/06/2022340752714Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/06/2021340752714Open ↗
05/06/2021340752714Open ↗
04/20/2021340752714Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00391195-I1Open ↗
08/13/2026B00390934-I1Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
04/14/2022340752714Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
04/14/2022340752714Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/09/2020340752714Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/06/2022340752714Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00390934-I1Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY11
07/20/2022340752714Open ↗
04/06/2022340752714Open ↗
04/06/2022340752714Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
12/10/2021340752714Open ↗
11/22/2021340752714Open ↗
11/09/2021340752714Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
02/03/2021340752714Open ↗
02/03/2021340752714Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/29/2022340752714Open ↗
05/06/2021340752714Open ↗
▸BISSUBSURFACE / SOILS-FILL PLACEMENT IN-PLACE DENSITY1
04/14/2022340752714Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
04/14/2022340752714Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/20/2021340752714Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
04/14/2022340752714Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/14/2022340752714Open ↗
▸BISSOIL REPORT1
02/03/2021340752714Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
04/20/2021340752714Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
02/17/2022340752714Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLETTERS - SUPPORTING DOCUMENTATION12
07/06/2021340752714Open ↗
07/06/2021340752714Open ↗
07/06/2021340752714Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
04/13/2022340752714Open ↗
03/29/2022340752714Open ↗
03/28/2022340752714Open ↗
Showing 3 of 10 on file for this type
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/20/2021340752714Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
09/22/2022340752714Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/06/2021340752714Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION8
07/21/2022340752714Open ↗
07/18/2022340801537Open ↗
04/14/2022340752714Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/02/2021340801537Open ↗
09/09/2020340752714Open ↗
▸BISBOROUGH INTAKE FORM1
04/20/2021340752714Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/28/2021340801537Open ↗
▸BISEFILING COVER SHEET1
10/07/2020340752714Open ↗
▸Other Documents8
▸BISPLOT DIAGRAM3
12/15/2020340752714Open ↗
11/13/2020340752714Open ↗
09/09/2020340752714Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/19/2022340752714Open ↗
04/28/2021340801537Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
01/13/2021340752714Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
04/14/2022340752714Open ↗
▸BISUNDERPINNING1
04/14/2022340752714Open ↗