← Back
Two family brick
125 MARTENSE STREET
BROOKLYN · BIN 3116796
💬 Discuss this project
1901Year Built
2Stories
B1Building Class
R7-1Zoning
2,144 sfGross Floor Area
2Units
Rent Stabilized24 Open Violations 23 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · Owner of record: HSK 125 MARTENSE LLC · 2,600 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
StructuralFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 20 docs
Floor 7Under Construction9p · 2 filings · 20 docs
Floor 6Under Construction8p · 1 filing · 14 docs
Floor 5Under Construction10p · 2 filings · 20 docs
Floor 4Under Construction8p · 1 filing · 14 docs
Floor 3Under Construction9p · 2 filings · 20 docs
Floor 2Under Construction9p · 1 filing · 14 docs
Floor 1Under Construction8p · 1 filing · 14 docs
CellarUnder Construction9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSK MANAGEMENT6609/20/2026
ACE MAINTENANE USA LLC1003/22/2026
HOLLYWOOD CONS GROUP203/22/2026
HIGHLINE DEVELOPERS NY403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2020$1.1M—GPK PLG ONE LLC → HSK 125 MARTENSE LLC$513/sf building
02/21/2018$1.1M—Private party → GPK PLG ONE LLC$522/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1003/21/2026
NY DOB PERMITS403/21/2026
NYC PERMIT SERVICES203/21/2026
EMPIRE EXPEDITING203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HSK MANAGEMENT INCGeneral Contractor2907/08/2026
ACE MAINTENANCE USA LLCGeneral Contractor1107/08/2026
HOLLYWOOD CONS. GROUP INCGeneral Contractor303/21/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
ALFRED ARCHITECTUREGeneral Contractor203/22/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
ARCO PLBG AND HTG INCFire Protection107/04/2026
PRIME PIPING & HEATING INFire Protection107/04/2026
GWT ENTERPRISES INCGeneral Contractor104/09/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM ENGINEERING, LLC15141006/02/2026
Building Lifecycle
All (159)Filed (15)Permit Issued (21)Signed Off (7)Violation (59)Inspection (11)Objection (16)Special Inspection (30)
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
C
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
A
07/15/2026
Violation issued (HPD, open)
A
07/09/2026
Violation issued (ECB, open)
Elevators
06/21/2026
Violation issued (HPD, open)
C
06/17/2026
Violation issued (HPD, closed)
B
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/17/2026
Violation issued (HPD, open)
A
06/02/2026
Filed — Alteration
INSTALLATION OF FULLY SPRINKLER SYSTEM AS REQUIRED PER APPLICATION NO CHANGE IN USE, OCCUPANCY & EGRESS.
B00674415-P5
05/28/2026
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
05/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
05/28/2026
Special inspection requirement — Post-installed Anchors
RAUL VELASQUEZ MARTINEZ
05/28/2026
Special inspection requirement — Seismic Isolation Systems
RAUL VELASQUEZ MARTINEZ
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Filed — Alteration
INSTALLATION OF FULLY SPRINKLER SYSTEM AS REQUIRED PER APPLICATION NO CHANGE IN USE, OCCUPANCY & EGRESS.
B00674415-P4
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAUL VELASQUEZ MARTINEZ
04/01/2026
Special inspection requirement — Post-installed Anchors
RAUL VELASQUEZ MARTINEZ
04/01/2026
Special inspection requirement — Seismic Isolation Systems
RAUL VELASQUEZ MARTINEZ
04/01/2026
Special inspection requirement — Sprinkler Systems
RAUL VELASQUEZ MARTINEZ
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/21/2026
Signed off — Alteration
B00782301-I1
12/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/01/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/26/2025
Permit issued — Sprinklers
B00674415-I1-EW-SP
11/20/2025
Signed off — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION # 340761544
B00547916-S2
11/17/2025
Objection resolved — Addressed
10/23/2025
Permit issued — Plumbing
B00547916-S2-PL
09/18/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/12/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Violation issued (ECB, closed)
Unknown
09/12/2025
Violation issued (ECB, closed)
Unknown
09/12/2025
Violation issued (ECB, closed)
Construction
09/12/2025
Violation issued (ECB, closed)
Construction
09/11/2025
Violation issued (ECB, closed)
Construction
09/11/2025
Violation issued (ECB, closed)
Site Safety
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
07/30/2025
Signed off — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION # 340761544
B00547916-I1
07/30/2025
Permit issued — General Construction
B00547916-I1-GC-CX
07/29/2025
Objection raised — Scope
07/29/2025
Objection raised — Plumbing
07/29/2025
Objection raised — Fire_Protection
Latest 60 of 159 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedARCO PLBG AND HTG INC11/26/2025
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING10/23/2025
DOB NOWGeneral ConstructionSigned-offACE MAINTENANCE USA LLC07/30/2025
DOB NOWConstruction FenceSigned-offACE MAINTENANCE USA LLC04/05/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC01/09/2024
DOB NOWConstruction FenceSigned-offHOLLYWOOD CONS. GROUP INC09/22/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES07/26/2023
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC07/06/2023
DOB NOWFoundationSigned-offHSK MANAGEMENT INC06/21/2023
DOB NOWFoundationSigned-offHSK MANAGEMENT INC06/21/2023
DOB NOWStructuralSigned-offHSK MANAGEMENT INC05/26/2023
DOB NOWConstruction FenceSigned-offHSK MANAGEMENT INC05/23/2023
DOB NOWStructuralSigned-offHSK MANAGEMENT INC05/09/2023
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY02/01/2023
DOB NOWMechanical SystemsSigned-offHSK MANAGEMENT INC01/31/2023
DOB NOWGeneral ConstructionSigned-offHSK MANAGEMENT INC12/09/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/01/2022
DOB NOWConstruction FenceSigned-offHSK MANAGEMENT INC05/19/2022
DOB NOWSupport of ExcavationSigned-offHSK MANAGEMENT INC07/19/2021
DOB NOWConstruction FenceSigned-offHSK MANAGEMENT INC07/13/2021
DOB NOWGeneral ConstructionSigned-offHSK MANAGEMENT INC07/07/2021
BIS—ISSUEDACE MAINTENANCE USA LLC07/24/2025
BIS—ISSUEDACE MAINTENANCE USA LLC07/24/2025
BIS—ISSUEDACE MAINTENANCE USA LLC07/10/2025
BIS—ISSUEDACE MAINTENANCE USA LLC08/08/2024
BIS—ISSUEDACE MAINTENANCE USA LLC07/29/2024
BIS—ISSUEDHOLLYWOOD CONS. GROUP INC11/13/2023
BIS—ISSUEDHOLLYWOOD CONS. GROUP INC08/25/2023
1 project · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026Permit IssuedARCO PLBG AND HTG INC216 heads
1 project · most recent 06/02/2026
FiledStatusContractorScope
06/02/2026———
3 projects · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026Permit IssuedB.P. ELECTRIC CORPGeneral Wiring
01/29/2024Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
07/23/2022CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Fail-Final CND-Occupancy InspectionFailView ↗
12/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/29/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/03/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/22/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
05/28/2026Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
05/28/2026Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
05/28/2026Post-installed AnchorsRAUL VELASQUEZ MARTINEZspecial
05/28/2026Seismic Isolation SystemsRAUL VELASQUEZ MARTINEZspecial
04/01/2026Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/01/2026Post-installed AnchorsRAUL VELASQUEZ MARTINEZspecial
04/01/2026Seismic Isolation SystemsRAUL VELASQUEZ MARTINEZspecial
04/01/2026Sprinkler SystemsRAUL VELASQUEZ MARTINEZspecial
07/22/2025Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
07/22/2025Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
07/22/2025FinalRAUL VELASQUEZ MARTINEZprogress
07/10/2025Mechanical SystemsRAUL VELASQUEZ MARTINEZspecial
07/10/2025Energy Code Compliance Inspections—progress
07/10/2025FinalRAUL VELASQUEZ MARTINEZprogress
12/15/2021Post-installed AnchorsRAUL VELASQUEZ MARTINEZspecial
12/15/2021Subsurface Conditions – Fill Placement & In-Place DensityRAUL VELASQUEZ MARTINEZspecial
12/15/2021Footing and FoundationRAUL VELASQUEZ MARTINEZprogress
12/15/2021FinalRAUL VELASQUEZ MARTINEZprogress
12/15/2021Structural Steel - High Strength BoltingRAUL VELASQUEZ MARTINEZspecial
12/15/2021Structural Stability – Alterations of existing buildingsRAUL VELASQUEZ MARTINEZspecial
12/15/2021Structural Steel - WeldingRAUL VELASQUEZ MARTINEZspecial
12/15/2021Excavations - Sheeting, Shoring, and BracingRAUL VELASQUEZ MARTINEZspecial
12/15/2021Concrete - Cast-In-PlaceRAUL VELASQUEZ MARTINEZspecial
12/15/2021Structural Cold-Formed SteelRAUL VELASQUEZ MARTINEZspecial
12/15/2021Subgrade InspectionsRAUL VELASQUEZ MARTINEZspecial
Latest 25 of 50.
▾Documents — 240 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00547916-P2Request digital key ↗
09/01/2026B00547916-P1Request digital key ↗
09/01/2026B00547916-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION20
02/19/2026340896070Open ↗
02/11/2026340896070Open ↗
07/30/2025340840139Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION5
07/25/2025340761544Open ↗
07/25/2025340761544Open ↗
07/11/2025340761544Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
09/10/2025340896070Open ↗
01/18/2024340896070Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/09/2025340761544Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature16
09/24/2026B00674415-P5Open ↗
09/02/2026B00547916-P4Open ↗
09/02/2026B00547916-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00547916-P2Open ↗
09/01/2026B00547916-P1Open ↗
09/01/2026B00547916-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B00547916-P4Open ↗
09/02/2026B00547916-P1Open ↗
09/02/2026B00547916-S3Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
11/01/2023340896070Open ↗
06/16/2022340840139Open ↗
01/15/2021340761544Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/01/2023340896070Open ↗
06/16/2022340840139Open ↗
01/15/2021340761544Open ↗
▸Trade Schedules & Equipment5
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
10/26/2023340761544Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
11/01/2023340896070Open ↗
03/16/2022340761544Open ↗
01/15/2021340761544Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/17/2023340761544Open ↗
▸BISSTREET TREES SITE PLAN1
01/18/2024340896070Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00547916-P4Open ↗
09/01/2026B00547916-P1Open ↗
09/01/2026B00547916-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/19/2021340761544Open ↗
01/15/2021340761544Open ↗
08/19/2019321387511Open ↗
▸Energy Compliance24
▸BISINTERIOR LIGHTING POWER3
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/17/2023340761544Open ↗
12/08/2021340761544Open ↗
01/15/2021340761544Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISEXTERIOR LIGHTING POWER2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFENESTRATION AREAS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFENESTRATION AIR LEAKAGE2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISLIGHTING CONTROLS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/23/2025340761544Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/22/2025340761544Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY5
08/17/2023340761544Open ↗
03/28/2022340761544Open ↗
03/28/2022340761544Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISMASONRY2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/28/2022340761544Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/24/2023340761544Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/28/2022340761544Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
08/17/2023340761544Open ↗
▸Approvals, Objections & Sign-offs14
▸BISSCHEDULE A - OCCUPANCY / USE8
02/09/2024340761544Open ↗
02/07/2024340761544Open ↗
05/02/2022340761544Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/25/2025340761544Open ↗
07/11/2025340761544Open ↗
07/26/2024340761544Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE4
07/30/2024340761544Open ↗
08/25/2023340761544Open ↗
08/25/2023340761544Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
07/25/2025340761544Open ↗
07/30/2024340761544Open ↗
08/25/2023340761544Open ↗
▸BISCOST AFFIDAVIT3
06/23/2025340761544Open ↗
06/18/2025340761544Open ↗
03/16/2022340761544Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/11/2025340761544Open ↗
▸Filing & Intake Forms19
▸BISADDITIONAL INFORMATION11
07/25/2025340761544Open ↗
05/31/2024340896070Open ↗
03/01/2024340896070Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/01/2023340896070Open ↗
06/16/2022340840139Open ↗
01/15/2021340761544Open ↗
▸BISEFILING COVER SHEET3
12/13/2019321387511Open ↗
06/07/2019321387511Open ↗
06/01/2019321387511Open ↗
▸BISBOROUGH INTAKE FORM1
07/30/2024340761544Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/30/2023340896070Open ↗
▸Other Documents23
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/25/2025340761544Open ↗
07/25/2025340761544Open ↗
07/11/2025340761544Open ↗
Showing 3 of 5 on file for this type
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSHUTOFF DAMPERS2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISUNDERPINNING (2014)2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
03/01/2024340896070Open ↗
01/25/2024340896070Open ↗
▸BISMAINTENANCE INFORMATION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISLOWEST FLOOR ELEVATION2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL2
07/23/2025340761544Open ↗
07/23/2025340761544Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/22/2022340761544Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00547919-I1Open ↗