← Back
Elevator apt, fireproof with stores
125 RIVERSIDE DRIVE
MANHATTAN · BIN 1033838
💬 Discuss this project
1907Year Built
12Stories
D6Building Class
R10AZoning
70,328 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized28 Open Violations 21 unresolved · 7 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof with stores · Owner of record: AYA BSD CAPITAL LLC · 8,800 sf lot · 7.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof8p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Floor 1213p · 5 filings · 20 docs
Floor 1113p · 4 filings · 20 docs
Floor 1012p · 4 filings · 20 docs
Floor 912p · 5 filings · 20 docs
Floor 83p · 1 filing · 20 docs
Floor 75p · 2 filings · 20 docs
Floor 612p · 3 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 411p · 2 filings · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 220p · 5 filings · 20 docs
Floor 14p · 3 filings · 20 docs
Cellar5p · 2 filings · 20 docs
2 jobs · most recent 06/12/2025
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/12/2025——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2 48,000 BTU · Split System ×2
PEFY-P12NMAU-E4 12,000 BTU · Vrf Indoor ×1
PEFY-P18NMAU-E4 18,000 BTU · Vrf Indoor ×1
PEFY-P30NMAU-E4 30,000 BTU · Vrf Indoor ×1
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1
07/12/2023Signed-offARDEL CONSTRUCTION & DESIAir Conditioning Systems
Cooling
Lg ARUN060GSS4 64,000 BTU · Vrf Outdoor ×3
4 jobs · most recent 06/12/2025
Water/Sanitary Gas
FiledStatusContractorScope
06/12/2025——Water/Sanitary
11/04/2024Permit IssuedT & T PLUMBING INCGas, Water/Sanitary
07/12/2023Permit IssuedS & J INDUSTRIAL CORPWater/Sanitary
11/26/2019Permit IssuedORBIT PLBG & HTG INCWater/Sanitary
8 jobs · most recent 09/11/2024
General Wiring
FiledStatusContractorScope
09/11/2024Permit IssuedAUJLA ELECTRIC CORP—
04/08/2023Permit IssuedM&T ELECTRICAL LLCGeneral Wiring
01/18/2023Permit IssuedBDS ELECTRIC CORP.—
12/01/2021Permit IssuedM&T ELECTRICAL LLC3 meters, 3 new_meters
07/26/2019Permit IssuedDENNISON ELECTRIC CORPGeneral Wiring
07/26/2019Permit IssuedDENNISON ELECTRIC CORPGeneral Wiring
06/28/2019Permit IssuedRICHARD NEU—
05/14/2019CompleteGOTHAM WIRING LICENSED60 meters, 1 new_meters
1 job · most recent 06/12/2025
Steel
FiledStatusContractorScope
06/12/2025——Steel
4 jobs · most recent 04/17/2024
Sidewalk Shed Scaffold
FiledStatusContractorScope
04/17/2024Permit IssuedSKYVIEW DEVELOPERS GROUPSidewalk Shed
09/29/2022Permit IssuedSHALBRO CONSTRUCTION GROUScaffold
09/29/2021Permit IssuedSHALBRO CONSTRUCTION GROUSidewalk Shed
03/03/2021Permit IssuedSHALBRO CONSTRUCTION GROUSidewalk Shed
2 jobs · most recent 08/15/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/15/2024Permit IssuedSAFECORE DEVELOPERS LLCSuspended Scaffold (SC)
02/24/2024Permit IssuedSHALLU CONSTRUCTION CORPSuspended Scaffold (SC)
Building Lifecycle
All (260)Filed (38)Permit Issued (34)Signed Off (4)Facade (FISP) (29)Violation (60)Inspection (11)Objection (54)Special Inspection (30)
06/17/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/09/2026
Violation issued (ECB, closed)
Construction
06/09/2026
Violation issued (ECB, closed)
Construction
05/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/09/2026
Violation issued (ECB, closed)
Construction
04/09/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2026
Permit issued — Sidewalk Shed
M01010387-I1-SH
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
C
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
C
10/22/2025
Violation issued (HPD, closed)
B
10/22/2025
Violation issued (HPD, closed)
B
10/08/2025
Cycle 9 facade report submitted
10/03/2025
Cycle 9 facade report signed — UNSAFE
09/23/2025
Violation issued (HPD, closed)
C
09/23/2025
Violation issued (HPD, closed)
C
09/04/2025
Cycle 9 facade inspection completed
09/04/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
08/18/2025
Objection resolved — Addressed
08/13/2025
Signed off — Alteration
FILING TO AMEND THE PLAN.
M00603030-I1
08/08/2025
Cycle 9 facade report submitted
08/08/2025
Special inspection requirement — Air barrier continuity plan testing
08/05/2025
Cycle 10 facade report signed — UNSAFE
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/25/2025
Cycle 10 facade report submitted
07/22/2025
Special inspection requirement — Lighting in dwelling units
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/17/2025
Cycle 9 facade inspection completed
07/17/2025
Special inspection requirement — Interior lighting power
07/17/2025
Special inspection requirement — Exterior lighting power
07/17/2025
Special inspection requirement — Lighting controls
07/16/2025
Special inspection requirement — Fenestration areas
07/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/07/2025
Objection resolved — Addressed
07/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Latest 60 of 260 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHALBRO CONSTRUCTION GROUP3507/08/2026
THOR-GO 120-125 RIVERSIDE, LLC10707/08/2026
SAFECORE DEVELOPERS LLC503/22/2026
AYA BSD CAPITAL703/22/2026
SOHO CONTRACTING603/22/2026
ARNAV INDUSTRIES803/22/2026
LYNDONVILLE PROPERTIES MG403/22/2026
ARNAU INDUSTRIES INC.103/22/2026
ISSAAC FREDWAN / OWNER 1B103/22/2026
ISSAAC FREIDMAN OWNER 1B103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORE CONSULTANTS NYC903/21/2026
ATELIER NEW YORK ARCHITECTURE403/21/2026
DSENY ENGINEERING SERVICES803/21/2026
JM ZONING, LLC.803/21/2026
ATLANTIC BUILDING SUPPLY INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHALBRO CONSTRUCTION GROUPGeneral Contractor3307/08/2026
ARDEL CONSTRUCTION & DESIGNGeneral Contractor1503/21/2026
TRI CONTRACTING INCGeneral Contractor303/21/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
M&T ELECTRICAL LLCElectrical203/22/2026
MICHAEL OLIVOElectrical103/21/2026
MUSCARELLA, JAMESElectrical103/21/2026
PAUL LEFKOWITZElectrical103/21/2026
SALVATORE FILOTEOElectrical103/21/2026
SILVER, HUGHElectrical103/21/2026
SITRUK, MAURICEElectrical103/21/2026
STACHURSKI, RICHARDElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
TOG CONSTRUCTION CORPElectrical103/21/2026
TOUEY, CHRISTOPHERElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
REDIRECTING LIC INCGeneral Contractor107/08/2026
SKYVIEW DEVELOPERS GROUPGeneral Contractor107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
S & J INDUSTRIAL CORPPlumbing107/08/2026
BECKER, CHARLESElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ATELIER NY ARCHITECTURE2438411/04/2024
BUTTERFIELD & O'CONNOR4189202/24/2024
HIGHRISE GROUP NYC, INC6753507/12/2023
ALL CITY ENGINEERING PC7115605/16/2023
STREET CONSULTING ENGINEE4259202/08/2023
PHILIBERT ENGINEERING, PC223201/11/2023
RICHARD H. BALSER ENGINEE3028209/29/2022
GRASSO-MENZIUSO ARCHITECT1279211/26/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSKYVIEW DEVELOPERS GROUP01/08/2026
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU02/06/2025
DOB NOWSupported ScaffoldPermit IssuedSHALBRO CONSTRUCTION GROU02/04/2025
DOB NOWSupported ScaffoldSigned-offSHALBRO CONSTRUCTION GROU09/11/2024
DOB NOWSuspended ScaffoldPermit IssuedSAFECORE DEVELOPERS LLC08/19/2024
DOB NOWPlumbingPermit IssuedT & T PLUMBING INC07/24/2024
DOB NOWGeneral ConstructionPermit IssuedREDIRECTING LIC INC06/25/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYRISE MANAGEMENT CORP05/01/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYRISE MANAGEMENT CORP03/08/2024
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU02/27/2024
DOB NOWSuspended ScaffoldPermit IssuedSKYRISE MANAGEMENT CORP02/21/2024
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/08/2024
DOB NOWSupported ScaffoldPermit IssuedSHALBRO CONSTRUCTION GROU01/08/2024
DOB NOWGeneral ConstructionSigned-offARDEL CONSTRUCTION & DESI01/12/2023
DOB NOWSupported ScaffoldPermit IssuedSHALBRO CONSTRUCTION GROU01/11/2023
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/11/2023
DOB NOWMechanical SystemsSigned-offARDEL CONSTRUCTION & DESI08/22/2022
DOB NOWPlumbingSigned-offANTHONY DISABATO07/25/2022
DOB NOWGeneral ConstructionSigned-offARDEL CONSTRUCTION & DESI07/07/2022
DOB NOWPlumbingPermit IssuedS & J INDUSTRIAL CORP06/08/2022
DOB NOWMechanical SystemsSigned-offARDEL CONSTRUCTION & DESI05/23/2022
DOB NOWGeneral ConstructionSigned-offARDEL CONSTRUCTION & DESI05/17/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedSHALBRO CONSTRUCTION GROU02/25/2022
DOB NOWSupported ScaffoldPermit IssuedSHALBRO CONSTRUCTION GROU02/04/2022
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/01/2022
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU09/30/2021
DOB NOWSupported ScaffoldSigned-offSHALBRO CONSTRUCTION GROU09/30/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO07/27/2021
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/15/2021
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU04/01/2020
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU01/07/2020
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/18/2019
DOB NOWMechanical SystemsPermit IssuedTRI CONTRACTING INC12/06/2019
DOB NOWSidewalk ShedPermit IssuedSHALBRO CONSTRUCTION GROU07/01/2019
BISOTISSUEDSHALBRO CONSTRUCTION GROUP02/05/2025
BISEQISSUEDSHALBRO CONSTRUCTION GROUP04/19/2024
BISOTISSUEDSHALBRO CONSTRUCTION GROUP01/08/2024
BISOTISSUEDSHALBRO CONSTRUCTION GROUP01/12/2023
BISOTISSUEDSHALBRO CONSTRUCTION GROUP04/01/2022
BISOTISSUEDSHALBRO CONSTRUCTION GROUP03/15/2021
+ 44 more permits on file
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/18/2023No Access-Final PL - More than 10 Requested FloorsNo AccessView ↗
01/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/08/2025Air barrier continuity plan testing—energy_progress
07/22/2025Lighting in dwelling units—energy_progress
07/17/2025Interior lighting power—energy_progress
07/17/2025Exterior lighting power—energy_progress
07/17/2025Lighting controls—energy_progress
07/16/2025Fenestration areas—energy_progress
07/16/2025Structural Stability – Alterations of existing buildings—special
07/03/2025Fenestration and door U-factor and product ratings—energy_progress
07/03/2025Insulation placement and R values—energy_progress
07/03/2025Fenestration air leakage—energy_progress
07/03/2025Air barrier — testing —energy_progress
11/04/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
10/04/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
07/31/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
06/05/2024Tenant Protection Plan ComplianceAnatole Plotkinspecial
06/05/2024Energy Code Compliance InspectionsAnatole Plotkinprogress
06/05/2024Fire-Resistant Penetrations and JointsAnatole Plotkinspecial
06/05/2024FinalAnatole Plotkinprogress
06/05/2024Lighting in dwelling unitsAnatole Plotkinenergy_progress
06/05/2024Fire-Resistance Rated ConstructionAnatole Plotkinprogress
03/08/2024Post-installed AnchorsBRIAN T. O'CONNORspecial
03/08/2024Alternative Materials - OTCR Buildings Bulletin NumberBRIAN T. O'CONNORspecial
07/14/2023Energy Code Compliance InspectionsSandeep Gunnalaprogress
07/14/2023Mechanical SystemsSandeep Gunnalaspecial
07/14/2023FinalSandeep Gunnalaprogress
Latest 25 of 49.
▾Documents — 853 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch33
09/03/2026M00521190-I1Request digital key ↗
09/03/2026M00603012-I1Request digital key ↗
09/03/2026M00603030-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00194770-I1Request digital key ↗
09/05/2026M00194770-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00194805-P1Request digital key ↗
08/14/2026M00194805-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00186443-I1Request digital key ↗
▸Applications & Permits194
▸BISPLAN / WORK APPROVAL APPLICATION94
11/26/2024122895457Open ↗
06/25/2024122895457Open ↗
04/17/2024141025780Open ↗
Showing 3 of 94 on file for this type
▸BISWORK PERMIT APPLICATION79
04/19/2024141025780Open ↗
01/06/2020122895457Open ↗
12/06/2019123812650Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWLPC Approval/Permit21
09/05/2026M00194805-P1Open ↗
09/03/2026M00521190-I1Open ↗
08/26/2026M01061823-P1Open ↗
Showing 3 of 21 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISRESTRICTION: EASEMENT AGREEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01104518-I1Open ↗
▸Seals & Professional Certifications201
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION89
11/27/2019123697918Open ↗
11/22/2019123697927Open ↗
11/13/2019123812650Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/05/2026M00194805-P1Open ↗
09/05/2026M00194805-I1Open ↗
09/03/2026M00521190-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/21/2026M00649501-P1Open ↗
09/21/2026M00649501-P1Open ↗
09/19/2026M00649501-S2Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
04/17/2024141025780Open ↗
03/23/2023141022970Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00649501-I1Open ↗
09/01/2026M00649501-I1Open ↗
08/27/2026M00649501-S1Open ↗
Showing 3 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
04/17/2024141025780Open ↗
03/23/2023141022970Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
04/17/2024141025780Open ↗
03/23/2023141022970Open ↗
Showing 2 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment34
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
11/13/2019122081905Open ↗
05/31/2019123892797Open ↗
05/31/2019123872407Open ↗
Showing 3 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection32
▸BISTenant Protection Plan and Notes18
11/27/2019123697918Open ↗
11/22/2019123697927Open ↗
08/05/2019123812650Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWTenant Protection Plan5
09/05/2026M00194805-P1Open ↗
08/14/2026M00194805-I1Open ↗
08/13/2026M00186443-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
04/19/2024141025780Open ↗
03/27/2024141022970Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01104518-I1Open ↗
▸Environmental & Asbestos56
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/05/2026M00194805-P1Open ↗
09/03/2026M00521190-I1Open ↗
09/02/2026M00649501-S2Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)22
12/06/2019123812650Open ↗
12/05/2019123812650Open ↗
06/07/2019123892797Open ↗
Showing 3 of 22 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance63
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
12/31/2020122909004Open ↗
Showing 1 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/22/2025122895457Open ↗
11/26/2024122895457Open ↗
06/17/2024122895457Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE4
07/29/2019123900608Open ↗
07/24/2019123900644Open ↗
07/03/2019123872407Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00649501-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY15
04/02/2025122895457Open ↗
04/01/2025122895457Open ↗
11/26/2024122895457Open ↗
Showing 3 of 15 on file for this type
▸Approvals, Objections & Sign-offs57
▸BISLANDMARKS APPROVAL25
04/17/2024141025780Open ↗
03/23/2023141022970Open ↗
12/03/2019123900608Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
12/31/2020122909004Open ↗
07/26/2019121287829Open ↗
07/26/2019123303889Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER6
12/04/2019123900608Open ↗
12/04/2019123737457Open ↗
12/04/2019123900644Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLANDMARKS SIGNOFF1
12/31/2020122909004Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership62
▸BISCOST AFFIDAVIT54
11/26/2024122895457Open ↗
06/24/2024122895457Open ↗
06/17/2024122895457Open ↗
Showing 3 of 54 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms82
▸BISEFILING COVER SHEET37
11/27/2019123697918Open ↗
11/22/2019123697927Open ↗
08/05/2019123812650Open ↗
Showing 3 of 37 on file for this type
▸BISADDITIONAL INFORMATION20
11/18/2024122895457Open ↗
06/27/2024122895457Open ↗
11/23/2021122895457Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM19
12/05/2019123812650Open ↗
11/13/2019122876138Open ↗
11/13/2019122081905Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
04/17/2024141025780Open ↗
03/23/2023141022970Open ↗
Showing 2 of 6 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01095653-I1Open ↗
08/13/2026M01003557-I1Open ↗
08/13/2026M01003557-P1Open ↗
▸DOB NOWCalculations3
08/13/2026M01003557-I1Open ↗
08/13/2026M01003557-P1Open ↗
08/13/2026M01095653-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026M01104518-I1Open ↗
▸DOB NOWDoc 11
08/13/2026M00186443-P1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M01104518-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01104518-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01104518-I1Open ↗