← Back
Three families
125 WASHINGTON AVENUE
BROOKLYN · BIN 3054429
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6BZoning
2,400 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
Architecture
Roof5p · 1 filing · 10 docs
Floor 12p · 1 filing · 12 docs
Basement2p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/14/2025$2.1M—— → —$881/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DENISE LEE ARCHITECT202/24/2026
TOM PETERSEN ARCHITECT, LLC201/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOUTIQKEY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR CONTRACTING LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899102/24/2026
THOMAS PETERSEN ARCHITECT7854201/14/2026
Building Lifecycle
All (44)Filed (4)Permit Issued (1)Signed Off (1)Violation (16)Objection (6)Special Inspection (16)
05/06/2026
Violation issued (HPD, closed)
A
05/01/2026
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
B01329232-I1
02/24/2026
Filed — Alteration
GENERAL CONSTRUCTION & MECHANICAL FOR THE RENOVATION OF EXISTING RESIDENTIAL DUPLEX APARTMENT ON BASEMENT AND FIRST FLOOR. WORK ON FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE OF ZONING, USE, EGRESS, OR OCCUPANCY.
B01350345-I1
02/24/2026
Filed — Alteration
GENERAL CONSTRUCTION & MECHANICAL FOR THE RENOVATION OF EXISTING RESIDENTIAL DUPLEX APARTMENT ON BASEMENT AND FIRST FLOOR. WORK ON FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE OF ZONING, USE, EGRESS, OR OCCUPANCY.
B01350345-S1
02/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
DENISE REO
02/18/2026
Special inspection requirement — Lighting in dwelling units
DENISE REO
02/18/2026
Special inspection requirement — Air barrier - visual inspection
DENISE REO
02/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
DENISE REO
02/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
DENISE REO
02/18/2026
Special inspection requirement — Maintenance information
DENISE REO
02/18/2026
Special inspection requirement — Fenestration areas
DENISE REO
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
DENISE REO
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
DENISE REO
02/03/2026
Permit issued — Solar
B01329232-I1-SL
01/30/2026
Objection resolved — Addressed
01/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
01/30/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
01/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
01/30/2026
Special inspection requirement — Final
TOM PETERSEN
01/29/2026
Objection raised — Admin
01/22/2026
Special inspection requirement — Mechanical Systems
ARIEL GOLSHAN
01/22/2026
Special inspection requirement — Final
DENISE REO
01/14/2026
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
B01329232-P1
12/30/2025
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/26/2025
Objection raised — Electrical
12/26/2025
Objection raised — Other
12/05/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONIC GENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS
B01329232-I1
06/11/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
04/12/2024
Violation issued (HPD, closed)
A
11/17/2023
Violation issued (HPD, closed)
I
03/27/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
I
03/02/2022
Violation issued (HPD, closed)
A
04/13/2021
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
A
10/31/2019
Violation issued (HPD, closed)
I
10/22/2018
Violation issued (HPD, closed)
I
11/16/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
02/25/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR CONTRACTING LLC02/03/2026
BIS—ISSUEDJANEN CONSTR & DEVELOPMNT LLC04/25/2008
BISEQISSUEDEVEREST SCAFFOLDING INC10/06/2005
1 project · most recent 02/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/24/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3D24NLHZ 2 tons · Condensing Unit ×1
SEZ-AD18NL 2 tons · Ahu ×1
SUZ-AA18NLHZ 2 tons · Condensing Unit ×1
SVZ-AP12NL 1 tons · Ahu ×1
SVZ-APNL 1 tons · Ahu ×1
1 project · most recent 02/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/24/2026——Gas, Water/Sanitary
2 projects · most recent 12/11/2025
FiledStatusContractorScope
12/11/2025CompleteSOLAR ELEC CONTRACTNG LLC3 meters
12/05/2025CompleteSOLAR ELEC CONTRACTNG LLC—
1 project · most recent 01/14/2026
FiledStatusContractorScope
01/14/2026Signed-offSOLAR CONTRACTING LLC32 panels, 13.76 kw, 809.77 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/18/2026HVAC-R and service water piping design and insulationDENISE REOenergy_progress
02/18/2026Lighting in dwelling unitsDENISE REOenergy_progress
02/18/2026Air barrier - visual inspectionDENISE REOenergy_progress
02/18/2026Duct leakage testing, insulation and designDENISE REOenergy_progress
02/18/2026Fenestration and door U-factor and product ratingsDENISE REOenergy_progress
02/18/2026Maintenance informationDENISE REOenergy_progress
02/18/2026Fenestration areasDENISE REOenergy_progress
02/18/2026Energy Code Compliance InspectionsDENISE REOprogress
02/18/2026Energy Code Compliance InspectionsDENISE REOprogress
01/30/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
01/30/2026Energy Code Compliance InspectionsTOM PETERSENprogress
01/30/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
01/30/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
01/30/2026FinalTOM PETERSENprogress
01/22/2026Mechanical SystemsARIEL GOLSHANspecial
01/22/2026FinalDENISE REOprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01329232-I1Request digital key ↗
08/19/2026B01329232-P1Request digital key ↗
08/18/2026B01350345-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
02/26/2009310085975Open ↗
01/05/2009310085975Open ↗
10/16/2008310085975Open ↗
▸BISWORK PERMIT APPLICATION2
07/01/2008310085975Open ↗
04/25/2008310085975Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/05/2008310085975Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature11
08/28/2026B01329232-I1Open ↗
08/28/2026B01329232-I1Open ↗
08/28/2026B01329232-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026B01329232-I1Open ↗
08/19/2026B01329232-P1Open ↗
08/18/2026B01350345-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01329232-I1Open ↗
08/28/2026B01329232-I1Open ↗
08/28/2026B01350345-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/18/2008310085975Open ↗
02/27/2008310085975Open ↗
▸BISPC FULL REPORT1
02/27/2008310085975Open ↗
▸Trade Schedules & Equipment6
▸BISWATER METER PERMIT : DEP-METER3
07/07/2009310085975Open ↗
01/21/2009310085975Open ↗
01/21/2009310085975Open ↗
▸BISSCHEDULE B - PLUMBING2
02/26/2009310085975Open ↗
10/16/2008310085975Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/31/2008310085975Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01329232-I1Open ↗
08/19/2026B01329232-P1Open ↗
08/18/2026B01350345-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/31/2008310085975Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/30/2009310085975Open ↗
10/06/2009310085975Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/14/2009310085975Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/16/2008310085975Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/31/2008310085975Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
01/21/2009310085975Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/19/2026B01329232-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/02/2009310085975Open ↗
04/25/2008310085975Open ↗