← Back
Two family brick
125 WEST 119 STREET
MANHATTAN · Harlem (South) · BIN 1057547
💬 Discuss this project
1896Year Built
3Stories
B1Building Class
R7-2Zoning
4,980 sfGross Floor Area
2Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Two family brick · 2,018 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionLandscape
Roof29p · 1 filing · 20 docs
Floor 350p · 3 filings · 20 docs
Floor 251p · 3 filings · 20 docs
Floor 155p · 3 filings · 20 docs
Cellar57p · 4 filings · 20 docs
Basement27p · 1 filing · 20 docs
Sub-Basement22p · 2 filings · 20 docs
Site & exterior1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN P. FOX, ARCHITECT, PC.806/10/2024
CHOSEN MEP, CORP.301/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORNERSTONE CONSULTING1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H B H CONSTRUCTION INCGeneral Contractor603/21/2026
ENERGY BUILDING CONSTRUCTGeneral Contractor203/21/2026
MECHANICAL CONST SYS CORPElectrical103/22/2026
PRECISION SPKLR SVCS LLCFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANS CONSULTANTS, INC.1768306/10/2024
O'ROURKE ENGINEERING, LLC58731006/10/2024
Building Lifecycle
All (108)Filed (10)Permit Issued (5)Signed Off (3)Violation (24)Inspection (10)Objection (26)Special Inspection (30)
04/29/2026
Violation issued (HPD, closed)
A
06/04/2025
Violation issued (HPD, closed)
A
11/22/2024
Violation issued (HPD, closed)
I
08/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2024
Special inspection requirement — Lighting in dwelling units
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Lighting controls
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Air barrier - visual inspection
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Final
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ATULKUMAR SHAH, PE
07/07/2024
Special inspection requirement — Fenestration air leakage
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN O'ROURKE
07/07/2024
Special inspection requirement — Fenestration areas
BRIAN O'ROURKE
06/26/2024
Objection resolved — Addressed
06/25/2024
Objection raised — Admin
06/10/2024
Filed — Alteration CO
INTERIOR RENOVATION TO CHANGE TO A TWO FAMILY DWELLING AS PER PLANS TO INCLUDE MINOR STRUCTURAL WORK
M00508556-P2
06/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ATULKUMAR SHAH, PE
06/05/2024
Special inspection requirement — Lighting controls
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Lighting in dwelling units
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Fenestration air leakage
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Final
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Air barrier - visual inspection
BRIAN O'ROURKE
06/05/2024
Special inspection requirement — Fenestration areas
BRIAN O'ROURKE
04/08/2024
Permit issued — General Construction
M00508556-I1-ST
04/01/2024
Violation issued (HPD, closed)
A
03/04/2024
Signed off — Alteration
sprinkler install as per plans
M00803222-I1
02/22/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
02/02/2024
Signed off — Alteration
replace and relocate of existing boiler and relocate hwh
M00524959-I1
02/02/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/23/2024
Special inspection requirement — Sprinkler Systems
BRIAN O'ROURKE
01/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
BRIAN O'ROURKE
01/18/2024
Signed off — Alteration
M00524928-I1
01/16/2024
Filed — Alteration
sprinkler install as per plans
M00803222-P2
11/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
11/29/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN O'ROURKE
11/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
11/29/2023
Special inspection requirement — Sprinkler Systems
BRIAN O'ROURKE
11/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2023
Violation issued (HPD, closed)
I
11/13/2023
Filed — Alteration
replace and relocate of existing boiler and relocate hwh
M00524959-P2
11/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN O'ROURKE
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN O'ROURKE
11/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
11/13/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN O'ROURKE
10/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN O'ROURKE
10/31/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN O'ROURKE
10/24/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/26/2023
Filed — Alteration
sprinkler install as per plans
M00803222-P1
09/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/01/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/21/2023
Objection raised — Admin
08/21/2023
Objection resolved — Addressed
08/21/2023
Objection raised — Scope
08/21/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offH B H CONSTRUCTION INC04/08/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC07/10/2023
DOB NOWSprinklersSigned-offPRECISION SPKLR SVCS LLC07/03/2023
DOB NOWGeneral ConstructionPermit IssuedH B H CONSTRUCTION INC06/06/2023
DOB NOWGeneral ConstructionSigned-offENERGY BUILDING CONSTRUCT06/07/2022
2 projects · most recent 01/28/2025
General Wiring
FiledStatusContractorScope
01/28/2025CompleteE.T. ELEC'L CONTR CO INCGeneral Wiring
05/22/2024CompleteMECHANICAL CONST SYS CORPGeneral Wiring
1 project · most recent 06/10/2024
FiledStatusContractorScope
06/10/2024Signed-offH B H CONSTRUCTION INC3 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/22/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
02/02/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
11/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
07/07/2024Lighting in dwelling unitsBRIAN O'ROURKEenergy_progress
07/07/2024Lighting controlsBRIAN O'ROURKEenergy_progress
07/07/2024Air barrier - visual inspectionBRIAN O'ROURKEenergy_progress
07/07/2024FinalBRIAN O'ROURKEprogress
07/07/2024Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
07/07/2024Structural Stability – Alterations of existing buildingsATULKUMAR SHAH, PEspecial
07/07/2024Fenestration air leakageBRIAN O'ROURKEenergy_progress
07/07/2024Fenestration and door U-factor and product ratingsBRIAN O'ROURKEenergy_progress
07/07/2024Fenestration areasBRIAN O'ROURKEenergy_progress
06/05/2024Structural Stability – Alterations of existing buildingsATULKUMAR SHAH, PEspecial
06/05/2024Lighting controlsBRIAN O'ROURKEenergy_progress
06/05/2024Lighting in dwelling unitsBRIAN O'ROURKEenergy_progress
06/05/2024Fenestration air leakageBRIAN O'ROURKEenergy_progress
06/05/2024Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
06/05/2024FinalBRIAN O'ROURKEprogress
06/05/2024Fenestration and door U-factor and product ratingsBRIAN O'ROURKEenergy_progress
06/05/2024Air barrier - visual inspectionBRIAN O'ROURKEenergy_progress
06/05/2024Fenestration areasBRIAN O'ROURKEenergy_progress
01/23/2024Sprinkler SystemsBRIAN O'ROURKEspecial
01/23/2024Tenant Protection Plan ComplianceBRIAN O'ROURKEspecial
11/29/2023Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
11/29/2023Energy Code Compliance InspectionsBRIAN O'ROURKEprogress
11/29/2023Tenant Protection Plan Compliance—special
11/29/2023Sprinkler SystemsBRIAN O'ROURKEspecial
11/13/2023HVAC-R and service water heating equipmentBRIAN O'ROURKEenergy_progress
Latest 25 of 45.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/03/2026M00524928-I1Request digital key ↗
08/31/2026M00803222-P2Request digital key ↗
08/31/2026M00803222-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/13/2026M00524959-I1Open ↗
08/13/2026M00524959-P1Open ↗
08/13/2026M00508556-I1Open ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00508556-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature31
08/31/2026M00508556-P1Open ↗
08/31/2026M00508556-P1Open ↗
08/31/2026M00508556-P1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/01/2026M00803222-P2Open ↗
08/31/2026M00508556-P1Open ↗
08/31/2026M00508556-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00524928-I1Open ↗
08/31/2026M00803222-I1Open ↗
08/31/2026M00803222-P1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection14
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist11
08/31/2026M00803222-P1Open ↗
08/15/2026M00803222-I1Open ↗
08/13/2026M00524959-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Checklist3
08/15/2026M00508556-P1Open ↗
08/15/2026M00508556-P2Open ↗
08/15/2026M00508556-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/03/2026M00524928-I1Open ↗
08/31/2026M00803222-P1Open ↗
08/28/2026M00524959-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00508556-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00508556-I1Open ↗
08/13/2026M00524959-I1Open ↗