← Back
Over six families without stores
125 WEST 144 STREET
MANHATTAN · Harlem (North) · BIN 1060165
💬 Discuss this project
1920Year Built
5Stories
C1Building Class
R7-2Zoning
18,230 sfGross Floor Area
20Units
Rent Stabilized28 Open Violations 27 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: NYC HOUSING AUTHORITY · 5,297 sf lot · 3.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction59p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 6 docs
Floor 5Under Construction57p · 1 filing · 20 docs
Floor 4Under Construction55p · 1 filing · 20 docs
Floor 3Under Construction56p · 1 filing · 20 docs
Floor 2Under Construction55p · 1 filing · 20 docs
Floor 1Under Construction71p · 1 filing · 20 docs
CellarUnder Construction50p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY3008/22/2026
NYCHA407/08/2026
NYC HOUSING AUTHORITY303/22/2026
NEW YORK CITY HSG AUTHRY203/22/2026
HPD103/21/2026
SAM CITY MASTER TENANT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMTG CONSULTANTS INC1008/03/2026
ASHRAF CORP104/02/2025
WELLWORTH CONSULTING LLC110/08/2024
SLM ARCHITECTURE, P.C.303/25/2024
RLM ENGINEERING PLLC201/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES603/21/2026
JM ZONING, LLC.2003/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEGF & G PLUMBING CORPPlumbing807/08/2026
MONADNOCK GEN'L CONT INCGeneral Contractor508/22/2026
PREMIER CONSTRUCTION INCGeneral Contractor307/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor304/09/2026
BELL CONSTRUCTION SVCSGeneral Contractor204/09/2026
JOSEPH SORTINOElectrical103/21/2026
RICHARDS P AND H CO, INCPlumbing107/08/2026
KARL GRIFFITHElectrical103/21/2026
LEWIS, ROBERTElectrical103/21/2026
MARK REYESElectrical103/21/2026
STEPHENSON E., WElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC20031408/03/2026
Building Lifecycle
All (150)Filed (19)Permit Issued (24)Signed Off (5)Violation (60)Inspection (10)Objection (2)Special Inspection (30)
08/21/2026
Permit issued — Structural
M00883087-S1-ST
08/21/2026
Permit issued — General Construction
M00883087-I1-GC
08/18/2026
Special inspection requirement — Final
Christopher Drutjons
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/18/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
08/18/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
08/18/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
08/18/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
08/18/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
08/18/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
08/03/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883087-P5
07/24/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
07/21/2026
Special inspection requirement — Heating Systems
Christopher Drutjons
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
07/21/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
07/21/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
07/21/2026
Special inspection requirement — Final
Christopher Drutjons
07/21/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
07/21/2026
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
07/21/2026
Special inspection requirement — Shutoff dampers
Christopher Drutjons
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/17/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883087-S6
06/17/2026
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883087-S7
06/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
06/08/2026
Special inspection requirement — Maintenance information
Christopher Drutjons
06/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
06/08/2026
Special inspection requirement — Permanent certificate
Christopher Drutjons
06/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/30/2026
Violation issued (HPD, open)
B
05/30/2026
Violation issued (HPD, open)
B
05/30/2026
Violation issued (HPD, open)
B
05/30/2026
Violation issued (HPD, open)
B
05/26/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883087-P4
05/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2026
Permit issued — Structural
M00883087-S1-ST
05/01/2026
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: INSTALLATION OF NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT AND GAS PIPING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00883087-P3
05/01/2026
Violation issued (HPD, open)
C
05/01/2026
Violation issued (HPD, open)
A
05/01/2026
Violation issued (HPD, open)
B
05/01/2026
Violation issued (HPD, closed)
B
05/01/2026
Violation issued (HPD, closed)
C
04/29/2026
Violation issued (HPD, closed)
A
04/17/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. THE SIDEWALK SHED AT WEST 144TH STREET FRONT OF THE BUILDING.
M01123189-I1
04/15/2026
Permit issued — Plumbing
M00883087-S5-PL
04/14/2026
Permit issued — Plumbing
M00883087-S3-PL
04/06/2026
Signed off — Alteration
INSTALL SUSPENDED SCAFFOLDING, PERFORM FACADE INSPECTIONS AND INSTALL ROOF HOIST FOR EXTERIOR FACADE REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
M01132195-I1
04/06/2026
Permit issued — Suspended Scaffold
M01132195-I1-SC
04/04/2026
Violation issued (ECB, closed)
Unknown
04/04/2026
Violation issued (ECB, closed)
Unknown
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedMONADNOCK GEN'L CONT INC08/21/2026
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC08/21/2026
DOB NOWStructuralPermit IssuedMONADNOCK GEN'L CONT INC05/12/2026
DOB NOWPlumbingSigned-offCEGF & G PLUMBING CORP04/15/2026
DOB NOWPlumbingPermit IssuedCEGF & G PLUMBING CORP04/14/2026
DOB NOWSuspended ScaffoldSigned-offPREMIER CONSTRUCTION INC04/06/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/02/2026
DOB NOWPlumbingPermit IssuedBELL CONST SERV INC02/13/2026
DOB NOWPlumbingSigned-offBELL CONST SERV INC12/16/2025
DOB NOWMechanical SystemsPermit IssuedBELL CONSTRUCTION SVCS11/13/2025
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC10/30/2025
DOB NOWMechanical SystemsPermit IssuedBELL CONSTRUCTION SVCS10/15/2025
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/02/2025
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC09/09/2025
DOB NOWProtection and Mechanical MethodsSigned-offPREMIER CONSTRUCTION INC04/03/2025
DOB NOWBoiler EquipmentSigned-offBELL CONST SERV INC02/19/2025
DOB NOWPlumbingPermit IssuedBELL CONST SERV INC02/19/2025
DOB NOWPlumbingSigned-offBELL CONST SERV INC02/19/2025
DOB NOWBoiler EquipmentSigned-offBELL CONST SERV INC02/18/2025
DOB NOWSuspended ScaffoldSigned-offPREMIER CONSTRUCTION INC11/08/2024
DOB NOWGeneral ConstructionSigned-offPREMIER CONSTRUCTION INC10/18/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/08/2024
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK GEN'L CONT INC10/01/2024
DOB NOWPlumbingPermit IssuedRICHARDS P AND H CO, INC05/23/2022
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedMONADNOCK GEN'L CONT INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-AH24NL 24,500 BTU · Condensing Unit ×1
PUZ-HA24NHAI 24,000 BTU · Condensing Unit ×1
2 projects · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offBELL CONST SERV INCGas, Storm, Water/Sanitary
01/06/2022Permit IssuedRICHARDS P AND H CO, INCGas
5 projects · most recent 08/11/2026
General Wiring
FiledStatusContractorScope
08/11/2026CompleteGOTHAM TECHNICAL SERVICESGeneral Wiring
11/06/2024CompleteZENA ELECTRIC INC—
10/10/2024CompleteTOP SHELF ELECTRIC CORP—
10/07/2020CompleteHERTZ ELECTRIC LLC—
08/29/2018CompleteA TECH ELEC ENTERPRISESGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/24/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/20/2026Pass-Final PL - UndergroundPassView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 97
DateRequirementInspectorRole
08/18/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
08/18/2026Mechanical SystemsChristopher Drutjonsspecial
08/18/2026Tenant Protection Plan Compliance—special
08/18/2026Post-installed AnchorsChristopher Drutjonsspecial
08/18/2026Heating SystemsChristopher Drutjonsspecial
08/18/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
08/18/2026Permanent certificateChristopher Drutjonsenergy_progress
08/18/2026Shutoff dampersChristopher Drutjonsenergy_progress
08/18/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
08/18/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
08/18/2026Maintenance informationChristopher Drutjonsenergy_progress
08/18/2026FinalChristopher Drutjonsprogress
07/21/2026HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
07/21/2026Shutoff dampersChristopher Drutjonsenergy_progress
07/21/2026Permanent certificateChristopher Drutjonsenergy_progress
07/21/2026HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
07/21/2026Maintenance informationChristopher Drutjonsenergy_progress
07/21/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
07/21/2026FinalChristopher Drutjonsprogress
07/21/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Post-installed AnchorsChristopher Drutjonsspecial
07/21/2026Mechanical SystemsChristopher Drutjonsspecial
07/21/2026Heating SystemsChristopher Drutjonsspecial
06/08/2026HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
Latest 25 of 97.
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/03/2026M00651984-I1Request digital key ↗
09/03/2026M00652353-I1Request digital key ↗
08/26/2026M00883087-S4Request digital key ↗
Showing 3 of 21 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature22
09/23/2026M00883087-S6Open ↗
09/23/2026M00883087-S7Open ↗
09/06/2026M00651984-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00651984-I1Open ↗
09/03/2026M00652353-I1Open ↗
08/17/2026M00883087-P3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M00883087-S6Open ↗
09/23/2026M00883087-S7Open ↗
09/01/2026M00883087-S1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
09/03/2026M00651984-I1Open ↗
09/03/2026M00652353-I1Open ↗
08/17/2026M00883087-P1Open ↗
Showing 3 of 15 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/03/2026M00651984-I1Open ↗
08/17/2026M00883087-P3Open ↗
08/17/2026M00883087-P5Open ↗
Showing 3 of 16 on file for this type
▸Other Documents4
▸DOB NOWCalculations2
08/25/2026M01132195-I1Open ↗
08/13/2026M01132195-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/25/2026M01132195-I1Open ↗
08/13/2026M01132195-P1Open ↗