← Back
Condo, residential unit in elevator building
125 West 22nd Condominium
125 WEST 22 STREET · BIN 1087724
💬 Discuss this project
2006Year Built
17Stories
R4Building Class
C6-3AZoning
43,864 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: 125 WEST 22 STREET CONDOMINIUM · 6,238 sf lot · 7.03 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof1p · 1 filing · 6 docs
Bulkhead1p · 1 filing · 6 docs
Floor 102p · 1 filing · 3 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES1907/08/2026
3 BROTHERS CONSTRUCTION903/22/2026
123 W 22ND ST HOLDING203/22/2026
123 WEST 22ND STREET HOLDING2703/22/2026
PF REALTY COMPANY903/21/2026
FRAN PEARL EQUITIES203/21/2026
125 WEST 22ND CONDO PENMARK MGMT303/21/2026
PF REALILTY COMPANY203/21/2026
125 W 22ND STREET CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
PCS ENGINEERING103/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WORLDKOR CONSTRUCTION CORPGeneral Contractor407/08/2026
AIRTRONICS AIR COND CORPGeneral Contractor303/21/2026
PEAK PLUMBING SOLUTIONS LLCPlumbing307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor207/08/2026
PYRAMID RESTORATION NY LLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SONI ENGINEERING CONSULTI9819102/20/2026
WALSH ENGINEERING PLLC9393112/17/2025
LOMBARDO PROF ENGINEERING8566108/07/2024
DAVID KATZ, P.E.6087107/28/2021
Building Lifecycle
All (115)Filed (8)Permit Issued (9)Signed Off (6)Facade (FISP) (9)Violation (52)Inspection (4)Objection (10)Special Inspection (17)
08/24/2026
Signed off — Alteration
M01330114-I1
06/02/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01361467-I1
05/22/2026
Permit issued — Sidewalk Shed
M01361467-I1-SH
03/09/2026
Permit issued — Suspended Scaffold
M01357353-I1-SC
02/26/2026
Permit issued — Sidewalk Shed
M01361467-I1-SH
02/26/2026
Objection raised — Other
02/26/2026
Objection resolved — Addressed
02/24/2026
Cycle 9 facade report signed — SWARMP
02/20/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
M01357353-I1
02/19/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01361467-I1
02/09/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
02/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
nayan soni
02/09/2026
Special inspection requirement — Post-installed Anchors
nayan soni
02/06/2026
Permit issued — General Construction
M01330114-I1-GC
02/04/2026
Cycle 9 facade report submitted
01/09/2026
Cycle 9 facade inspection completed
12/17/2025
Filed — Alteration
M01330114-I1
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Brennan Walsh
12/08/2025
Special inspection requirement — Final
Brennan Walsh
12/08/2025
Special inspection requirement — Masonry
Brennan Walsh
08/05/2025
Signed off — Alteration
application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy..
M01085134-I1
08/22/2024
Permit issued — Suspended Scaffold
M01085134-I1-SC
08/21/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Other
08/07/2024
Filed — Alteration
application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy..
M01085134-I1
07/23/2024
Special inspection requirement — Post-installed Anchors
Michael Lombardo
07/11/2024
Signed off — Alteration
M00851699-I1
04/17/2024
Violation issued (HPD, closed)
A
03/13/2024
Signed off — Alteration
Interior renovation work for kitchen and two bathroom. There are no changes for Use, Means of Egress, or Occupancy under this application.
M00851676-I1
03/12/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Jung Choi
03/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jung Choi
03/06/2024
Filed — Alteration
Interior renovation work for kitchen and two bathroom. There are no changes for Use, Means of Egress, or Occupancy under this application.
M00851676-P1
02/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Jung Choi
02/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jung Choi
02/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2023
Permit issued — General Construction
M00851676-I1-GC
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/26/2023
Cycle 9 facade report signed — SWARMP
06/22/2023
Permit issued — Plumbing
M00851699-I1-PL
06/02/2023
Filed — Alteration
M00851699-I1
05/01/2023
Permit issued — General Construction
M00851676-I1-GC
04/11/2023
Objection raised — Fire_Protection
04/11/2023
Objection resolved — Addressed
04/11/2023
Objection raised — Scope
04/11/2023
Objection resolved — Addressed
04/11/2023
Objection raised — Other
04/11/2023
Objection resolved — Addressed
04/10/2023
Filed — Alteration
Interior renovation work for kitchen and two bathroom. There are no changes for Use, Means of Egress, or Occupancy under this application.
M00851676-I1
02/21/2023
Cycle 9 facade report submitted
02/16/2023
Cycle 9 facade inspection completed
03/09/2022
Violation issued (HPD, closed)
A
10/04/2021
Signed off — Alteration
DEDICATED ROOFTOP OUTDOOR AIR SYSTEM ON EXISTING ROOF CURB SUPPLYING FRESH AIRT TO BUILDING CORRIDORS. RECONNECT TO EXISTING SUPPLY DUCTWORK, OBTAIN CERTIFICATE OF COMPLIANCE. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00550622-I1
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/22/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY03/09/2026
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC02/26/2026
DOB NOWGeneral ConstructionSigned-offPYRAMID RESTORATION NY LL02/06/2026
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY08/22/2024
DOB NOWGeneral ConstructionSigned-offWORLDKOR CONSTRUCTION COR07/07/2023
DOB NOWPlumbingSigned-offPEAK PLUMBING SOLUTIONS L06/22/2023
DOB NOWGeneral ConstructionSigned-offWORLDKOR CONSTRUCTION COR05/01/2023
DOB NOWMechanical SystemsSigned-offAIRTRONICS AIR COND CORP10/01/2021
BISSDISSUEDRAEL AUTOMATIC SPR.CO INC08/10/2022
BISSPISSUEDRAEL AUTOMATIC SPR.CO INC08/11/2021
BISSDISSUEDRAEL AUTOMATIC SPR.CO INC08/09/2021
BISSPISSUEDRAEL AUTOMATIC SPR.CO INC08/10/2020
BISSDISSUEDRAEL AUTOMATIC SPR.CO INC08/10/2020
BISPLISSUEDDV PLUMBING INC03/13/2019
BISOTISSUEDUNITED BUILDERS GROUP LLC03/12/2019
BISSPISSUEDTVS MECHANICAL CORP05/30/2018
BISSPISSUEDTVS MECHANICAL CORP03/14/2018
BISSDISSUEDTVS MECHANICAL CORP03/14/2018
BISPLISSUEDR&A HEATING & CONTRG CO.I10/07/2013
BISSPISSUEDR & G MECHANICAL CORP10/07/2013
BISOTISSUEDNY INTERNATIONAL CONTRACT09/30/2013
BISOTISSUEDSPACIOUS LIVING GP LLC08/31/2012
BISSDISSUEDCMA PLUMBING & HEATING IN09/01/2011
BISSPISSUEDCMA PLUMBING & HEATING IN09/01/2011
BISPLISSUEDADRIANO PLMBG & HTG CORP03/29/2011
BISOTISSUEDHORIZONE REMODELING CORP03/28/2011
BISSDISSUEDCMA PLUMBING & HEATING IN08/24/2010
BISPLISSUEDCOPPER PLUMBING & HEATING08/24/2010
BISEQISSUEDMETRO CONSTRUCTION ENTER03/10/2010
BIS—ISSUEDMETRO CONSTRUCTION ENTER03/10/2010
BISEQISSUEDPERIMETER BRIDGE & SCAFFO04/08/2009
BISEQISSUEDMETRO CONSTRUCTION ENTER01/26/2009
BIS—ISSUEDMETRO CONSTRUCTION ENTER01/26/2009
BISBLISSUEDCOPPER PLUMBING & HEATING LLC12/21/2007
BISEQISSUEDMETRO CONSTRUCTION ENTERPRESE12/13/2007
BISSDISSUEDCMA PLUMBING & HEATING IN05/29/2007
BISPLISSUEDCOPPER PLUMBING & HEATING05/10/2007
BISEQISSUEDSHANNON BROTHERS LTD03/05/2007
BIS—ISSUEDMETRO CONSTRUCTION ENTERPRISES I12/29/2006
+ 14 more permits on file
5 projects · most recent 04/16/2026
General Wiring Lighting
FiledStatusContractorScope
04/16/2026CompleteAXCEL ELECTRIC CO., INC.—
02/18/2026CompleteBOROWIDE ELECT'L CONTR'S—
06/15/2023CompleteY.S ELECTRICGeneral Wiring, Lighting
10/07/2022CompleteAXCEL ELECTRIC CO., INC.—
10/09/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
1 project · most recent 02/19/2026
Sidewalk Shed
FiledStatusContractorScope
02/19/2026Signed-offANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 02/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
02/20/2026Permit IssuedSTREAMLINE CONSULTANTS NYSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/12/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/09/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
02/09/2026Structural Stability – Alterations of existing buildingsnayan sonispecial
02/09/2026Post-installed Anchorsnayan sonispecial
12/11/2025Tenant Protection Plan ComplianceBrennan Walshspecial
12/08/2025FinalBrennan Walshprogress
12/08/2025MasonryBrennan Walshspecial
07/23/2024Post-installed AnchorsMichael Lombardospecial
03/08/2024Energy Code Compliance InspectionsJung Choiprogress
03/08/2024Fire-Resistance Rated ConstructionJung Choiprogress
02/08/2024Energy Code Compliance InspectionsJung Choiprogress
02/08/2024Fire-Resistance Rated ConstructionJung Choiprogress
07/01/2021Maintenance informationDavid Katzenergy_progress
07/01/2021HVAC-R and service water heating equipmentDavid Katzenergy_progress
07/01/2021HVAC-R and service water heating system controlsDavid Katzenergy_progress
07/01/2021Energy Code Compliance InspectionsDavid Katzprogress
07/01/2021Mechanical SystemsDavid Katzspecial
07/01/2021FinalDavid Katzprogress
▾Documents — 231 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026M00550622-I1Request digital key ↗
08/31/2026M00851676-P1Request digital key ↗
08/31/2026M00851699-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits48
▸BISPLAN / WORK APPROVAL APPLICATION30
07/02/2025104051623Open ↗
06/09/2025104051623Open ↗
12/09/2024104052819Open ↗
Showing 3 of 30 on file for this type
▸BISWORK PERMIT APPLICATION16
08/13/2019104052819Open ↗
08/13/2019104054700Open ↗
03/13/2019123672221Open ↗
Showing 3 of 16 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
02/02/2008110056135Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/14/2009110419949Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
10/04/2022104051623Open ↗
▸BISVERIFY TAX LOT1
10/04/2022104051623Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/06/2025104051623Open ↗
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
11/12/2025104051623Open ↗
11/12/2025104051623Open ↗
08/09/2019123672221Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/07/2026M01085134-I1Open ↗
09/01/2026M01357353-I1Open ↗
09/01/2026M01357353-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00851699-I1Open ↗
08/20/2026M01330114-I1Open ↗
08/19/2026M01357353-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/29/2026M00851676-I1Open ↗
09/29/2026M00851676-I1Open ↗
08/30/2026M01330114-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
07/02/2025104051623Open ↗
09/10/2012121364308Open ↗
03/21/2011120636570Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
09/10/2012121364308Open ↗
09/10/2012121364308Open ↗
09/10/2012121364308Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT1
11/14/2007110019346Open ↗
▸Trade Schedules & Equipment24
▸BISEQUIPMENT USE PERMITS8
11/12/2025104051623Open ↗
11/12/2025104051623Open ↗
11/12/2025104051623Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
02/23/2015121732456Open ↗
05/08/2014121732456Open ↗
05/05/2014121732456Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/04/2019123672221Open ↗
06/13/2014121732456Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/12/2025104051623Open ↗
11/12/2025104051623Open ↗
▸BISSCHEDULE B - PLUMBING2
09/13/2013121732456Open ↗
03/21/2011120636570Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/14/2007110019346Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
09/03/2025104051623Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
06/21/2014121732456Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
06/04/2018104051623Open ↗
▸BISTenant Protection Plan and Notes1
02/04/2019123672221Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
12/05/2008110419949Open ↗
01/22/2008110071305Open ↗
01/03/2008110056135Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00851699-I1Open ↗
08/13/2026M00851676-I1Open ↗
08/13/2026M00851676-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/07/2019123672221Open ↗
09/13/2013121732456Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)2
09/10/2012121364308Open ↗
09/10/2012121364308Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/13/2019123672221Open ↗
02/04/2019123672221Open ↗
09/13/2013121732456Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/09/2019123672221Open ↗
05/06/2013121364308Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/10/2012121364308Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00550622-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/14/2025104051623Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
08/13/2018104051623Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
11/14/2007110019346Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
02/20/2025104052819Open ↗
03/28/2024104054700Open ↗
03/02/2020104051623Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
09/10/2012121364308Open ↗
03/21/2011120636570Open ↗
12/08/2008110419949Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER5
08/13/2019104052819Open ↗
08/13/2019104054700Open ↗
06/01/2018121732456Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/07/2018110056135Open ↗
05/06/2013121364308Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
02/26/2018110056135Open ↗
02/07/2018110056135Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/17/2024104051623Open ↗
06/21/2023104051623Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT7
08/09/2019123672221Open ↗
02/04/2019123672221Open ↗
09/13/2013121732456Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/19/2025104052819Open ↗
03/28/2024104054700Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
02/07/2018110056135Open ↗
▸Filing & Intake Forms18
▸BISBOROUGH INTAKE FORM10
03/02/2020104051623Open ↗
11/21/2019104051623Open ↗
08/09/2019123672221Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION4
10/09/2024104051623Open ↗
10/21/2019104052819Open ↗
03/07/2019123672221Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
02/04/2019123672221Open ↗
09/13/2013121732456Open ↗
09/10/2012121364308Open ↗
Showing 3 of 4 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
02/13/2018110056135Open ↗
02/07/2018110056135Open ↗
02/07/2018110056135Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations3
08/19/2026M01357353-P1Open ↗
08/13/2026M01085134-I1Open ↗
08/13/2026M01357353-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/19/2026M01357353-P1Open ↗
08/13/2026M01085134-I1Open ↗
08/13/2026M01357353-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
10/07/2013121732456Open ↗
09/10/2012121364308Open ↗