125 WEST 57TH STREET
MANHATTAN · BIN 1091067
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized0 Active Violations
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects123 West 57th Property Owner, LLC17 filings
RoofFacade inspection using industrial rope access14p · 5 filings
BulkheadTemporary suspended scaffold installation4p · 1 filing
Floor 26Eldridge IndustriesUnder Construction10p · 3 filings · 20 docs
Floor 25Eldridge IndustriesUnder Construction7p · 2 filings · 20 docs
Floor 24Eldridge IndustriesUnder Construction1 filing · 12 docs
Floor 23
Floor 22
Floor 21
Floor 20Marketing floor 24Under Construction7p · 1 filing · 15 docs
Floor 19Marketing floor 23Under Construction8p · 1 filing · 20 docs
Floor 18
Floor 17
Floor 16Marketing floor 208p · 1 filing · 13 docs
Floor 15Temporary access system installation1p · 1 filing
Floor 14
Floor 13Marketing floor 177p · 1 filing · 13 docs
Floor 12
Floor 11
Floor 10Marketing floor 1419p · 3 filings
Floor 910th floor interior fit out2p · 1 filing
Floor 8Structural steel and aluminum components4p · 1 filing
Floor 7Structural steel and aluminum components2p · 2 filings
Floor 6Calvary Baptist Church11p · 3 filings · 13 docs
Floor 5Calvary Baptist Church9p · 2 filings
Floor 4Calvary Baptist Church10p · 2 filings
Floor 3Calvary Baptist Church21p · 4 filings
Floor 2Calvary Baptist Church15p · 5 filings · 5 docs
Floor 1Calvary Baptist ChurchUnder Construction19p · 9 filings · 20 docs
MezzanineCalvary Baptist Church10p · 2 filings
CellarCalvary Baptist ChurchUnder Construction10p · 2 filings · 18 docs
Sub-CellarCalvary Baptist Church14p · 2 filings
Site & exteriorCalvary Baptist ChurchUnder Construction11 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Calvary Baptist Church2207/08/2026
125 West 57th Property Owner2003/22/2026
Trident General Contracting103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/15/2021$130.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WSP4309/17/2026
JLN Associates808/31/2026
Severud Associates605/26/2026
Eric Ettinger302/23/2026
Harrison Yamamoto102/06/2026
Fxcollaborative Architects902/05/2026
Bruce Carlson102/05/2026
Revans Design PE102/03/2026
Akfengineers611/11/2025
Universal Builders Supply1411/04/2025
Gensler105/06/2025
PCS Engineering103/12/2025
Skyline Rigging1502/18/2025
Black Sheep Engineering Group402/13/2025
Patuxent Engineering401/24/2025
Cpengineering111/11/2024
Lombardo Professional Engineering709/10/2024
Doka USA211/28/2023
Mayrich Construction108/22/2022
KZ Engineering907/19/2022
Breeze National204/04/2022
Wavic Engineering112/15/2021
Paul Perdek, Prof. Engineering209/10/2021
SRL Associates208/16/2021
FL&M Engineering Design & Inspection109/04/2020
Haider Engineering, P.E108/09/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates6703/21/2026
Eurocelt Expediting3603/21/2026
Patuxent Engineering803/21/2026
Lombardo Building Consultants503/21/2026
Lombardo Professional Engineering503/21/2026
Smep Design & Consultation203/21/2026
Synergy Building Consultants1103/21/2026
Suska203/21/2026
SNR Expediting Design203/21/2026
Expediter203/21/2026
A1 Expediting Service403/21/2026
Rigging Consultants203/21/2026
R Germain203/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM Construction ManagementGeneral Contractor1309/12/2026
Universal Builders SupplyScaffold707/08/2026
Leeding Builders GroupGeneral Contractor707/08/2026
A Plus PlumbingPlumbing407/08/2026
Tri-Star ConstructionGeneral Contractor407/08/2026
Rael Automatic Sprinkler CoFire Protection407/08/2026
Inter Connection ElectricElectrical303/21/2026
A + SprinklerFire Protection307/08/2026
A&H Express Plumbing & HeatingPlumbing309/22/2026
Doria ScaffoldingScaffold203/21/2026
Donato Plumbing GroupPlumbing207/08/2026
Leeding Builders GroupScaffold107/08/2026
Inter Connection EletricElectrical103/22/2026
4IR IdealGeneral Contractor107/08/2026
DonatoGeneral Contractor103/22/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
A Plus PlumbingFire Protection106/28/2026
Donato PlumbingPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eti Consultants76941309/17/2026
AK Engineering678708/31/2026
Special Testing & Consulting16884302/19/2026
Domani Inspection Service843402/18/2026
Metric Consulting and Ins1803102/05/2026
Revans Design PE4617102/03/2026
Skyline Rigging78801502/18/2025
Severud Associates2224202/03/2023
Socotec Engineering4983204/04/2022
Wavic Engineering1733112/15/2021
Building Lifecycle
All (300)Filed (76)Permit Issued (50)Signed Off (41)Violation (21)Inspection (33)Objection (49)Special Inspection (30)
09/29/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/21/2026
Permit issued — Plumbing
M01425082-S2-PL
09/21/2026
Permit issued — Sprinklers
M01425082-S3-EW-SP
09/17/2026
Filed — Alteration
Mechanical work filed in conjunction with M01371067-I1.
M01371067-P1
09/15/2026
Special inspection requirement — Post-installed Anchors
ANTHONY MUSUMECI
09/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY MUSUMECI
09/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY MUSUMECI
09/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY MUSUMECI
09/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY MUSUMECI
09/10/2026
Permit issued — Mechanical Systems
M01425082-S1-MS
09/09/2026
Signed off — Alteration
M01355015-I1
09/09/2026
Permit issued — General Construction
M01425082-I1-GC
09/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/01/2026
Special inspection requirement — Metering
Ari Kamo
09/01/2026
Special inspection requirement — Interior lighting power
Ari Kamo
09/01/2026
Special inspection requirement — Lighting controls
Ari Kamo
08/31/2026
Filed — Alteration
OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING)
M01425082-I1
08/31/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY MATERIAL HOIST SYSTEM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01299700-I1
08/31/2026
Filed — Alteration
OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING)
M01425082-S1
08/31/2026
Filed — Alteration
OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING)
M01425082-S3
08/31/2026
Filed — Alteration
OFFICE INTERIOR FIT-OUT FOR BOTH THE 25TH AND 26TH FLOORS (29TH & 30TH FLOOR MARKETING)
M01425082-S2
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
08/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
Ari Kamo
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
08/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
07/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ari Kamo
07/30/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
07/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ari Kamo
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
07/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
07/30/2026
Special inspection requirement — Sprayed fire-resistant materials
Ari Kamo
07/15/2026
Permit issued — Plumbing
M01393088-S2-PL
07/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/07/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/02/2026
Special inspection requirement — Final
Ari Kamo
07/01/2026
Special inspection requirement — Final
Ari Kamo
07/01/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/01/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
06/22/2026
Signed off — Alteration
Plumbing work for interior fit out at Calvary Baptist Church floors SC, Cel, 1-6, Mez 3 & Mez 6. Filed in conjunction with HUB Development NB Job # 121206550.
M08010598-I1
06/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/04/2026
Permit issued — General Construction
M01393088-I1-GC
06/04/2026
Permit issued — Structural
M01393088-S4-ST
06/03/2026
Signed off — Alteration
STRUCTURAL WORK TO INCLUDE INSTALLATION OF ACCESS PLATFORM AT 6TH FLOOR MECHANICAL ROOM.
M01352421-I1
06/03/2026
Signed off — Alteration
STRUCTURAL WORK TO INCLUDE INSTALLATION OF ACCESS PLATFORM AT 6TH FLOOR MECHANICAL ROOM.
M01352421-S1
05/29/2026
Signed off — Alteration
INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE 15th-20th FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01008633-I1
05/29/2026
Permit issued — Mechanical Systems
M01351122-I1-MS
05/28/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Ari Kamo
05/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
05/28/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
05/28/2026
Special inspection requirement — Structural Steel - Welding
Ari Kamo
05/26/2026
Filed — Alteration
Structural work on floors 25 & 26 (marketing floors 29 & 30). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014.
M01393088-P1
05/22/2026
Signed off — Alteration
Mechanical work for interior fit-out as shown on plans for 16th floor construction (20th floor marketing).
M01287312-S2
05/22/2026
Signed off — Alteration
Mechanical work for interior fit-out as shown on plans for 16th floor construction (20th floor marketing).
M01287312-S4
05/22/2026
Signed off — Alteration
Mechanical work for interior fit-out as shown on plans for 16th floor construction (20th floor marketing).
M01287312-S1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating09/21/2026
DOB NOWSprinklersPermit IssuedA&H Express Plumbing & Heating09/21/2026
DOB NOWMechanical SystemsPermit IssuedJRM Construction Management09/10/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management09/09/2026
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating07/15/2026
DOB NOWGeneral ConstructionPermit IssuedJRM Construction Management06/04/2026
DOB NOWStructuralSigned-offJRM Construction Management06/04/2026
DOB NOWMechanical SystemsPermit Issued4IR Ideal05/29/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire04/30/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing04/29/2026
DOB NOWSprinklersPermit IssuedA Plus Plumbing04/29/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing04/16/2026
DOB NOWMechanical SystemsSigned-offJRM Construction Management04/10/2026
DOB NOWGeneral ConstructionSigned-offJRM Construction Management04/07/2026
DOB NOWMechanical SystemsSigned-offLeeding Builders Group02/19/2026
DOB NOWMechanical SystemsPermit IssuedTri-Star Construction02/19/2026
DOB NOWStructuralSigned-offLeeding Builders Group02/12/2026
DOB NOWGeneral ConstructionPermit IssuedTri-Star Construction02/12/2026
DOB NOWStructuralPermit IssuedTri-Star Construction02/12/2026
DOB NOWGeneral ConstructionSigned-offLeeding Builders Group02/11/2026
DOB NOWSprinklersPermit IssuedA + Sprinkler01/26/2026
DOB NOWPlumbingSigned-offA Plus Plumbing01/12/2026
DOB NOWPlumbingSigned-offA Plus Plumbing01/06/2026
DOB NOWSprinklersPermit IssuedA + Sprinkler01/06/2026
DOB NOWPlumbingPermit IssuedA Plus Plumbing01/06/2026
DOB NOWSprinklersSigned-offA + Sprinkler01/06/2026
DOB NOWGeneral ConstructionSigned-offJRM Construction Management12/18/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management12/18/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management12/17/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management12/17/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management12/17/2025
DOB NOWMechanical SystemsSigned-offJRM Construction Management12/16/2025
DOB NOWGeneral ConstructionSigned-offJRM Construction Management12/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offUniversal Build Supp11/06/2025
DOB NOWMechanical SystemsSigned-offLeeding Builders Group08/22/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co08/21/2025
DOB NOWGeneral ConstructionSigned-offLeeding Builders Group08/21/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co07/15/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System07/15/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co07/15/2025
+ 22 more permits on file
3 projects · most recent 08/31/2026
Air Conditioning Systems Others Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2026Permit IssuedJRM Construction ManagementAir Conditioning Systems—
02/03/2026Permit Issued4IR IdealOthers
Other
Smog-Hog PSG-13-3 AIOFPSB 3,500 CFM ×1
11/11/2025Signed-offLeeding Builders GroupAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Aaon SA-035-8-A-ET09-EJN 425,000 BTU · Rooftop Unit ×6
WHA-015-B-A-C-2-0A0-00 14,140 BTU · Rooftop Unit ×4
SA-023-8-A-ER09-EJJ 231,000 BTU · Rooftop Unit ×2
SA-030-8-A-ET09-EJM 365,000 BTU · Rooftop Unit ×2
SA-030-8-B-ET09-EJM 365,000 BTU ×2
SA-030-8-B-ET09-EJN 368,000 BTU · Makeup Air ×2
SA-035-8-B-ET09-EJN 425,000 BTU · Rooftop Unit ×2
SB-016-8-0-E80A-E2N 184,000 BTU · Rooftop Unit ×2
SB-016-B-A-E80A-E2N 181,000 BTU · Rooftop Unit ×2
WHA-018-B-A-C-2-0A0-00 49,000 BTU · Ahu ×2
WHA-048-E-A--D-2-0A0-00 49,000 BTU · Ahu ×2
Mammoth SO042020-01 488,000 BTU ×2
SO042020-02 488,000 BTU ×2
Climatemaster SCP048A-HS-C0S0VS 49,000 BTU · Wshp ×2
Ducts & Piping
N/A N/A Ductwork ×2
5 projects · most recent 09/17/2026
Sprinkler System
FiledStatusContractorScope
09/17/2026Permit IssuedA Plus PlumbingSprinkler System
08/31/2026——Sprinkler System
12/16/2025Signed-offA + Sprinkler86 heads
12/12/2025Permit IssuedA + SprinklerSprinkler System
11/11/2025Signed-offRael Automatic Sprinkler CoSprinkler System
7 projects · most recent 09/17/2026
Water/Sanitary Gas
FiledStatusContractorScope
09/17/2026Permit IssuedA Plus PlumbingWater/Sanitary
08/31/2026Permit IssuedDependable MechanicalWater/Sanitary
05/26/2026Permit IssuedDependable MechanicalWater/Sanitary
12/16/2025Signed-offA Plus Plumbing—
12/16/2025Signed-offA Plus PlumbingWater/Sanitary
12/12/2025Permit IssuedA Plus PlumbingWater/Sanitary
11/11/2025Signed-offDonatoGas, Water/Sanitary
25 projects · most recent 09/08/2026
General Wiring Lighting
FiledStatusContractorScope
09/08/2026Permit IssuedErne Valley ElectricalGeneral Wiring
08/24/2026CompleteKnight Electrical ServiceGeneral Wiring
07/23/2026Permit IssuedV Electric NY—
06/03/2026CompleteV Electric NY—
05/29/2026CompleteV Electric NYGeneral Wiring
05/08/2026Permit IssuedAgir Electrical Ltd D/B/AGeneral Wiring
04/22/2026Permit IssuedInter Connection Eletric—
02/04/2026CompleteInter Connection EletricGeneral Wiring
02/04/2026CompleteInter Connection EletricGeneral Wiring
02/02/2026CompleteInter Connection EletricGeneral Wiring
01/27/2026CompleteInter Connection Eletric—
01/27/2026CompleteInter Connection Eletric—
01/27/2026CompleteInter Connection Eletric—
12/10/2025Permit IssuedJSP Electl CNTNGGeneral Wiring
01/24/2025CompleteCentrifugal ElectricGeneral Wiring, Lighting
4 projects · most recent 05/26/2026
Steel
FiledStatusContractorScope
05/26/2026Permit IssuedDependable MechanicalSteel
02/05/2026Signed-offLeeding Builders GroupSteel
02/03/2026Permit Issued4IR Ideal1 scope_items
11/11/2025Signed-offDonatoSteel
▾Field Inspections (DOB CAP) — 34
DateTypeResultReport
09/29/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/07/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/13/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/11/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/27/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 34.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/15/2026Fire-Resistant Penetrations and JointsANTHONY MUSUMECIspecial
09/15/2026HVAC-R and service water heating system controlsANTHONY MUSUMECIenergy_progress
09/15/2026HVAC-R and service water heating equipmentANTHONY MUSUMECIenergy_progress
09/15/2026HVAC-R and service water piping design and insulationANTHONY MUSUMECIenergy_progress
09/15/2026Post-installed AnchorsANTHONY MUSUMECIspecial
09/01/2026MeteringAri Kamoenergy_progress
09/01/2026Lighting controlsAri Kamoenergy_progress
09/01/2026Interior lighting powerAri Kamoenergy_progress
08/18/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
08/18/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
08/18/2026Duct leakage testing, insulation and designAri Kamoenergy_progress
08/18/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
08/05/2026Fire-Resistance Rated ConstructionAri Kamoprogress
08/05/2026Energy Code Compliance InspectionsAri Kamoprogress
07/30/2026Post-installed AnchorsAri Kamospecial
07/30/2026HVAC-R and service water heating equipmentAri Kamoenergy_progress
07/30/2026HVAC-R and service water piping design and insulationAri Kamoenergy_progress
07/30/2026HVAC-R and service water heating system controlsAri Kamoenergy_progress
07/30/2026Fire-Resistant Penetrations and JointsAri Kamospecial
07/30/2026Fire-Resistant Penetrations and JointsAri Kamospecial
07/30/2026Fire-Resistance Rated ConstructionAri Kamoprogress
07/30/2026Sprayed fire-resistant materialsAri Kamospecial
07/02/2026FinalAri Kamoprogress
07/01/2026Sprinkler SystemsAri Kamospecial
07/01/2026Mechanical SystemsAri Kamospecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Eldridge IndustriesOfficeFloors 24–26
Project M01425082 Alteration · Permit Entire · 08/31/2026
Project M01393088 Alteration · Permit Entire · 05/12/2026
Calvary Baptist ChurchReligiousSub-cellar, Cellar, Floors 1–6, Mezzanine
Project M01352421 Alteration · LOC Issued · 02/05/2026
Project M01333153 Alteration · LOC Issued · 12/15/2025
Project M08010598 Alteration · LOC Issued · 10/17/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 770 on file (BIS + DOB NOW)
▸Plans & Drawings151
▸DOB NOWPlans/Sketch120
10/04/2026M01425082-S1Request digital key ↗
10/04/2026M01425082-S3Request digital key ↗
10/04/2026M01425082-S2Request digital key ↗
Showing 3 of 120 on file for this type
▸DOB NOWPlans/Sketch - Standpipe7
09/04/2026M00350338-I1Request digital key ↗
Showing 1 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
08/31/2026M00320864-I1Request digital key ↗
08/31/2026M00320864-P3Request digital key ↗
08/31/2026M00320864-P5Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00207851-I1Request digital key ↗
09/04/2026M00394279-I1Request digital key ↗
▸Applications & Permits51
▸BISPLAN / WORK APPROVAL APPLICATION36
02/09/2026141022408Open ↗
01/15/2026140928147Open ↗
12/30/2025121206550Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION12
04/15/2025121206550Open ↗
04/15/2025121206550Open ↗
04/10/2024121206550Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
05/02/2025140928147Open ↗
Showing 1 of 2 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
09/14/2022121206550Open ↗
▸Zoning, Tax Lot & Property Records14
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
01/10/2025121254098Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
01/10/2025121254098Open ↗
12/09/2021121206550Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION2
01/10/2025121254098Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION2
01/10/2025121254098Open ↗
Showing 1 of 2 on file for this type
▸BISZONING RESOLUTION DETERMINATION2
12/09/2021121206550Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/10/2025121254098Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/15/2025121206550Open ↗
▸BISZONING DIAGRAM1
12/09/2021121206550Open ↗
▸Seals & Professional Certifications329
▸DOB NOWDPL-1: Design Professional Seal & Signature147
10/14/2026M01371067-P1Open ↗
09/10/2026M01425082-S1Open ↗
09/10/2026M01425082-S3Open ↗
Showing 3 of 147 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature89
10/14/2026M01371067-P1Open ↗
10/14/2026M01371067-P1Open ↗
10/12/2026M00320864-P2Open ↗
Showing 3 of 89 on file for this type
▸DOB NOWProgress Inspector Seal & Signature81
10/14/2026M01371067-P1Open ↗
10/14/2026M01371067-P1Open ↗
10/14/2026M01371067-P1Open ↗
Showing 3 of 81 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
01/20/2023121206550Open ↗
09/15/2022121206550Open ↗
09/15/2022121206550Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
02/23/2023141022408Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/23/2023141022408Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection12
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE7
09/15/2022121206550Open ↗
09/15/2022121206550Open ↗
09/15/2022121206550Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/09/2021121206550Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
09/05/2026M00207851-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
02/23/2023141022408Open ↗
09/14/2022121206550Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/29/2026141022408Open ↗
07/23/2025121206550Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/18/2024121206550Open ↗
▸BISFENESTRATION AREAS1
05/23/2025121206550Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/23/2025121206550Open ↗
▸BISNYCECC ANALYSIS1
05/19/2023141022408Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/18/2024121206550Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/15/2022121206550Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports51
▸BISTECHNICAL REPORT: RESPONSIBILITY34
06/05/2025121206550Open ↗
11/18/2024121206550Open ↗
09/08/2023121206550Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
09/27/2022121206550Open ↗
09/27/2022121206550Open ↗
09/26/2022121206550Open ↗
Showing 3 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
09/14/2022121206550Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/18/2023121206550Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/02/2025121206550Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/11/2025121206550Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/28/2025121206550Open ↗
▸BISMASONRY1
11/18/2024121206550Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/18/2024121206550Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
11/18/2025121206550Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
05/06/2024121206550Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/16/2024121206550Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/06/2024121206550Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWConcrete Testing Exception Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs53
▸BISSCHEDULE A - OCCUPANCY / USE18
12/30/2025121206550Open ↗
06/06/2025121206550Open ↗
05/30/2025121206550Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSUPERSEDING LETTER9
04/14/2025121206550Open ↗
04/14/2025121206550Open ↗
04/10/2024121206550Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/15/2022121206550Open ↗
09/15/2022121206550Open ↗
09/15/2022121206550Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
07/11/2025121206550Open ↗
01/23/2024121206550Open ↗
09/07/2022121206550Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/15/2022121206550Open ↗
09/14/2022121206550Open ↗
▸BISCOST AFFIDAVIT1
02/23/2023141022408Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION13
07/11/2025121206550Open ↗
11/27/2024121206550Open ↗
10/22/2024140928147Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM3
02/20/2024121206550Open ↗
01/25/2024121206550Open ↗
01/10/2024121206550Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
02/23/2023141022408Open ↗
Showing 1 of 2 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents45
▸DOB NOWManufacturer's Specifications15
08/27/2026M00998972-I1Open ↗
08/27/2026M00998972-P2Open ↗
08/27/2026M00998972-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWCalculations15
08/27/2026M00998972-I1Open ↗
08/27/2026M00998972-P1Open ↗
08/27/2026M00998972-P2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWAlternate Plan 13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWStructural Peer Review Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWaiver Document2
08/27/2026M01008633-I1Open ↗
Showing 1 of 2 on file for this type
▸BISSTRUCTURAL PEER REVIEW REQUIRED1
12/09/2021121206550Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/10/2025121254098Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
07/24/2025121206550Open ↗
▸BISUNDERPINNING (2014)1
05/06/2024121206550Open ↗
▸BISVESTIBULES1
07/23/2025121206550Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/25/2024121206550Open ↗
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type